_

CALCULATION / PROBLEM COVER SHEET Calculation /Pr'oblem No: 1040-001-027

Title:

Primary Pressure Control Systein 2.24 Client: Toledo Edison Company Project: Davis-Besse Unit 1 J

hb No, 1040-001-671 I&E Bulletin 79-OlB Equipment Quahrication De:Ign input /Reforences:

Design Inputs are outlined in the Cover Report.

AO umptions:

Assumptions are outlined in the Cover Report.

M:thod:

Methods are outlined in the Cover Report.

R: marks:

EDS Nuclear Report No. 02-1040-1076.

REV. NO.

REVISION

' APPROVED DATE O

I E dg N L'

[D-2-9 demYilhoua bu&ws bl/c bjaicbusJY

/k/Eg i

AJ/b h 0 s h n k b 3 z

da.wu n w w:e

&:n un

//

umemm Sheet __ !

of P

Frcility: D3vic-122ca Unit 1 Docket:

50-346 MASTER LIST HARSH ENVIRONMENT Inder No: 224M-001

_ PRIMARY PRESSURE CONTROL SYSTEM Rev.: __

2 Prepared by:

Date: f_ /

Checked by:

A<. M_ -j ~

Date: g//d i

l I

l l

1 l

l L

LOCATION l Worksheet l I Plant I

1 Inside l

Outside l

I I

l_ Index No.

I Rev. lID Number l l

Primary l

Primary l

Generic Name l

1 I

I I

I Containment l Containment i REMARKS l

l l 224H-004 l 2 ILTRC14-2 l Level Transmitter i

l i

l l 224H-004 l

2 ILTRC14-2 i Level Transmitter i

El. 3 l

l I

l 224H-005 l

2 lMV02000 l Valve Motor Operator l

El. 3 I

I l

l 224H-006 l

2 lMV0239A l Valve Motor Operator I containment I l

I l 224H-007 l 2 lMV0233B l Valve Motor Operator I containment l l

l 224H-006 l

2 lMV27350 l

I Valve Motor Operator l Containment l l

l l 224H-009 l 2 lMV27360 i Valve Motor Operator i Containment l l

I 224H-010 l 2 lMVRCO20 i Valve Motor Operator l

l l

1 224H-Oll l 2 IMVRC100 l

Rs. 314 I

I Valve Motor Operator IRelief VI Rs.l I

l 224H-012 1

2 IMVRC110 l

i Valve Motor Operator IRelief VI Rs.l l

l 224H-013 l

2 l Deleted l

IRelief VI Rm.)

l l

l 224H-014 l 2 lZSDHilA l Limit Switch I

l l

l I

l 224H-015 1 2 l2SDH12A I Limit Switch l

Rm. 220 l

l l

l l 2 lBEllA l Motor Control Center l

Rm. 220 l

l l

l l

2 IBEllB l Motor Control Center 1

l Rs. 209 l

See 2.21 l

l l

l 2 IBF11A l Motor Control Center l

l Rm. 304 l

See 2.21 l

l l

2 (CDEllA l Disconnect Switch cabinet l

l Rs. 427 i

See 2.21 l

I I

2 BCDEllB-1 1 Disconnect Switch Cabinet l

l l 2 lCDF11A-1 l

Rs. 304 l

See 2.21 1

l Disconnect Switch Cabinet l

l Rm. 304 i

See 2.21 l

l l 2 l CDF11 A-2 i Disconnect Switch Cabinet l

l l 2 lEV27360 l Terminal Block Box l

l Rs. 427 i

See 2.21 l

l Rm. 427 i

See 2.21 l

l l 2 IJT3953 I Terminal Block Box l

l l 2 lJT3954 l

Rm. 314 l

See 2.21 l

l l Terminal Block Box l

Rs. 410 l

1 See 2.21 l

i 1 2 INV27360 l Push Button Switch l

Rs. 410 l

1 See 2.21 l

l l

2 IPTRC2Al l Pressure Transmitter l

l Rs. 314 l

See 2.21 l

I I 2 lPTRC2A2 l Pressure Transmitter i

Rs. 410 l

l See 2.18 I

i l

l 2

lRC4601 i Relay Cabinet l

Rs. 410 l

I 1

2 IRC4602 l Relay Cabinet I

l See 2.18 I

i l

l 1

l l

l Rm. 427 l

See 2.21 1

i Rm. 427 i

See 2.21 I

I I

I I

l 1

l I

I I

I l

1 1

1 I

l l

I I

I I

I I

I I

I l

)

Facility: Davis-Besse Unit 1 Docket:

50-346 MASTER LIST NON-HARSH ENVIRONMENT Index No: _224M-00 2_

PRIMARY PRESSURE CONTROL SYSTEM Rev.:

2 Prepared by:

Date fei 2

Checked by:

oM M [

Date: ///.,1//J l

l 1

l l

I l

l l_

LOCATION I Worksheet l l Plant I

Inside i

Outside i

l l

I__ Index No.__j Rev. IID Number i l

Primary l

Primary i

Generic Name I

I i

i l

1 Containment l Containment l REMARKS l

I l

I O IBE12A s

iMotor Control Center i

I l

l 0 lBF12A I

l Motor Control Center I

l Rm. 429 I

I 1

I O IBF128 l Motor Control Center I

I Rs. 428 I

l 1

l 1 0 IBF21A IMotor control Center I

I I

l 0 IC3630 l

Rs. 319 l

lAuxiliary Shutdown Cabinet I

l Rs. 310 l

l I

i 0 IC5705 Iconsole Cabinet i

I i

1 0 IC5759B I

Rs. 324 l

INon-Nuclear Instrumentation Cabinet l

l Rm. 505 l

1 l

l 0 ICDE12A-2 IDisconnect Switch Cabinet l

l Rs. 505 I

I l

1 0 (CDF12A-1 IDisconnect Switch Cabinet i

I Rm. 429 l

I l 0 (CDF12B I

i 1 0 (LYRC14 l Level Relay i

I Rm. 319 l

l Disconnect Switch Cabinet i

1 I

Rm. 428 l

{

l l

1 0 lRC3716 l Relay Cabinet i

I Rs. 505 l

I l 0 IRC4604 l Relay Cabinet l

I Rm. 310 l

l l

l l 0 lRC4605 l Relay Cabinet t

l l

l l

1 i

I Rs. 428 l

t l

Rs. 429 l

4 l

i I

I I

I l

I I

1 I

I I

I I

l i

i i

i i

I I

I I

I I

I i

l I

I I

i I

I I

i i

I I

I i

l I

i i

l i

i I

I j

i I

i l

i i

i l

I I

I I

i l

i I

j l

I I

I I

I I

i I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

l

~

l i

I I

I I

I i

I I

I I

I I

I I

I I

I I

I I

I I

I I

i i

I I

I I

I I

I I

l i

i l

I I

I I

I

O O

O Facility: Davic-Cesse Unit 1 Docket:

50-346 MASTER LIST Prepared by

_ PRIMARY PRESSURE CONTROL SYSTEM Index No 224f-003 Rev.:

j Checked by ef A

Date [O /tp df 2

pc4,p. 4-i,,uf Date

~

3/ f4 l

l l

1 l

I I

I Worksheet l l Plant i

l I

I Index No.

