| number = ML20097E567
| number = ML20097E567
| issue date = 08/16/1984
| issue date = 08/16/1984
| title = Responds to NRC 840720 Ltr Re Violations Noted in Insp Rept 50-263/84-11.Corrective Actions:Design Change Re Installation of Fire Detector Equipment Identified & Updated SAR Revised
| title = Responds to NRC Re Violations Noted in Insp Rept 50-263/84-11.Corrective Actions:Design Change Re Installation of Fire Detector Equipment Identified & Updated SAR Revised
| author name = Larson C
| author name = Larson C
| author affiliation = NORTHERN STATES POWER CO.
| author affiliation = NORTHERN STATES POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8409180235
| document report number = NUDOCS 8409180235
| title reference date = 07-20-1984
| package number = ML20097E560
| package number = ML20097E560
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC

Latest revision as of 12:01, 24 September 2022

Responds to NRC Re Violations Noted in Insp Rept 50-263/84-11.Corrective Actions:Design Change Re Installation of Fire Detector Equipment Identified & Updated SAR Revised
ML20097E567
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/16/1984
From: Larson C
NORTHERN STATES POWER CO.
To: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20097E560 List:
References
NUDOCS 8409180235
Download: ML20097E567 (3)


Text

.s sq Northern States Power Company 414 Nicollet Mall Minneapohs. Minnesota 55401 Telephone (612) 330-5500 August 16, 1984 Mr R L Spessard, Director Divisicn of Reactor Safety U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 M0!Tf1 CELLO NUCLEAR GENERATING PLAhT Docket No. 50-263 License No. DPR-22 Response to Notice of Deviation - dated July 20, 1984 This letter is sent to you in response to Inspection Report No. 263/84-11 which cited an apparent deviotion from NRC requirements.

Description of Deviation Section 10.3.1.3.1 of the FSAR states, "All circuits are supervised and the installation meets the requirements of NFPA-72D."

Section 3221 of NFPA 72D-1975 requires a permanent record indicating each time each signal transmitting station is operated shall be made at a supervising location.

During a plant tour on May 23, 1984, the inspector observed that the licensees' fire detection system does not have the capability of receiving a permanent record of signals sent to the central supervising station.

Response

In the recent updating of our FSAR, all previous design changes were reviewed for information which should be incorporated into the Updated Safety Analysis Report (USAR). As a rasult of this review, Design Change

  1. 78M002 - Install Fire Detector Equipment, was identified and the USAR was updated accordingly.

We acknowledge at this time t ha t the fire detector system installed under the provisions of Design Change #78M002 was designed to meet the circuitry requirements of NFPA 72D-1975, but it was not intended, with the in s ta lla-tion of this system, to make a commitment to the administrative and other requirements of this code.

It should also be noted that Section 3221 of NFPA 72D is Listed under Article 320 - Guard Tour Supervisory Service, which does not apply to our plant.

8409180235 840913 ,ni PDR ADOCK 05000263 PDR G

Mr R L Spessard, Dir Div of Reactor Safety, Region III August 16, 1984 Northem States Power Company Page 2 The article that does apply is Article 330 - Automatic Fire Detection and Alarm Service, which does not have the permanent record requirement

-listed under it.

We will revise our USAR at the next updating of this document to recognize this situation.

v ..

S -Q

- P C E Iarson Vice President Nucicar Generation cc: . Regional Administrator-III, IRC NRR Project Manager, NRC Resident Inspector, NRC G Charnoff i'

i I

4

  • ~

UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLAN'r Docket No. 50-263 RESPONSE TO NOTICE OF DEVIATION - DATED JULY 20, 1984 Northern States Power Company, a Minnesota corporation, by this letter dated August 16th hereby submits the response to Inspection Report No. 263/84-11 for the Mc,nticello Nuclear Generating Plant.

This letter contains no restricted or other defense information.

NORTHERN STATES POWER COMPANY By  ; M C E LarsoQ Vice President, Nuclear Generation On this //py/ day cf [ pl>u8 , /98h before me a notary public in and for said County, personalif afleared C E Larson, Vice President, Nuclear Cencration, and being first duly sworn acknowledged that he is authorized to execute this document on behalf of Northern States Power Company, that he knows the contents thereof and that to the best of his knowledge, information and belief, the state-ments made in it are true and that it is not interposed for delay.

&sdLL. 0./

U

_  : : ::....: : :::::.:..:o***** m OODY A BROSE l

Pto T ARY PUBLIC - 80NN5 50 ? *

}

HEt;NEPIN COUNTY {j

My Co.wmiss.on Espres Dec.26,1989 l;

^

_ . ^: ..^^::.._ :^. .^

I i

r j