TOLEDO EDISON 4enn,c-,c m DONALD C. SHELTON vanw,n-a =
Docket Number 50-346 License Number NPF-3 Serial Number 1781 May 31, 1990
- United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555 Subj ect :
License Amendment Application to Revise Technical Specification 3.6.4.1, Combustible Gas Control - Hydrogen Analyzers (TAC Number 76184)
Gentlemen:
Enclosed is an application for an amendment to the Davis-Besse Nuclear Power Station (DBNPS), Unit Number 1 Operating License Number NPP-3, Appendix A, Technical Specifications to reflect the change attached. The proposed change-
' involves Technical Specification (TS) 3/4.6.4.1, combustible Gas control -
Hydrogen Analyzers.
This request proposes adding an additional Action statemer.: which would @;;y when both hydrogen analyzers are inoperable and allov 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to return a of the two inoperable hydrogen analyzers to operable status or be-in at least hot-standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
Presently, if both hydrogen analyzers l'
were_to become inoperable, TS 3.0.3 vould be entered which requires action to y-
'be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the plant in a Mode in which the l
Specification does not apply, i.e., Hode 3~(hot standby). This request is consistent with-the Nuclear Regulatory Commission's guidance, Generic Letter.
L Number 83-37, dated November 1, 1983, NUREG-0737 Technical Specifications, item II.F.1.6, which, in the situation of both hydrogen analyzers being inoperable allows for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to repair one of the analyzers prior to having to. shut down the plant.
This' request resulted from Toledo Edison's Technical Specification Verification Program - Phase II commitment to the Nuclear Regulatory Commission (NRC) to perform a review of its Technical Specifications and propose appropriate changes. Toledo Edison requests that this amendment be issued by the NRC by December 4, 1990, thereby revising a Limiting condition L
for Operation which could cause an unnecessary shutdown of the plant.
9006080234 900$31
,Ogj PDR ADOCK 05000346 P
PDC j
11 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHlO 43652 1
II
I
-f.
s Dock 0t Nu bar 50-346 f,1 cense Number NPF-3 Serial Number.1781 Page 2 If your have'any questions regarding this amendment request please contact Mr. R. V. Schrauder, Manager.- Nuclear Licensing, at (419) 249-2366.
Very truly yours, JSL/ssg i
Attachment Lect P. M. Byron, DB-1 NRC Senior Resident Inspector A.' B. Davis, Regional Administrator, NRC Region III T. V. '.'ambach,. DB-1 NRC Senior Project Manager State of Ohio f