I Rev. IID Number i I_

LOCATION l

~

1 1

Inside i

Outside l

1 1

i I

i Generic Name I

Primary i

Primary l

l I

I i

i i Containment i Containment i I

l i

i l

l I

I REMARKS I

I i

I I

I I

I i

I I

I i

I i

I i

i l

i I

I l

i 1

1 I

i I

i I

l I

i l

I I

I I

i I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

l I

I I

I I

I I

I I

I I

I i

1 I

I I

I i

i I

I I

I I

I I

I I

I I

I I

I I

I I

I I

l I

i I

I i'

I i

i l

I I

I i

I I

I I

I I

I I

I I

I I

I i

I i

i i

l I

I I

I I

I I

I I

I I

I 4

I I

I I

I I

I i

i I

I i

I i

l i

I I

i l

i I

I I

i i

I I

l i

I I

I l

I I

1 I

I I

I l

i i

2 I

I I

I I

I i

I I

I I

I I

i I

I I

I I

I I

I I

I 1

I I

I I

I I

I I

I I

I I

I I

i i

i I

I i

i I

I I

I I

l I

I I

i

n n

O Facility: La-McDo Onit 1 SYSTEN COMPONL/ EVALUATION NORKSHEET Index ho.:.2245-004 i

Dockst:

50-346 Rev.:

2 i Prepared by:

4' M [<// b I Date:

7 / f [ f,'

checked by:

N~7A'44 A Date:

V i' f, //

i

l Il l

l l

I lEQUIPMENT DESCRIPYION ll ENVIRONNENT l

DOCUMENTATION REF.

l Qualification l Outstanding l l

ll Parameter l Specification l Qualification ISpecificationlDualificationi Nethod i

Items 1

i i Il i

I I

I I

I I

l lSycten: Primary Pressure ll Operating i 1 Year i

1.1 Years i

Note 2.

I J-1 1

Analysis l

Mone l

1 Control llTime l

l l

l Note 3 I

l l

i i 11 I

I I

I I

I I

IP1 tint ID No. LTRC14-2 II i

1 l

l l

1 I

llTemperaturel 283.0 1

300.0 l

H, X 1

J-1 1 Simultaneous l Mone 1

1

Icomponent:

Level ll

('F) l l

l i

l Test l

l l l Transmitter ll l

l l

l 1

1 I

i l ll l

l l

i I

I l

! lN:nsfccturer:

llPressure 1

52.0 1

74.7 l

C, X l

J-1 I Simultaneous l None l

I I

Bailey Neter l l( PSIA)

I l

l l

t Test I

I I

ll l

1 I

I 1

I l

5 INod21 Number: BY3840X-A ll l

l l

l l

l l

I llRelative i

100.0 l

100.0 l

A l

J-1 l Simultaneous l Mone l

llIFunction: Transmits LeveillHumidity l

l l

l l

Test l

l Signals II (t) 1 I

I I

I I

I j

ii 18 I

I I

I I

i 1

l lAccurccy: Spec:

1 5% il l Boric Acid i Boric Acid l

I l

I l

I Demon
1 23tilchemical i

1800 ppm l

1800 ppm l

A l

CAL-42 l

Analysis l

None l

j i iISpray I

pH 5.0 I

pH 5.0 l

i I

I I

IS2rvice
Reactor Coolant 1I l

l l

l l

I l

jl Pressurizer Levelll l

l l

l 1

l l

ll ll l

I l

I I

I l

jl Location: Containment flRadiation 11.7 x 107 RADS 14.0 x 107 RADS l CAL-44 l

AG ISequential Testl None 1

4l El. 3 Il I

1 4

I I

I I

! IFlood Level Elev: 572'-2*ll i

I I

I I

I l

l j llAbova Flood Level:

Yes ll Aging 1

40 Years i 10.83 Years 1 I

l CAL-38 l

Analysis i

None l

I ll l

l Mote 1 l

l l

l l

l

]lNiededfor:

ll l

l l

l l

I I

l

'l Hst Shutdown l xI 11 l

l 1

I l

l l

1 llSubmergencel 572' - 2" l

535' - O' I

B l

J-29 I

N/A l

None I

1 Cold shutdown IxI ll l

l l

l l

l 1

I ll l

1 I

I I

I l

l l

i

acility: Cov d Gase Unit 1 SYSTEN COMPONENT L. MATION WDRRSHEET Index No.: 2245-004A ocFat:

50-346 Rev.:

2 NOTES repared by: F 'l lim,wh Date _NOr ? "

hecked by:

T. I 6 2.6 Date

'cy-This component is scheduled for replacement during the first refueling outage subsequent to-component on-site availability.

Interim operation will not be affected due to the time margin provided.

One-year operating time is used as a conservative maximum specification.

i According to profiles G and N, co.ntainment conditions will nearly return to ambient (2.5 psig, 104*F) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, with a complete return to ambient within seven days. Ambient conditions will remain for the duration of the accident and ensuing cooldown. The 24-hour LOCA simulation test exposed the transmitter to a more severe environment than that which would recults from the postulated loss of coolant accident. Since the transmitter remained operable throughout the test, it can be c:ncluded that it will also maintain functional operability during the short-term accident environment and the long-tera cooldown at ambient conditions.

t 1

l 4

i 6

Y I

i l

i 1

a

,m

,m J

Pccility: D m u-BeCO2 Unit 1 SYSTEM COMPON VALUATION WORKSHEET Ind;x NS W 224H-004 Dock;t 50-346 Aev.:

2 PrJpara;d by:

3_d _

Date

)

Check 2d by:

gikfw M '

Dates f/Je/])

l ll l

l l

~l l EQUIPMENT DESCRIPTION ll ENVIRONMENT l

DOCUMENTATIO_N REF.

l Qualification l Outstanding l l

ll Parameter Specification Qualification

! Specification l Qualification l Method l

Items l

l ll l

l 1

l l

l l

lSyrtim Primary Pressure ll Operating l 1 Year l

1.1 Years l Notes 1 and 3l J-36 l Simultaneous l None l

l Control ll Time l

l l

l l

Test l

l l

ll l

l l

I lPlcnt ID No. LTRC14-2 ll l

l l

l u

l ll Temperature l 283.0 l

350.0

~l H,

X l

J-36 l Simultaneous l None l

l Component:

Level ll

(*F) l l

l l

l Test l

l l

Transmitter ll l

l l

l l

l l

l ll l

l 1

l l

l l

lManufteturer Rosemount ll Pressure l

52.0 l

85.0 l

G, X l

J-36 l Simultaneous l None l

l ll(PSIA) l l

l l

l Test l

l l

ll l

l l

l 1

l l Modal Number 1153 ll l

l l

l l

l l

l l Relative l

100.0 l

100.0 l

A l

J-36 l Simultane7us l None l

lPunction: Monitors ll Humidity l

l l

l l

Test l

l l Containment Water Level l l (t) l l

l l

l l

l l

ll l

l l

l l

l l

lAccuricy: Spec 5.0%

ll l Boric Acid l Boric Acid l

l J-36 l Simultaneous l l

l Demon:

.42%

ll Chemical l

1800 ppm l

1800 ppm l

A l

CAL-40 l

Test l

None l

l ll Spray l

pH 5.0 l pH 8.5 to 11 l l

Note 2 l

l l

lSarvices Reactor Coolant ll l

l l

l l

l l

l Pressurizer Level l l l

l l

l l

l l

ll l

l l

l l

l l

7 7 RADS l CAL-44 l

J-36 l Sequential Test l None l

l Loc tion: Containment l l Radiation l1.7 x 10 RADS l5.0 x 10 l

El. 3' ll l

l l

l l

l l

l Flood Level Elev: 572'-2"ll l

l l

l l

l l

l Above Flood Ievel: Yes ll Aging l

40 Years l

10 Years l

I l

CAL-66 l Sequential l

None l

l ll l

l Note 4 l

l J-36 l

Test l

l lNeedsd fort ll l

l l

l l

l l

l Hot Shutdown lX l ll l

l l

l l

l l

l llSubmergencel 572' - 2" l

585' - 0" l

B l

J-29 l

N/A l

None l

l Cold shutdown lX l ll l

l l

l l

l l

l ll l

l l

l l

l l

[

g

'N,

\\

)

)

F:cility: D$ vat [-Osc23 Unit 1 SYSTDt COMPONENT ATION WORKSHEET Index N

.-524H-004A Dockst:

50-346 Rev.:

2 2

8.[

'^

PrIparsd by:

Date Chickzd by:

., yra Date Y/Jo/f>

1.

