{{Adams | |||
| number = ML20155E972 | |||
| issue date = 09/27/1988 | |||
| title = Insp Rept 50-425/88-47 on 880808-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Module Rept,Supporting Documentation & Associated Work Activities | |||
| author name = Conlon T, Harris J | |||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) | |||
| addressee name = | |||
| addressee affiliation = | |||
| docket = 05000425 | |||
| license number = | |||
| contact person = | |||
| document report number = 50-425-88-47, NUDOCS 8810130078 | |||
| package number = ML20155E964 | |||
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS | |||
| page count = 17 | |||
}} | |||
See also: [[see also::IR 05000425/1988047]] | |||
=Text= | |||
{{#Wiki_filter:. | |||
* | |||
s@ Clov | |||
4' ' UNITED STATES | |||
{o j NUCLEAR REGULATORY COMMISSION | |||
! REGION ll | |||
oE 101 MARIETTA ST N.W. | |||
e,,,,' ATLANTA. GEORGIA 30323 | |||
Report No.: 50-425/88-47 | |||
Licensee: Georgia Power Company | |||
P. O. Box 4545 | |||
Atlanta, GA 30302 | |||
Docket No.: 50-425 License No.: CPPR-109 | |||
Facility Name: Vogtle 2 Module No. 13 8 Coatings | |||
Inspection Conducted: August 8-12 and August 15-19, 1988 | |||
Inspector: /e* W r- "L 9 " '4 7 ' 6'? | |||
J. R. Harris ' Date Signed | |||
Approved by: g/77 f- 6/- 2 7 - fY | |||
T. E. Conlon, Chief Date Signed | |||
Plant Systems Section | |||
Engineering Branch | |||
Division of Reactor Safety | |||
SUMMARY | |||
Scope: This evaluation was perfonned for one of eleven Readiness Review | |||
modules produced as part of a pilot Readiness Review Program being | |||
operated by the licensee pursuant to a recommendation contained in | |||
NUREG 1055. The NRC agreed to participate in the program by | |||
reviewing and commenting on each module. | |||
This evaluation was performed by reviewing the module report, | |||
examining supporting documentation and inspecting associated work | |||
activities. The licensee's review was verified by interviewing | |||
licensee personnel associated with preparing the module, sampling | |||
documentation and hardware examined by the licensee's reviewers and | |||
by sampling documentation and hardware not selected by the licensee's | |||
reviewers and by reviewing records of previous NRC inspections. | |||
Resul ts: In the areas inspected, violations or deviations were not identified. | |||
8010130070 G80920 | |||
gDR ADOCK 05000425 | |||
PNV | |||
- . . - - - - - - - - .- | |||
, | |||
. | |||
* | |||
. | |||
, | |||
. | |||
L | |||
REPORT DETAILS ! | |||
. l | |||
! | |||
1. Persons Contacted , | |||
Licensee Employees | |||
*J. A. Bailey, Project Licensing Manager ; | |||
* | |||
J. H. Draggs, GPC Quality Assurance ' | |||
, | |||
*E. D. Groover, QA Site Manager - Construction | |||
D. A. Lunsford, GPC Quality Assurance | |||
R. McManus, Manager Readiness Review | |||
; | |||
, | |||
Other licensee employees contacted during this inspection included | |||
J craftsmen, engineers, operators, technicians, and administrative ; | |||
' | |||
personnel. | |||
' | |||
l Other Organizations , | |||
*R. R. Thomas, Readiness Review Team Leader, Bechtel Corporation : | |||
2 | |||
D. Wiggins, Williams QC Inspector ; | |||
, | |||
NRC Resident Inspector | |||
R. Scheppens, Senior Resident Inspector, Construction l | |||
* | |||
* Attended exit interview | |||
2. Module 13B Coatings Unit 2 | |||
. a. Unit 2 Review , | |||
i i | |||
The Unit 2 Headiness Review program is being conducted at the ! | |||
' | |||
initiative of Georgia Power Company's (GPC's) management to assure | |||
that all design, construction and preoperational testing have been | |||
: properly implemented at the Vogtle Electric Generating Plant Unit 2. l | |||
Module 138 presents an assessment of the design and construction l | |||
l activities associated with protective coatings for Unit 2. This l | |||
evaluation was conducted to determine if the results of the program a | |||
review for coatings presented in this module are an ef fective and | |||
accurate assessment of design and construction requirements, that | |||
these requirements are being properly implemented, and that the | |||
resolution of findings identified in the module were correct and that | |||
: the corrections were made, | |||
b. NRC Review Objective | |||
l | |||
j The objective of this review and inspection was to evaluate the i | |||
, | |||
licensee's VEGP Unit 2 Readiness Review of Coatings. ' | |||
1 | |||
. | |||
: | |||
i | |||
j | |||
_ _ ___ - _ _ _ _ _ __--_ _ _ _ _ ._ _.__ _.-____ ___ ___-__' | |||
. . . -. ___ - - | |||
, | |||
. | |||
- | |||
. | |||
, | |||
2 | |||
, | |||
t | |||
This evaluation was accomplished through a detailed review of all | |||
sections of the module by: | |||
- Verifying that the design and construction commitments listed in | |||
the module are correct anci comply with FSAR commitments and | |||
regulatory requirements | |||
- Reviewing module findings and evaluating the correctness of - | |||
their resolution i | |||
- Review of a comprehensive representative sample of the records | |||
reviewed by the Readiness Review Staff and an independent sample | |||
l of documents | |||
- Walkdown observation of construction activities | |||
