ML20151Z958: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 37: Line 37:
inspection consisted of selective examinations of procedures and representative          ;
inspection consisted of selective examinations of procedures and representative          ;
i                records, interviews with personnel, and observations.by the inspector.
i                records, interviews with personnel, and observations.by the inspector.
Our inspector also verified the steps you have taken to correct the violation i                brought to your attention in our letter dated April 17, 1986. . We have no further i                questions regarding your action at this time.
Our inspector also verified the steps you have taken to correct the violation i                brought to your attention in our {{letter dated|date=April 17, 1986|text=letter dated April 17, 1986}}. . We have no further i                questions regarding your action at this time.
Within the scope of this inspection, no violations were observed.
Within the scope of this inspection, no violations were observed.
No reply to this letter is required.- Your cooperation with us is appreciated.
No reply to this letter is required.- Your cooperation with us is appreciated.

Latest revision as of 18:53, 10 December 2021

Forwards Safeguards Insp Rept 70-1100/88-07 on 880725-29.No Violations Noted
ML20151Z958
Person / Time
Site: 07001100
Issue date: 08/18/1988
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mcgill P
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20151Z962 List:
References
NUDOCS 8808300329
Download: ML20151Z958 (2)


Text

._

i AUG 181988

- Docket No. 70-1100 .

Combustion Engineering, Inc.

ATTN: Dr. P. L. McGill-2 Vice President - Nuclear Fuel Manufacturing

, Nuclear Power Systems

-1000 Prospect Hill Road 4

Windsor, Connecticut 06095-0500 t

Gentlemen:

Subject:

Inspection No. 70-1100/88-07  ;

This refers to the routine safeguards inspectior, conducted by'Mr. A. Della Ratta- '

of this office on July 25-29, 1988 of activities authorized by NRC License No. '

SNM-1067 and to the discussions of our findings held by Mr. Della Ratta with.

Messrs. R. Sheeran and D. Parks of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I I

!' Inspection Report which is enclosed with this letter. Within these areas, the  !

inspection consisted of selective examinations of procedures and representative  ;

i records, interviews with personnel, and observations.by the inspector.

Our inspector also verified the steps you have taken to correct the violation i brought to your attention in our letter dated April 17, 1986. . We have no further i questions regarding your action at this time.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required.- Your cooperation with us is appreciated.

Sincerely,  !

Original Signed Byt' I T.ichardE.Koimis Ronald R. Bellamy, Chief I Facilities Radiological Safety l and Safeguards Branch Division of Radiation Safety i and Safeguards

Enclosure:

NRC Region I Inspection Report Number 70-1100/88-07 l 4

4 8808300329 000018 PDR ADOCK 07001100 C PNV l

0FFICIAL RECORD COPY IR CE 88 0001.0.0 1 08/15/88 1

l l.Q,.1,

Combustion Engineering, Inc. 2 AUG 18 Jggg cc w/ encl:

A. E. Scherer, Director, Nuclear Licensing C. B. Brinkman, Manager, Washington Nuclear Operations Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Connecticut bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant. DRMA (w/o encl)

Robert J. Bores, ORSS J. Roth, DRSS W. Brown, NMSS RI:0RSS I L- RI:DRSS RI:0RS DellaRN/mlb/s13 K%pg Be my ,m 08/ l'?/88 08/t*/88 08//b/88 0FFICIAL RECORD COPY IR CE 88 0001.1.0 08/15/88

_______ _____ -