4 TOLEDO EDISON A Centervr (norgy Ctvqany DONALD C. SHELTON Docket Number 50-346 License Number NPF-3 Serial Number 1794
, 1990 Mt.j United States Nuclear Regulatory Commission NRC Document Control Desk Vashington, D. C.
20555
Subject:
Revision 11 to the Updated Safety Analysis Report Gentlemen:
The Toledo Edison Coinpany is submitting, pursuant to 10CFR50.71, one (1) original plus ten copies of Revision 11 to the Updated Safety' Analysis Report (USAR) for the Davis-Besse Nuclear Pover' Station, Unit Number 1.
USAR, Revision 11 is an interim submittal, the purpose of which is limited to updating Table 6.2-23, Containment Vessel Isolation Valve Arrangements, consistent with removal of Technical Specification Table 3.6-2, Containment Isolation Valves, from the Operating License Appendix A, Technical Specifications. Removal of Table 3.6-2 from the Technical Specifications was approved by the Nuclear Regulatory Commission (NRC)'in License Amendment Number 147, dated April 13, 1990 (TAC Number 75235).
Please insert Revision 11 material, dated April, 1990 into the Updated Safety Analysis Report per the attached instructions (Attachment 2).
Should you require additional information concerning this matter, please contact Mr. R. V. Schrauder, Manager - Nuclear Licensing at (419) 249-2366.
Very truly yours, IL LL2
/
JCS/ssg Attachments Q
cc:
P. M. Byron, DB-1 NRC Senior Resident Inspector 1
j A._B. Davis, Regional Administrator, NRC Region III
[k l O i
T. V. Vambach, DB-1 NRC Senior Project Manager 1
THE TOLEDO EDISON COMPANY
. EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 9006070175 900531 PDR ADOCK 05000346 K
a*
Dock 3t Number 50-346 Liclns] Nu ber NPF-3 Serial Number 1794 Page 1 SUBMITTAL OF REVISION 11 TO THE DAVIS-BESSE UPDATED SAFETY ANALYSIS REPORT (USAR)
FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 Enclosed are the original and 10 copies of Revision 11 to the Davis-Besse Nuclear Power Station, Unit No. 1, Updated Safety Analysis Report.
By:
/M/ m D. C. Shelton,-Vice President - Nuclear Svorn and subscribed before me this 31st day of May,1990.
i Y & Y 101 Notary Puf>lic, State of Ohio WELYNL DRESS NOTARYPUCUC, STATEOFOHIO 4 C a s caE<p Why28,1W4 q t/