The Rosemount replaces the Bailey Meter in accordance with FCR 78-525.

2.

CAL-40 qualifies components tested in a high pH Boric Acid spray to a pH value of 5.0.

3 Ona year operating time is used as a conservative maximum specification.

4.

Materials and/or conponents sensitive to thennal aging will be replaced as per maintenance and replacement schedules to ecsure that associated component will maintain functional operability in harsh environments.

m

racility: D5du-Be;oo Unit 1 SYSTEM COtPCNE.MALUATION CORKSHEET Index h /,2_24H-005 2

, Dock;t 50-346 Re v. :

2 Prepared by:

k Dates ll I

,}

Check 1d by:

yd&M Dates is /2/f) l 11 l

l l

l l l EQUIPMENT DESCRIPTION ll ENVIRONMENT l

DOCUMENTATION REF.

l Qualf fication l Outstanding l

,l ll Parameter l Specification l Qualification lf@ecificationl Qualification l Method l

Items l

l ll 1

l 1

l l

l l

4lSycten: Primary Pressure l l Operating l 1 Year l

1.1 Years l

F l

M-26 l Simultaneous l None l

l Control System ll Time l

-l l

l V-24G l

Test l

l

'l ll l

l l

l Note 1 l

l l

[

l Plant.ID No, MV02000 ll l

l l

l l

l l

l l l Temperature l 283.0 l

300.0 l

H, X

l M-26 l Simultaneous l None l

l Component : Valve Motor ll

(*F) l l

2 l

l V-24G l

Test l

l l

Operator ll l

l l

l l

l l

ll l

1 l

1 l

I l

lMInof teturer Limitorque l l Pressure l

52.0 l

84.7 l

G, X

l M-26 l Simultaneous l None l

l ll(PSIA) l l

l l

V-24G l

Test l

l

. l Modal Number:

ll l

._l l

l l

l l

l l

lO/N 375060D ll l

l l

l l

l ll Relative l

100.0 l

100.0 l

A l

M-26 l Simultaneotw l None l

l Function: Operates PRZR l lHt:rldity l

l l

l V-24G l

. Test l

l l Sampla Isolation Valve ll M) l l

l l

l l

l l Containment Vent Header ll l

l l

l l

l l

lAccurtcy: Spect N/A ll l Boric Acid l

Boric Acid l

l M-26 l

l l

l Demon: N/A ll Chemical l

1800 ppm l

1800 ppm l

A l

V-24G l Simultaneous l None l

l l l Spray l

pH 5.0 l

pH 5.0 l

l CAL-40 l

Test, l

l l Service: PRZR Sample ll l

l l

l Note 2 l

Analysis l

l l Icoletion Valve Contain-ll l

l l

l l

l t

l l ment Vent Header ll l

l l

l 1

l 8

8 l Location: Containment ll Radiation l1.7 x 10 RADS l2.0 x 10 RADS l CAL-44 l

M-26 l Sequential Test l None l

l ll l

l l

v-24G l

l l

! l Flood Level Elev: 572'-2"ll l

l l

l l

l l

l lAbova Flood Level Yes ll Aging l

40 Years l

40 Years l

I l

CAL-93 l Sequential Test l None l

l ll l

l l

l l

Analysis l

l lNasdsd fort ll l

l l

l l

l l

j l Hot Shutdown lX l ll l

l l

I l

l l

' l l l Subme rgence l 572'-2" l

588'-6" l

B l

M-10 l

N/A l

None l

l Cold Shutdown IX l ll l

l l

l l

l l

l ll l

l l

1 l

l l

s i

J F;cility: Davad-Derza Unit 1 SYSTDI COMPCC'DrF EVALULM WORKSHEET Index No.: b, H-005A Dockst:

50-146 Rev.:

g, i Prepa rsd by N

Date Nl 83 Checksd bya gph /

Date ll J Z./ ff 1.

%a test subjected the valve motor operator to a transient of 300*F and 84.7 psia for 32 minutes, followed by a couldown tc l

120'F in 3.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. %e valve motor operator was then subjected to a second transient of 300*F and 44.7 psia, which was maintained for 92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />, then a cooldown to 200*F and 24.7 psia, which was maintained for 24 days. %e temperature and prursure inside containment peak at 283*F and 52.0 psia in 17 and 50 seconds, respectively. At I hour the conditions are 214.7'F and 32.2 psia at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the conditions are 204*F and 29.46 psia s at 5 buurs the conditions are 193.2*F and 27.08 palas and at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the conditions are 143*F and 18.03 psia. We conditions return to ambient in 7 days.

Based on this information, it can be concluded that the laboratory test subjected the valve motor operator to an overall more severe environment than that which would result f rom a postulated LOCA. Since the valve motor operator remained operable throughout the test and functional af ter the test, it can be concluded that the valve motor operator will remain f unctional during and af ter exposure to the accident environment which would result f rom the postulated LOCA.

(Reference C, H, and X).

2.

CAL-40 qualifles components tested in a high pH boric acid spray to a pH veine of 5.

I i

1 1

1

.I i

l

7"

(

)

/224H-006 Facility: D)+a -Be w3 Unit 1 SYSTEM CWPCNE VALUATIW WORKSHEET Index Re v.

2 Dock;t 50-346

(( # !M3 Prepcred by:

Date:

Check 2d by:

M&J2J Date

,, /d/3 I

ll l

l l

l l EQUIPMENT DESCRIPTION ll ENVIRONMENT l

DOCUMENTATION REF.

l Qualification l Datstanding l l

l l Parameter l Specification l Qualification l Specification Qualification Method l

Items l

l ll l

l l

)

i l

l lSyctca: Primary Pressure ll Operating l 1 Year l

1.1 Years l

F l

M-26 l Simultaneous l None l

Control System ll Time l

l l

lV-24E, V-24G l Test l

l l

ll l

l l

Note 1 l

l l

lPltnt ID No.

MV0239A ll l

l l

l l

l l

l lTeaperature l 283.0 l

300.0 l

H, X

l M-26 l Simultaneous l Hone l

l Component : Valve Motor ll

('F) l l

l lV-24E, V-24G l Test l

l l

qperator ll l

l l

l l

l l

l ll l

l l

l l

l l

lMinuf ccturers Limitorque l l Pres sure 1

52.0 l

84.7 l

G, X

l M-26 l Simultaneous l None l

l ll(PSIA) l l

l lV-24E, V-24G l Test l

l l Modal Number:

ll l

l l

l l

l l

lO/N: 375060D ll l

l l

l l

l l

lS/N:

