Discusses Resolution of Draft SER Open Item on Voluntary Loss of Offsite Power.Util Preparing License Amend Request Per Generic Ltrs 86-10 & 88-12 to Relocate Fire Protection Tech Specs & Update Fire Protection License Condition
ML20055H460
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/20/1990
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1827, GL-86-10, GL-88-12, NUDOCS 9007260237
Download: ML20055H460 (2)


Text

-

'l p

m qn-lM j'

TOLEDO

%mm EDISON u

~

'j A Centerur Energy Cwmeny rm

,q

-l L ocket 50-346 DONALD C. SHELTON l

D s

vee Preadent-Nuckar

j (419]249-2300

]

-License Number NPF-3

)

. Serial' Number 1827 y,

' July 20, 1990

]

?

United States Nuclear Regulatory Commission j

. Document Control Desk' 1

WashingtonD.C.

20555 3

.i l

Subjec t:

Fire Protection - Resolution of Draft Safety Evaluation Report (SER)

)

Open Item on Voluntary Loss of Offsite Power Ei Gentlement-

.On Hay.31, 1990, Toledo Edison met with the NRC Staff to discuss resolut' ion of j

the Draft Fire: Protection SER open. item on voluntary loss of offsite power for the Davis-Besse Nuclear Power Station..At the meeting, Toledo Edison

- committed:toLrevise both'the Serious Station Fire.(DB-0P-02501) and Control-Room Fire (DB-0P-02519) procedures. The Serious Station Fire procedure lre' vision nov recommends manual stripping of non-essential loads on both trains

-i rather than inducing a voluntary loss of offsite power to perform the bus

~!

U

alignment. The' Control Room Fire procedure revision recommends manual
stripping.of non-essential loads on the protected train and stripping,offsite-power from the unprotected train. These changes will keep offsite: power 1

aligned if it is'available.

In addition, the required reading associated with-s the procedure revisions was committed to be completed prior to entry into j

. MODE-2.

m u

7 Toledo Edison has completed the above actions and believes that the Fire-j

. Protection Draft SER open item on voluntary loss of offsite power can be i

closed.

m D

Toledo Edison is preparing a License Amendment Request per the guidance r

contained in-NRC Generic Letters 86-10, " Implementation of Fire Protection l

Requirements" dated April 24, 1986, and 88-12, " Removal of Fire Protection y

' Requirements from Technical Specifications" dated August 2, 1988, to relocate 0 f

the Fire Protection Technical Specifications and to update the Fire Protection l

A License Condition. Toledo Edison anticipates that this submittal vill be made l

Lvithin six months of the NRC's issuance of the Fire Protection SER.

[g7260237900720 l

p ADOCK 05000346 PDC M

ygq50tg.OISON COMPANY EDISON PLAZA 300 MAOISON AVENUE TOLEDO, OHIO 43652 a

/Dockot Number 50-346~

y,h,,.. ?- Liganse Nunbar NPF-3 ;

e 9 Tix$nrial: Numbar:1827 L1 A

e If you'have any questions'concerning-this matter, please contact Mr.,R. V.'Schrauder, Manager - Nuclear' Licensing, at (419)'249-2366.-

.Very truly yourr,.-

lf

'f KBR/mmb o

ices. P1 M. Byron, DB-1,. Senior NRC Resident Inspector

-A. B.. Davis, Regional Administrator,:NRC Region III T. V. Vambach,'DB-1, NRC' Senior = Project Manager-General Villiams,~ Chief of Staff Utility Radiological Safety Board of Ohio 6

k_. -