Submits Supplemental Response to Insp Rept 50-346/89-21. Util Rescinds Denial & Accepts Alleged Violation
ML20063P998
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/09/1990
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1-927, NUDOCS 9008160161
Download: ML20063P998 (2)


Text

s .

. sm .

i ,

e> -

t TOLEDO EDISON  :

t A Cower (naqh Campany DONALD C. SHELTON we u m raw .

l419} Pd9 P330 Docket Number 50-346 i License Number NPF-3 Serial Number 1-927 August 9, 1990 United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555 i

Subject:

Supplemental Response to Inspection Report Number 50-345/89021 Gentlemen ,

Toledo Edison (TE) received Inspection Report Number 89021 (Log Number 1-2195) and provided its response to a Notice of Violation identified in the inspection report (Violation 89021-01) concerning pressure testing performed at Davis-Besse Nucl.est Power Station (DBNPS) in lieu of ASME Code required hydrostatic pressure testing. In the response, dated February 6, 1990 (Serial Number 1-908), Toledo Edison denied the alleged violation.

On July 31, 1990, members of the Toledo Edison staff met with the NRC staff at the Region III office to discuss issues relating to the alleged violation. .

Based upon these discussions, Toledo Edison hereby rescinds its denial and  ;

accepts the alleged violation.

On July 17, 1990, Toledo Edison subm!tted a request for relief from the requirements of Section XI of the ASME Code concerning hydrostatic testing i requirements (Serial Kaaber 1829). Relief from the requirements of IVA-5212 and IVA-5213 for certain systems where the IIT vas used during the first l l

! ten-year in-service inspection (ISI) interval was requested. Also, by letter J l dated July 17, 1990 (Serial Number 1823), Toledo Edison proposed to perform )

hydrostatic tests, in accordance with the ASME Code, on affected systems during the first period of the second ten-year ISI interval. The second ten-year ISI interval begins on September 21, 1990. Therefore, based on the above submittals, no further corrective actions are necessary.

l l

2 9008160161 900809 / 1 PDR ADOCK 03000346 /, nQ '

o PDC THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENut TOLEDO. OHIO 43652

  • 4 ,,fr Dock t Number 50-3f6 )

6 Licens3 Number NPF-3 j

' Serial Number 1-927 I

Page 2 l

Should you require any additional information concerning this matter, please:

contact Mr. R. V. Schrauder, Manager - Nuclear Licensing, at (419) 249-2366.  !

i Very tr ,

yours,  ;

ffd2q. j'k['Nss [

t 12KP/nmb  !

cci P. M. Byron,-DB-1 NRC Senior Resident: Inspector' .

l A. B. Davis, Regional Administrator,-NRC Region III. .

M. D. Lynch, DB-1 NRC Senior Project Manager- [