195652 l l Relative l

100.0 l

100.J l

A l

M-26 l Simultaneous l Hone l

l Function: Qperates PRZR l l Humidity l

l l

lV-24E, V-24G l Test l

l l

Vgpor Sample ll (t )

l l

l l

j l

l Isolation Valve ll l

l l

l l

l Accurccy : F,pec t N/A ll l Boric Acid l

Boric Acid l

l M-26 l

l l

l Demon N/A ll Chemical l

1800 ppm l

1800 ppm l

A lV-24E, V-24G l Simultaneous l None l

l l l Sp ray l

pH 5.0 l

pH 5.0 l

l CAL-40 l

Test, I

l l Services PRZR Vgpor ll l

l l

l Note 2 l

Analysis l

l l

Sample ll l

l l

l l

l l

l Isolation Valve ll l

l l

l l

l l

lLocction Containment ll Radiation l1.7 x 10 RADS l2.0 x 10 RADS l CAL-44 l

M-26 lSequentiel Test l None l

7 8

V-24E, V-24G l l

l l

ll l

l l

l IFlood Level Elev: 572'-2"ll l Abova Flood Level Yes l l Aging l

40 Years l

40 Years l

I l

CAL-93 l Sequential Testl None l

l ll l

l l

l l

Analysis l

l lNscdad fors ll l

l l

l l

l l

l Hot Shutdown lX l ll l

l l

l l

l l

l ll Subme rge ncel 572'-2" l

589'-0" l

B l

M-10 l

N/A l

None l

l Cold Shutdown lX l ll l

l l

l l

l l

l ll l

l l

l 1

l l

N s

i

.cility: Davis-Dests Unit 1 ekst 50-346 SYSTDI COMPONENT EVALUATION WORKSHEET cps rad by &

N Index No.: _224H-006A lI f!E3 NOTES Re v. :

Date ccksd by:; A f g,] / Date er /' t/pf 2

%e test subjected the valve motor operator to a tra 120'F in 3 2 hoints.

maintained for 92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />, then a cooldown to 200*F and 24 7%e valve motor operator was then psia, which was maintained for 24 days.second transient of 30 y a cooldown to prassure inside containment peak at 283*F and 52.0 psia i 214.7*P and 32.2 psia s at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the conditions n 17 and 50 seconds, respectively.

%e temperature and patas and at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the conditions are 143*F and 18 03are 204*r and 29.46 psias at 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> the co psia.

Baasd on this information, it can be concluded th t We conditioner. return to ambient in 7 days.

P and 27.08 more severe environment than that which would result fthe laboratory test subjected the valve motor operat a

f unctional during and af ter exposure to the accidopsrable throughout the test and functiona rom a postulated IDCA.

or to an overall it can be concluded that the valve motor operator willSin

est, H, and X).

ent environment which would result from the postulated LOCA remain CAL-40 quallfles components tested in a high pH b (Reference G,

\\

oric acid spray to a pH value of S.

)

1 I

p

,/

Facility dr-Be:se Unit 1 SYSTEM CfMPCN EVALUATICH CORKSHEET Incex km / 22 ~-007 Re v. :

2 3ock;ts 50-346 Prepered by:

Dates

/

2 heck 2d by:

g A,. M d Date

<f/>//7 I

il i

l l

l l EQUIPMENT DESCRIPTION ll ENVIRONMENT DOCUMENTATION REF.

l Qualification l Outstanding l l

ll Parameter Specification l Qualif ication

@ecif ication Qualification Method l

Items l

l ll l

l 1

l l

lSyttem: Primary Pressure ll Operating l 1 Year l

1.1 Years l

F l

M-26 l Simultaneous l None l

l Control System ll Time l

l l

lV-24E, V-24G l Test l

l l

ll l

l l

l Note 1 l

l l

lPlcnt ID No, MV0239B ll l

l l

l l

l l

l l lTenperature l 283.0 l

300.0 l

H, X

l M-26 l Simultaneous l None l

l Comprnent : Valve Motor ll

(*F) l l

l lV-24E, V-24G l Test l

l l

Operator ll l

l l

l l

l l

i l

ll l

l l

l l

l l l lManuf acturer Limitorque ll Pressure l

52.0 l

84.7 l

G, X

l M-26 l Simultaneous l None l

l l l ll(PSIA) l l

l lV-24E, V-24G l Test l

l i

l l Modal Number:

ll l

l l

l l

l l

lO/N: 37506CD ll l

l l

l l

l l j lS/N: 195653 ll Relative l

100.0 l

100.0 l

A l

M-26 l Simultaneous l Hone l

lFJnction: Operates PRZR ll Humidity l

l l

lV-24E, V-24G l Test l

l Liquid Sanple ll 8

l l

l l

l l

l Isolation Valve ll_ %)

l l

l l

l l

l l

l l Accurccy : Speca N/A ll l Boric Acid l

Boric Acid l

l M-26 l

l l

l Demon N/A l l Chemical l

1800 ppm l

1800 ppm l

A lV-24E, V-24G l Simultaneous l None l

l l l Sp ray l

pH 5.0 l

pH 5.0 l

l CAL-40 l

Test, l

l l Service: PRZR Liquid ll l

l l

l Note 2 l

Analysis l

l l

Sanple ll l

l l

l l

l l

l Isolation Valve ll l

l l

l l

l I

lLocntion: Containment ll Radiation l1.7 x 10 RADS l2.0 x 10 RADS l CAL-44 l

M-26 l Sequential Testl None l

8 l

ll l

l l

lV-24E, V-24G l l

l l Flood Level Elev: 572'-2"ll l

l l

l l

l l

l Above Flood Level Yes ll Aging l

40 Years l

40 Years l

I l

CAL-93 l Sequential Test l None l

l ll l

l l

l l

Analysis l

l lNscdsd fors ll l

{

l l

l l

l l Ilot Shutdown lX l ll l

l l

l l

l l

l l l Subme rgencel 572'-2" l

586'-0" l

B l

M-10 l

N/A l

None l

l Cold Shutdown lX l ll l

l l

l l

l l

l ll l

l l

l i

I i

l V

s cility: Davis-Bes:se Unit 1 SYS* REM COMPONENT EVALUA'fl0N WOl& SHEET Index Ho.: 224H-407A

.ckst:

50-346 Rev.:

g

[

epared by Date Nf,I c,4pCf/ D Q Date N [ 2 {$3 ccked by:

3 e

y iha test subjected the valve motor operator to a transient of 300*F and 84.7 psia for 32 minutes, followed by a cooldown to 120*F in 3.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. 1he valve motor operator was then subjected to a second transient of 300*F and 44.7 psia, which was maintained for 92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />, then a cooldown to 200*F and 24.7 psia, which was maintained for 24 days. % e temperature and pressi:re inside containment peak at 283*F and 52.0 psia in 17 and 50 seconds, respectively. At I hour the conditions are 214.7*F and 32.2 psia; at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the conditions are 204*F and 29 46 psias at 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> the conditions are 193.2*F and 27.08 psia; and at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the conditions are 143*F and 18 03 psia. We conditions return to ambient in 7 days.

Based on this information, it can be concluded that the laboratory test subjected the valve motor operator to an overall more severe environment than that which would result from a postulated IDCA.

Since the valve motor operator remained operable throughout the test and functional after the test, it can be concluded that the valve motor opeactor will remain f unctional during and af ter exposure to the accident environment which would result from the postulated 10CA.

(Reference G, I

II, and X).

CAL-40 qualifies components tested in a high pH boric acid spray to a pH value of 5 l

1 1

1 i

1 I

('

1

\\

/

SYSTEM CCMPCN ALUATICN CORKSHEET Index k g 224H-007

'aciilty :

D;,._.J-Bero Unit 1 Re v. :

2 Jocket:

50-346

/!9]

N Dates Prepared by :

heek;d by :

AptW h /

Date: er/.Vg3 l

ll l

l l

1 EQUIPMENT DESCRIPTION ll ENVIRONMENT DOCUMENTATION REF.

l Qualification l Outstanding l l l Parameter l Specif ication l Qualification - Ebecif icationi Qualif icationi Method l

Items l

1 II l

l l

l l

1 l

iSyctem: Primary Pressure l l Operating l 1 Year l

1.1 Years l

F l

M-26 l Simultaneous l None l

l Control System ll Time l

l l

l V-24E l

Test l

l l

ll l

l l

l Note 1 l

l l

lPlcnt ID No.