) c. Scope of Review | |||
This review which consisted of an examination of each section of the | |||
module was performed by an inspector from the Region II office in | |||
; Atlanta. Module Sections 1.0, 2.0, 4.0 and 8.0 which contain | |||
! information concerning the Module Introduction, Company Organization, , | |||
Program Description, Assessment of Module Adequacy and Assessment ; | |||
4 Plans and Checklists did not require as detailed a review or | |||
evaluation as the remaining sections. The more significant aspects : | |||
of the module appear in Sections 3.0, 5.0, and 6.0. These sections , | |||
discuss Licensee Comitments, Audits, Reportable Deficiencies, ' | |||
Special Evaluations, and Methods of Design and Construction | |||
4 Activities related to coatings for Vogtle Electric Generating * | |||
' | |||
d | |||
Plant 2. Review of these sections included a detailed review of the | |||
content, examination of items identified as findings, an examination i' | |||
of a sample of records reviewed by the Readiness Review Staff and an | |||
examination of an independently selected sample of records. [ | |||
; d. Inspection | |||
: The review and evaluation by the Region !! inspector was accomplished | |||
j by reviewing the module :n its entirety in the Atlanta Regional , | |||
Office beginning on Augus: 11, 1988, and by inspection at the Vogtle ' | |||
site on August 15-19, 1988. | |||
' | |||
! Section 1.0, Introduction, which presents an introduction to the | |||
intent and content of the module and Section 2.0 organization and | |||
- | |||
Division of Responsibility, which presents a description for design | |||
and application of coatings were reviewed for general content and | |||
background data. | |||
: | |||
i Review of Section 3.0, Comitments, was accomplished by examining the | |||
j Comitment and Implementation matrices and verifying that the | |||
applicable comitments were implemented. Verification that the | |||
i | |||
applicable commitments, were referenced and implemented was | |||
f | |||
j | |||
. | |||
_ . _ | |||
, | |||
. | |||
' | |||
- | |||
. | |||
; | |||
* | |||
, | |||
3 l | |||
accomplished by reviewing the FSAR, SER, Specifications, procedures, | |||
regulatory guides, applicable industry standards and responses to NRC | |||
generic letters. ; | |||
t | |||
! Review of Section 4.0, Program Description, was accomplished by i | |||
examining the two subsections and comparing the described work l | |||
process used by design and construction with FSAR, specification and | |||
procedure requirements. The inspector also compared the described ! | |||
work process with the understanding of program requirements that were | |||
examined during inspection of coatings conducted during the review of t | |||
this module. 7 | |||
. | |||
Review of Section 5.0, Audits, Nuclear Regulatory Inspections and - | |||
Special Evcluations, was accomplished by examining the four sub- , | |||
sections, and reviewing the audits, NRC inspections and special : | |||
evaluations and findings identified during the audit review. l | |||
l | |||
Review of Section 6.0, Program Assessment, was accomplished by ; | |||
2 reviewing Subsection 6.4.1, Commitment Implementation, and Unit 1 ! | |||
followup, Subsection 6.4.2. In process Activities of ongoing design : | |||
, and construction activities, and Subsection 6.4.3, Construction ! | |||
' | |||
Completion Process. Review of Subsection 6.4.1 included a review of i | |||
, design commitments, construction commitments, and corrective actions ! | |||
, | |||
taken to prevent recurrence in Unit 2 of the types of problems ! | |||
j identified by the Readinesc Review during the Unit 1 assessment. | |||
Three findings were identified by the Readiness Review Staff which | |||
involved concerns with warehouse records not maintained by the | |||
contractor, conflicting coating requirements in purchase specifica- ! | |||
; | |||
tion and contract procedure did not meet specification requirements. l | |||
Review of Subsection 6.4.2 included examination of ongoing design and . | |||
! construction processes. ! | |||
l | |||
Three findings were identified by the Readiness Review Staff which | |||
involved errors in processing FCRs, contractor procedures which cite | |||
; different revision of standards than contractor QA Manual and FSAR | |||
' | |||
conflicts in contract procedure for deviation reporting. Review of | |||
Subsection 6.4.3 construction completion process included a review of | |||
applied coatings, quality documentation, material traceability, | |||
inspector qualification and painter certification. | |||
Review of Section 7.0 covered assessment module adequacy and proposed | |||
corrective action taken for findings. | |||
j Review of Section 8.0 covered assessment plan and checklists proposed i | |||
" | |||
for evaluating Unit 2 design and construction activities associated | |||
! with protective coatings. | |||
! | |||
. | |||
' | |||
l | |||
l | |||
l | |||
- _ . - . . - - - . . - - - _ - _ - - - . . , - . - . _ - - _ - - . . | |||
- - . --, D | |||
. | |||
' | |||
. | |||
4 | |||
3. Evaluations | |||
The evaluation of each section reviewed is prov!ded below. For each | |||
