Text
-
'l p
m qn-lM j'
TOLEDO
%mm EDISON u
~
'j A Centerur Energy Cwmeny rm
,q
-l L ocket 50-346 DONALD C. SHELTON l
D s
vee Preadent-Nuckar
- j (419]249-2300
]
-License Number NPF-3
)
. Serial' Number 1827 y,
' July 20, 1990
]
?
United States Nuclear Regulatory Commission j
. Document Control Desk' 1
WashingtonD.C.
20555 3
.i l
Subjec t:
Fire Protection - Resolution of Draft Safety Evaluation Report (SER)
)
- Open Item on Voluntary Loss of Offsite Power Ei Gentlement-
.On Hay.31, 1990, Toledo Edison met with the NRC Staff to discuss resolut' ion of j
the Draft Fire: Protection SER open. item on voluntary loss of offsite power for the Davis-Besse Nuclear Power Station..At the meeting, Toledo Edison
- committed:toLrevise both'the Serious Station Fire.(DB-0P-02501) and Control-Room Fire (DB-0P-02519) procedures. The Serious Station Fire procedure lre' vision nov recommends manual stripping of non-essential loads on both trains
-i rather than inducing a voluntary loss of offsite power to perform the bus
~!
U
- alignment. The' Control Room Fire procedure revision recommends manual
- stripping.of non-essential loads on the protected train and stripping,offsite-power from the unprotected train. These changes will keep offsite: power 1
aligned if it is'available.
In addition, the required reading associated with-s the procedure revisions was committed to be completed prior to entry into j
. MODE-2.
m u
7 Toledo Edison has completed the above actions and believes that the Fire-j
. Protection Draft SER open item on voluntary loss of offsite power can be i
closed.
m D
Toledo Edison is preparing a License Amendment Request per the guidance r
contained in-NRC Generic Letters 86-10, " Implementation of Fire Protection l
Requirements" dated April 24, 1986, and 88-12, " Removal of Fire Protection y
' Requirements from Technical Specifications" dated August 2, 1988, to relocate 0 f
- the Fire Protection Technical Specifications and to update the Fire Protection l
A License Condition. Toledo Edison anticipates that this submittal vill be made l
Lvithin six months of the NRC's issuance of the Fire Protection SER.
[g7260237900720 l
p ADOCK 05000346 PDC M
ygq50tg.OISON COMPANY EDISON PLAZA 300 MAOISON AVENUE TOLEDO, OHIO 43652 a
/Dockot Number 50-346~
y,h,,.. ?- Liganse Nunbar NPF-3 ;
e 9 Tix$nrial: Numbar:1827 L1 A
e If you'have any questions'concerning-this matter, please contact Mr.,R. V.'Schrauder, Manager - Nuclear' Licensing, at (419)'249-2366.-
.Very truly yourr,.-
lf
'f KBR/mmb o
ices. P1 M. Byron, DB-1,. Senior NRC Resident Inspector
-A. B.. Davis, Regional Administrator,:NRC Region III T. V. Vambach,'DB-1, NRC' Senior = Project Manager-General Villiams,~ Chief of Staff Utility Radiological Safety Board of Ohio 6