MV27350 ll l

l l

l l

l l

l l lTerrperature l 283.0 l

300.0 l

H, X

l M-26 l Simultaneous l None l

lConponent: Valve Motor ll

(*F )

l l

l l

V-24E l

Test l

l l

Operator ll l

l l

l l

l l

l ll l

l l

l l

l l

lManuf acturer Limitorque ll Pressure l

52.0 l

84.7 l

G, X

l M-26 l Simultaneous l None l

l ll(PSIA) l l

l l

V-24E l

Test l

l l Modal Number SMB-000-2 ll l

l l

l l

l l O/N 375060B ll l

l l

l l

l l

ll Relative l

100.0 l

100.0 l

A l

M-26 l Simultaneous l None l

l Function: Cberates PRZR ll Humidity l

l l

l V-24E l

Test l

l l

Spray Line ll

(%)

l l

l l

l l

l l

Isolation Valve ll l

l l

l l

l l

lAccurrey: Spect N/A ll l Boric Acid l

Boric Acid l

l M-26 l

l l

l Demon N/A ll Chemical l

1800 ppm l

1800 ppm l

A l

V-24E l Simultaneous l None l

l l l Sp ray l

pH 5.0 l

pH 5.0 l

l CAL-40 l

Test, I

l lServic3:

Pressurize r ll l

l l

l Note 2 l

Analysis l

l l

Sp ray Line ll l

l l

l l

l Isolation Valve ll l

l I

I i

l lLocction: Containment ll Radiation l1.7 x 10 RADS l2.0 x 10 RADS l CAL-44 l

M-26 l Sequential Test l Hone l

7 8

l ll l

l l

l V-24E l

l l

l Flood Level Elev: 572'-2"ll l

l l

l l

l l

l Above Flood Level Yes ll Aging l

40 Years l

40 Years l

I l

CAL-93 l Sequential Test]

None l

l ll l

l l

l l

Analysis l

l lNndsd fors ll l

l l

l l

l l Hot Shutdown lX l ll l

l

(

l l

l l

l l l Subme rgencel 572'-2" l

605' l

B l

M-6 l

N/A l

Hone l

l Cold Shutdown lxl ll l

l l

l l

l l

l ll l

l l

l l

l l

4 ceility: Devio-Berse lAsit 1 SYSTEM COMPONENT EVALUATION WORKSMEET

ockst

50-346 ladox No.: 224N-008A 4

nov.:

2.

riparad by Nkm..h NOTES II f!fI Date

' hecksd bys W

.Date _

igi/R3

. We test subjected the valve motor operator to a transient of 300*F and 84.7 psia for 32 minutes, followed by a cooldown to r

120*F in 3.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

We valve smotor operator was then subjected to a second transient of 300*F and 44.7 psia, which was r

I maintained for 92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />, then a cooldown to 200*F and 24.7 psia, which was maintained for 24 days.

The temperature and pressure inside contalrunent peak a't 283*F and 52 0 psia in 17 and 50 seconds, a

respectively. At I hour the conditions are i

214.7'r and 32.2 psia s at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the conditions are 204*F and 29.46 psia s at 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> the conditions are 193.2*F and 27.08 l

l psics and at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the conditions are 143*F and 18.03 psia. The conditions return to ambient in 7 days.

I Bassd on this information, it can 1:e concluded that the laboratory test subjected the valve P:otor operator to an overall

^

more severe envirorunent ther; that which would result from a postulated IACA. Since the valve motor operator remained j

opsrable throughout the test and functional af ter the test, it can be concluded that the valve motor operator will remain

)

i f unctional during and af ter exposure to the accident envirorunent which would result fra the postulated IACA.

l H, and X).

(Reference C, i

l CAL-40 qua11fles components tested in a high pH boric acid spray to a pH value of 5.

l i

i

)

1 7

1 J

I L

i I

i i

4 4

l

racility: D h.w-Bessa Unit 1 SYSTEM CmPCHENT bdUATIN CORKSHEET Index 6 4: 224H-009 Jockst 50-346 Re v. :

2 N

I!D

?repared by:

Date:

Checkad by:.&&h Dates g /,r//3

l ll 1

l l

l l EQUIPMENT DESCRIPTION ll ENVIRNMENT

{

DOCUMENTATION REF.

l Qualification l Outstanding l l

ll Parameter Specification l Qualification l Specification Qualification l Method l

Items l

l ll i

l l

l l

1 l

l System: Primary Pressure l l Operating l 1 Year l

1.1 Years l

F l

M-26 l Simultaneous l None l

l Control System ll Time l

{

l l

V-24G l

Test l

l l

ll l

l l

l Note 1 l

l l

l Plant ID No. MV27360 ll l

l l

l l

l l

l l l Temperature l 221.0 l

300.0 l

C-314 l

M-26 l Simultaneous l None l

l Component : Valve Motor ll

(*F) l l

l l

V-24G l

Test l

l

,l Operator ll l

l l

l l

l l

l Manuf teturer Limitorque ll l

l l

l l

l l

j l l l Pressure l

19.76 l

84.7 l

C-314 l

M-26 l Simultaneous l None l

l lModel Numbers ll(PSIA) l l

l l

V-24G l

Test l

l lO/N: 373845A ll l

l l

l l

l l

l3/Ns 186674 ll l

l l

l l

l l

l Function: Operates PRZR ll Relative l

100.0 l

100.0 l

A l

M-26 l Simultaneous l None l

l Sp ray Line ll Humidity l

l l

-l V-24G l

Test l

l

'l Isolation Valve ll (t )

l l

l l

l l

l ll ll l

l l

l l

1 l

l Accurscy : Spec:

N/A ll l

l l

l l

l l

l Demon N/A ll Chemical l

N/A l

N/A l

N/A l

N/A l

N/A l

None l

lSarvice
Pressurize r l l Sp ray l

l l

l l

l l

l Sp ray Line ll l

l l

l l

l l

l Isolation Valve ll l

l l

l l

l l

l Location: Auxiliary Bldg. l l l

l l

l I

I l

6 8

l Rm. 314 ll Radiation l1.0 x 10 RADS l2.0 x 10 RADS l T

l M-26 l Sequential Test l None l

l ll l

v-24G l

l l

l Flood Level Elev:

N/A ll l

l l

l l

4 l Above Flood Level: N/A ll Aging l

40 Years l

40 Years ll I

l CAL-93 l Sequential Test l None l

l ll l

l l

l l

Analysis l

l 2

, lNasdad for ll l

l l

l

}

l l

Hot Shutdown lX l ll l

l l

l l

l l

ll l l Subme rgencel N/A l

N/A l

N/A l

N/A l

N/A l

None l

l Cold Shutdown lX l ll l

l l

l l

l l

i l ll l

l l

l l

l l

\\

O, C

y

  • acility: Davis-Besse Unit 1 kekst :

50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Yepared by: _N M

j Index No.: 224H-009A NOTES Dater ll /

l Rev. :

hecksd by: '

/

,Q &

Daten

_ SI/ t/juy }

2,

~

s The test 120'F in 3 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. subjected the valve motor operator to a transient of 300*F maintained for 92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />, then a cooldown to 200*FThe valve motor operator was then subjected t and 84 7 psia 314 peaks at and 24 7 psia, which was maintained for 24 dayso a second transient 221*F in 1 55 seconds.

wn to 314 return to ambient after 8 minutes.

The pressure in Roosi 314 peaks at 19 76 psia i

, which was The temperature in Rocat n.086 seconds.

Cased on this inforisation, The conditions in Room more severe environment than that which wouldit can he corcluded that the laboratory te t opar'able throughout the test and functional af tresult fran a postulated HELB. subjected the valve motor operator to an " verall s

functional dairlog and af ter exposure to the ac id it can be concluded that the valve motor opSince the valve m er the test, o

C-314) c ent envirorsnent which would result from the postulat d H erator will remain e

EIA.

(Refererce

  • aci.l ity : Dnio-Be2so Unit 1 SYSTEM CCMPCNMEVALUATICH WORKSHEET Index kurs 224H-010 sockst:

50-346 Re v. :

2

'repered by :

Dater N/

)

heckad by:

Mn4d Dates af.V/9 ll l

l l

l EQUIPMENT DESCRIPTION ll ENVIRONMENT l

DOCUMENTATION PEF.

l Qualification l Outstanding l ll Parameter Specification l Qualification I Qpecification ! Qualification Method Items l

"~

ll l

l l

l i

l Systems Primary Pressure l l Operating l 1 Year l

1.1 Years l

F l

M-24 l Simultaneous l None l

J Control System ll Time l

l l

l V-24A l

Test l

l ll l

l l

l Note 1 l

l Plant ID No.

MVRCO20 ll l

l l

l l

l l lTemperatu re l 283.0 l

329.0 l

H, X

l N-24 l Simultaneous l None l

Component: Valve Motor ll

(*F) l l

l l

V-24A l

Test l

l Operator ll l

l l

l l

l l

ll l

l l

l l

l l

Manuf acture r Limitorque l l Pressure l

52.0 l

104.7 l

G, X

l M-24 l Simultaneous l None l

ll(PSIA) l l

l l

V-24A l

Test l

l Modal Number SMB-00 ll l

l l

l l

l l

i O/N: 350190A ll l

l l

l l

l l

IS/N

150027 l l Relative l

100.0 l

100.0 l

A l

M-24 l Simultaneous l None l

!l Function: Qpe rates Valve l l Humidity l

l l

l V-24A l

Test-l l

! i RC020 ll (t) l l

l l

l l

l ll l

l l

l l

l l

l. Accu racy : Spect N/A ll l

Boric Acid l

Boric Acid l

l M-24 l

l l

Demon: N/A ll Chemical l

1800 ppm l

1800 ppm l

A l

V-24A l Simultaneous l None l

l l Spray l

pH 5.0 l

pH 5.0 l

l CAL-40 l

Test, l

l Sarvica Pressurizer 1 ll l

l l

l Nete 2 l

Analysis l

l l

Sp ray Valve ll l

l l

l l

l 1

ll l

1 l

l i

l l

7 8

l Location: Containment ll Radiation l1.7 x 10 RADS l2.0 x 10 RADS l CAL-44 l

M-25 l Sequential Test l None l

l Rm. 5B0 ll l

l l

V-24A 1

l l

lFlood Level Elev: 572'-2"ll l

l l

l l

l

' l Abova Flood Level Yes ll Aging l

40 Years l

40 Years l

I l

CAL-93 l Sequential Testl None l

l ll l

l l

l l

Analysis l

l

JNasdtd fors ll l

l l

-l l

'l Hot Shutdown lX l ll l

1 l

l l

l

.I l l Subme rgence l 572'-2" l

624' l

B l

M-5 l

N/A l

None l

l Cold Shutdown lX l ll l

l l

l l

l l

iI ll l

l l

l l

l l

1 1

1

~

O O

)

cility: Davru-a'assa Unit 1 EY; TEM COMPONENT EVM*r1ON WORKSHEET Index No. : 224}010A

~

ckat:

50-346 Rev.:

2,

/

NOTES tri.< 5 epared by: _ N Lo.. u.

o.te

, ecked by: W4G/M Date __ ll 7 2./8J

?

%s test subjected the valve motor operator to I hour at 329'F and 104 7 psia, then 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 312*F and 84.7 psia, then 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 287*F and 54.7 psia, then 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> at 256*F and 34 7 psia, and 250*F and 29.7 psia for 6 days. % e temperature and l

prsacure inside containment peak at 283*F and 52.0 psia in 17 and 50 seconds, respectively. At I hour the conditions are 214.7'F and 32 32 psias at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the conditions are 204*F and 29.46 palas at 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> the conditions are 193 2*F and 27.08 2

pilas and at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the conditions are 143*F and 18.03 paia. %e containment returns to ambient conditions in 7 days.

I Based on this information, it can be concluded that the laboratory test subjected the valve motor operator to an overall j

more severe environment than that which would result from a postulated LOCA.

Since the valve motor operator remained i

operable throughout the test and functional af ter the test, it can be concluded that the valve motor operator will remain functional during and af ter exposure to the accident environment which would result from the postulated LOCA.

(Reference G, H, and X).

This ha Ae / coil is scheduled for replacement in accordance with FCR 83-067.

d CAL-40 qualifies components tested in a high pH boric acid spray to a pH value of 5.

f a

f 5

1 t

1 J

c T

l l

O O

ftcility: D dio-B2c32 Unit 1 SYSTEM CMPCNENT EVALUATIm WORKSHEET Mckst :

50-346 Index ho.: 224H-Oll Re v. :

2

?repared by:

Dater

/

2 heck 2d by: gpgl;ch Dates ///J//2 l

ll l

l l

l l EQUIPMENT DESCRIPTION ll ENVIRONMENT l

ll Parameter i Specification Qualification Ibecification Qualification' Method Items l

DOCUMENTATION REF.

l Qualification l Outstanding l l

11 l

l l

l Syste:2 Primary Pressure l l Ope rating l 1 Year l

1.1 Years l

F l

M-24 l Simultaneous l

Mone l

l l

Control System ll Time l

l l

l V-24A l

Test l

l l

11 l

l l

l Nee l l

l l

l Plant ID No.

MVRC100 ll l

l l

l l

l l

l l Temperature l 283.0 l

329.6

{

H, X

l M-24 l Simultaneous l None l

l Component : Valve Motor ll

(*F) l l

l l

V-24A l

Test l

l l

Operator ll l

l l

l l

l l

l ll I

l l

l l

l l

lManuf acture r Limitorque ll Pressure l

52.0 l

104.7 l

G, X

l M-24 i Simultaneous l None l

l ll(PSIA) l l

l l

V-24A l

Test l

l l Modal Number: SP?-00 ll l

l l

l l

l l

l O/N 360191A ll l

l l

l l

l l

,lS/N: 150305 ll Relative l

100.0 l

100.0 l

A l

M-24 l Simultaneous l None l

'l Function: Operates Valve ll Humidity l

l l

l V-24A l

Test l

l l

RC100 ll (t) l l

l l

l l

l l

ll l

l l

l l

l l

l Accuracy: Spect N/A ll l Boric Acid l

Boric Acid l

l M-24 l

l l

l Demon N/A ll Chemical l

1800 ppm l

1800 ppm l

A l

V-24A l Simultaneous l None l

l l lSp ray l

pH 5.0 l

pH 5.0 l

l CAL-40 l

Test, l

l l Servica: Pressurizer 1 ll l

l l

l Note 2 l

Analysis l

l t

l Spray Valve ll l

l l

l I

l l

l ll l

1 l

l 1

1 l

l Location: Containment ll Radiation l1.7 x 108 RADS l2.0 x 108 RADS l CAL-44 l

M-25 l Sequential Test l None l

l Rm. $80 ll l Flood Level Elev: 572 '-2 "l l V-24A l

l l

l Abova Flood Level: Yes ll Aging l

40 Years l

40 Years l

I l

CAL-93 l Sequential Test l None l

l l

l ll l

l l

l l

Analysis l

l QNasdsd fors ll l

l l

l l

l

} Hot Shutdown lX l ll l

l l

l l

l l l Subme rgencel 572'-2" l

624' l

B l

M-5 l

N/A l

None l

Cold Shutdown lX l ll l

l l

l 1

l l

ll 1

l l

j l

l l

t

- - _ - - - - - - - - - - - - ~ _ _ _ - _ _ -.. - - - - - - - - - - - - -

- ~ ^

u Facility: Davis-Besse Unit 1 Dockst Sn-w SYSTDI CONPONENT EVALUATION WOletSHEET Index No. : _224H-011A Prepared by:

N

,Date I i!MI NOTES nev.*

2 Checked byt

&n(4

{Date _ ((/ t /p3 1.

hours at 287'r and 54.7 psia, then 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> at 256'F a d 34 7h test subjected the valve psia, and 250'F and 29 7 psia for 6 days.and 104.7 psia pressure inside contairunent peak at 283*F and 52.0 pela in 17 n

then 2 214.7'F and 32 32 palat 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the conditions are 143*r and 18 03 psiaat 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the conditions are 204*F and 29.46 The temperature and psias and at At I hour the conditions are l

The contairunent returns to ambient conditions in 7 Based on this information, more severe envirorunent than that which would result franit can be concluded that the Imboratory test subject d th ys.

e e valve motor ~.perator to an overall functional during and af ter exposure to the accident eoperable throughout the test and function a postulated LOCA.

Since the valve r s, it can be concluded that the va?.<4

.or operator remained H, and X) nvirorunent which would result from th - -otor operator will remain i

atulated LOCA.

(Ref erence G, 2.

CAL-40 qualifies components tested in a high pH boric acid spray to a pH value of 5.

l

  • acility : Di tc-Besse Unit 1 rockst 50-346 SYSTEM C WPCNENT EVALUATIM WORKSHEET Index hu.: 224H-012 Re v. :

2

'repared by kf ^*a Date: _N A7

hecksd by:

>4f:2d6.#

Dates ///.4/,#3__

Il i

EQUIPMENT DESCRIPTION ll ENVIRWDENT l

DOCUMENTATION kEF.

l Qualification l Outstanding l I

I l

ll Parameter l Specification l Qualification

% ecificationl Qualification' Method Items I

ll l

t l

l l

Syctem Primary Pressure lloperating l 1 Year l

1.1 Years l

F l

M-24 l Simultaneous l None l

l Control System ll Time l

l i

l V-24A l

Test l

l ll l

l 1

l wate 1 I

l l

Plant ID No.

MVRC110 ll l

l l

l l l Temperature l 283.0 l

329.0 l

H, X

l M-24 l Simultaneous l None l

l l

Componants Valve Motor ll

(*F) l l

l l

V-24A l

Test l

l Operator ll l

l l

l il I

i l

l l

l l

l MInufacturer Limitorque ll Pressure l

52.0 l

104.7 I

G, X

l M-24 l Simultaneous l None l

l ll(PSIA) l l

l l

V-24A l

Test l

l Modal Number SMB-00 ll l

l l

l l

l l

O/N 360191B ll l

l l

l l

l l

S/N: 152633 ll Relative l

100.0 l

100.0 l

A l

M-24 l Simultaneous l None l

l Function: Operates Valve l l Humidity l

l l

l V-24A l

Test l

l FC110 ll (t) l l

l I

}

l l

ll l

l l

1 I

l l

Accurccy : Spect N/A ll l Boric Acid l

Boric Acid l

l M-24 l

l l

Demon N/A ll Chemical l

1800 ppm I

1800 ppm l

A l

V-24A l Simultaneous l None l

I ISpray l

pH 5.0 l

pH 5.0 l

l CAL-40 l

Test, l

l Sarvics: Pressurizer 1 ll l

l l

l Note 2 l

Analysis l

l Spray Valve ll l

l l

1 l

l l

ll l

1 l

l l

Locations Containment ll Radiation l1.7 x 10 RhDS l2.0 x 108 I

l RADS l CAL-44 l

M-25 l Sequential Test l None l

Rm. 580 ll l

Flood Level Elev: 572 '-2 "l l l

V-24A I

l l

&bova Flood Level Yes ll Aging l

40 Years l

40 Years l

I l

CAL-93 l Sequential Test l None l

l l

l l

ll l

l l

l l

Analysis l

l hodsdfor ll l

l l

l l

l Hot Shutdown lX l ll l

l 1

l l

l l l Subme rgence l 572'-2" l

624' l

B l

M-5 l

N/A l

None l

Cold Shutdown IX l ll l

l l

l l

l l

ll l

l I

l 1

I l

l

j%

b(m

\\

(

Facility: Davis-Besse Unit 1 SYSTEM COMPONENT EVALUATION WORKSHEET Irdex No. : 224H-012A Dockst:

50-346 Rev.:

7.

(![]

Prepared by:

N Date f(

Checked ly:

/ Date

,e / 2,/# 7 1.

The test subjected the valve motor operator to I hour at 329'F and 104.7 psia, then 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 312*F ard 84.7 psia, then 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 287'F and 54.7 psia, then 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> at 256*F and 34.7 psia, and' 250*F and 29.7 psia for 6 days. The temperature ard pressure inside contairment peak at 283*F ard 52.0 psia in 17 ard 50 secords, re gectively. At I hour the corditions are 214.7'F and 32.32 psias at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the corditions are 204'F ard 29.46 psias at 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> the corditions are 193.2*F ard 27.08 l

pola r ard at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the corditions are 143*F arvt 18.03 pala. %e contairment returns to ambient corditions in 7 days.

l i

Based on this information, it can be concluded that the laboratory test subjected the valve motor operator to an overall more severe envirorment than that which would result f rca a postulated LOCA.

Sirce the valve motor operator remained operable throughout the test and functional af ter the test, it can be concluded that the valve motor operator will remain f unctional during ard af ter exposure to the accident envirorment which would result f rom the postulated LOCA.

(Ref erence G, H, ard X) 2.

CAL-40 qualifies components tested in a high pH boric acid spray to a pH value of 5.

'l 1

I i

1 l

t i

i i

I e

Facility s *4ssa Unit 1 SYSTEM COMPObENT Q ATION WORKSHEET Ind;x Q 224H-014 Docksts 50-346 Re v. :

2 Preparsd by:

NIC Dates N/

Checksd by:

,4!C % A 1

Date s//W,P) l ll l

l l

l l EQUIPMENT DESCRIPTION ll ENVIRONMENT l

DOCUMENTATION REF.

l Qualification l Outstanding l' i l ll Parameter l Specification i Qualification Specification Qualification' Nethod l

Items l

l ll l

1 l

l l

l lSystsm: Primary Pressure ll Operating l 1 Year l

1.1 Years l

O l

J-24 l Simultaneous l None l

l Control ll Time l

l l

l Note 4 l

Test l

l 4

l ll l

l l

l l

l 4

l Plant ID No. ZSDH13A ll l

l l

l l

l l

ll Temperature l 283.0 l

354.0 l

H, X l

J-9 l Simultaneous l Mone l

i l Component: Limit Switch ll

(*F) l l

l l

l Test l

l l

ll l

l l

l l

l l

l ll l

l l

l l

l l

l Manufacturer NAMCO ll Pressure l

52.0 l

134.7 l

G, X

l J-9 l Simultaneous l None l

l ll(PSIA) l l

l l

l Test l

l l Modal Number EA740-50100ll l

l l

l l

l

! l ll l

l 1

1 I

I I

, l Function: Valve Position ll Relative l

100.0 l

100.0 l

A l

J-9 l Simultaneous l None l

i l Indication ll Humidity l

l l

l l

Test l

l i l ll (s) l l

l l

l l

! lAccurccy: Spec:

N/A ll l

l l

l l

l l

1 l Demon N/A ll l Boric Acid l Boric Acid l

l l

l l

l ll Chemical l

1800 ppm l

1800 ppm l

A l

J-9 l Simultaneous l None l

lSarvice: Normal Decay ll Spray l

pH 5.0 l

pH 5.0 l

l CAL-40 l

Test, l

l

{ l Haat Suction Isolation ll l

l l

l Note 1 l

Analysis l

l 1 l valve Decay Heat 11 ll l

l l

l l

l l

1 l Location: Containment ll l

l l

l l

l l

7 8

l Rm. 220

{ l Radiation l1.7 x 10 RADS l 2.0 x 10 RADS l CAL-44 l

J-9 l Sequential Testl None l

l ll l

l l

l l Flood Level Elev: 572 ' -2" l l l

l l

l lAbova Flood Level: No ll Aging l

40 Years l

4 Years l

I l

J-24 l

Analysis l

None l

4 l

ll l

l Note 2 l

l l

l l

i lNesdtd fort ll l

l l

l l

l l

l Hot Shutdown lX l ll l

l l

l l

l l

t j l l l Subme rgencel 572' - 2" l

565' - 0" l

B l

AD l

N/A l

None l

l Cold Shutdown lX l ll l

l Note 3 l

l l

l

.l l

ll l

l l

l l

l l

1 4

J O

i i

Facility: DIvis-Besse Unit 1 Dockst 50-346 SYSTEM CmPWENT EVALUATION WORKSHEET g

i Prepared by:

Checksd by: _ f/

Index No.: _224H-014A D.ite r J8 NOTES

_jkps.e-A

  1. f } Dacte:

2 Re v. :

1

_ //4/ h 1.

this component. CAL-40 qualifies components tested in a high j

(Reference AY) pH boric ac3d spray to a pH value of 5.

u i 2 104*F service temperature is used for _

f. Mtterials and/or components sensitive to thermal aging w asaure that associated component will maintain functi l

The limit switch is inside a sealed enclo onal operability in harsh environments.

3 5051-08).

i sure and is thus not affected by submergence (Ref

. Surveillance Test ST5051-07 s 4

The test subjected the limit switch to a t I,

in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

The conditions were then reduced f rom 334*FThe limit switch was then subjected to j

hours.

. second transient of 340*F and 117.7 psia which wasowed by a cooldown o

temperature was then maintained at 250*F and 39 7 and 107.7 psia to 250*F and 39.7 psia over a 3 ho prassure chamber where it was subjected to a tempand pressure inside contain maintained for 3 psia for 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

erature of 200*F and pressure of 24.7 psia for 26The limit switch ur period. The

{

214.7'r and 32.2 psia; at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the conditi n a low j

psia in 17 and 50 seconds respectively.

pais; at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, days. The temperature ons ars 204*F and 29.46 psias at 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> the conditiAt I hour the conditions a the conditions are 143*F and 18.03 psia I

Essed on this information it can be concl d d The conditions return to ambient in 7 daysons are 193.2*F and 27.08 test and f unctional af ter the test, environment than that which would reault from ththat the lab ue e postulated LOCA.

cxpoiure to the accident environment which would result fit can be concluded that the limit switch willSin j

1 roughout the rom the postulated LOCA (Reference H,G,X). remain functional during

\\

s i

e i

1

)

l

\\

n U

Facility:

L_ a u-Ce200 Unit 1 Dock 2tt 50-346 SYSTDI COMPONENT EvasLUATION WORKSHEET Index No.: _224H-015 Prepared by: __ _ N Rev.:

2 Date

(( /

Checkzd by:

,@ pe n C) ~ f Dates

/4t/PJ l

11 lEQUIffL*2fT DESCRIPTION ll I

l ENVIRONMENT l

l

~l l

DOCUMENTATION REF.

l ll Parameter l Specification Qualification l Specification l Qualification ll Qualification l Outstanding l l

ll 1

I_

lSyctem: Primary Pressure llOperating l 1 Year l

1.1 Years l

0 l

J-24 l Simultaneous l None l

Method l

Items l

I l

1 1

~l l

Control ll Time l

l l

l Note 4 l

Test l

l l

ll l

l l

l l

l l

l Plant ID No. ZSDH12A ll l

l l

l l

l l

l ll Temperature l 283.0 l

354.0 l

H, X

l J-9 l Simultaneous l None l

l Components Limit Switch ll

(*F) l l

l l

l Test l

l l

ll l

l l

l l

l l

l ll l

l l

l l

l l

lMInufteturers NAMCD ll Pressure 1

52.0 l

134.7 l

G, X

l J-9 l Simultaneous l None l

l l l (PSIA) l l

l l

l Test l

l l Modal Number: EA740-50100ll l

l l

l l

l l

ll l

l l

l l

l l

l Function: Valve Position ll Relative l

100.0 l

100.0 l

A l

J-9 l Simultaneous l None l

l Indication ll Humidity l

l l

l l

Test l

l l

ll n) l l

l l

l l

l l Accuracy: Spect N/A ll l

l l

l l

l l

l Demon: N/A ll l Boric Acid l Boric Acid l

l l

l l

t ll Chemical l

1800 ppm l

1800 ppm l

A l

J-9 l Simultaneous l None l

l Service: Normal Decay ll Spray l

pH 5.0 l

pH 5.0 l

l CAL-40 l

Test, l

l l Hast Suction Isolation ll l

l l

l Note 1 l

Analysis l

l l Valve Decay Heat 11 ll l

I l

l l

l l

l Location: Containment ll l

\\

l Rm. 220 ll Radiation l1.7 x 107 l

l l

l

_l RADS l 2.0 x 108 l

RADS l CAL-44 l

J-9 l Sequential Testl None l

ll l

l l

l l

l l

l Flood Level Elev: 572'-2"ll 1

l l

l l

l l

l Abova Flood Level:

No ll Aging l

40 Years l

4 Years l

1 l

J-24 l

Analysis l

None l

l ll l

l Note 2 l

l l

l l

]Ns6 dad for ll l

l l

l l

l l

) Hot Shutdown lXl ll l

l l

l l

l l

l lSubme rgencel 572' - 2" l

565' - 0" l

B l

AD l

N/A l

None l

Cold Shutdown lX l ll l

l Note 3 l

l l

l l

ll l

l l

l l

l l

~ cs Bh-//$

/]

,s

/

\\

\\.)

L.

CAL-40 quanfino cogon;nto tacted in a hi h thio ecmponent.

(Reference AY) g pH boric acid spray to a pH value of 5

?.

MItarials and/or cogonents sensitive t 104*F service temerature is used f esaure that associated couponent will maintain f un tio thermal aging will be replaced as per maint 1

The limit switch is inside a sealed e onal operability in harsh environmentsenance and replacement schedules to c

5051-08).

nclosure and is thus not affected by submer L

The test subjected the limit switch t gence (Ref. Surveillance Test ST5051-07 &

in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

The conditions were then reduced f rom 334*The limit switch was then subjected to hours.

F and 107.7 psia to 250*F and 39 7 psia second transie tcaparature was then maintained at 250*F preczure chamber where it was subjected to a t which was maintained for 3 and 39.7 psia for 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

aAd pressure inside containment peak at 283'F a over emperature of 200'F and pressure of 24 7 psiThe limit switch was then 214.7'F and 32.2 psia; at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the The and 52.0 psia in 17 and 50 seconds respectiv la for 26 days. The temperatu placed in a low paier at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, conditions arn 204*F and 29.46 psia; at 5 hou the conditions are 143*F and 18.03 psia e y.

At I hour the conditions are Id on this inf ormation it can be The conditions return to ambient in 7 drs the condition Oc:

tzst and f unctional af ter the testenvironment than that which would result from theconcluded tha ays.

por,tulated LOCA.

Since the limit switch remained oper ble limit switch cxpo2ure to the accident environment which wit can be concluded that the limit ould result f rom the postulated LOCA (Referswitch will remain f unctional during a

e throughcot the ence H,G,X).

er

- -