section a description of the section that was reviewed and the basis of | |||
; acceptance is provided. | |||
a. Section 1.0 - Introduction | |||
This section of the module presented an introdu; tion to the intent | |||
and content of the module organization. This section was reviewed | |||
primarily for content and background information. No additional | |||
followup or evaluation of the section was required. | |||
b. Section 2.0 - Organization | |||
This section presents a description of the organization and division | |||
of responsibility of GPC, bechtel Western Power Company, Williams | |||
Pnwer Services. Inc. for design and construction activities related | |||
to coatings. This section of the module was reviewed for content | |||
only. No additional followup or evaluation of this section was ' | |||
required. | |||
c. Section 3.0 - Commitments | |||
(1) This section contains a listing of commitments and implementing | |||
documents which are presented in two matrices. The first matrix | |||
is the commitment matrix which contains a listing of the sources | |||
and subject of licensee commitments. Commitments listed in this | |||
matrix were identified by the Readiness Review Staff through a | |||
review of the FSAR and 6esponie to NRC questions. The second | |||
matrix is the implementation matrix which contains a listing of | |||
documents and features discussed in the FSAR and implementing | |||
documents. The Readiness Review Staff reviewed these documents | |||
to verify compliance with the commitment requirements. | |||
(2) The Region II inspectors review and evaluation of this section | |||
was lerformed by comparing the licensing commitments and | |||
corresponding source documents with the Standard Review Plan, | |||
the NRC Regulatory Guides (RGs), the provisions of Industry Standards | |||
and the FSAR. The review also included an examination of | |||
commitment sources and implementing procedures and specifica- | |||
tions to verify that the FSAR commitments were being properly | |||
implemented in the Readiness Review Program. | |||
(3) Review of this section showed that the Vogtle licensing commit- | |||
ments and implementing documents for the protective coating | |||
systems comply with the requirements of the FSAR Regulatory | |||
Guides and Industry Standards. | |||
__ - - . . _ _ _ _ _ . _ _ _ - | |||
__ | |||
, | |||
- | |||
. | |||
, | |||
! | |||
5 | |||
: | |||
d. Section 4.0 - Program Description | |||
(1) This section of the module, is divided into two subsections | |||
which describes the work process utilized by design and | |||
construction for coatings at Vogtle Unit 2. Subsection 4.1 | |||
provides a description of the work flow, documentation and | |||
design control activities for protective coatings for permanent | |||
plant systems. The emphasis is on coating materials and | |||
approved coating systems for areas and equipment inside the | |||
containment building. The architectural group of the Materials | |||
and Quality Services Group of Bechtel, selected coating systems | |||
to meet the requirements of the service areas, the surfare to be | |||
coated and the architectural and special service conditions as | |||
applicable. This subject addresses Design Basis Accident Tests | |||
(DBA), field coating systems, shop coatings, unqualified | |||
coatings, specification development, material specifications, | |||
field coating specification drawings, shop coating program, | |||
quality requirements and the Westinghouse coating program. | |||
Subsection 4.2 construction contains a description of coatings | |||
and inspection activities, a flow chart and a list of codes and | |||
standards applicable to receipt, storage, application and | |||
inspection activities. | |||
(2) Review of this section indicated that the program described in | |||
the subsections is in accordance with the NRC inspector's | |||
understanding of the work processes used by design and | |||
construction for coatings at the Vogtle Plant. | |||
e. Section 5.0 - Audits and Inspections | |||
(1) This section contains a discussion of Quality Assurance Audits, | |||
Nuclear Regulatory Comission inspections and project | |||
reportability evaluations performed in the area of coatings. In | |||
addition a description of special evaluations and a discussion | |||
of the project evaluation of Unit 1 findings are included. The | |||
findings, violations and evaluations applicable to coatings for | |||
Unit 2 were reviewed by the Readiness Review Staff and factored | |||
into the assessment presented in Section 6 of this module. | |||
(2) Review of this section by the inspector included a review of the | |||
four subsections. Review of the referenced audits and review of | |||
the most recent audits conducted by GPC and the Williams | |||
Corporation QA verified that the audits were being conducted within | |||
the correct time and that proper corrective actions were taken | |||
on Audit Findings. Review of the special evaluation concerning | |||
the effect of the inorganic zine lining of the diesel fuel oil | |||
storage on the operability of the diesel generators included | |||
review of the NRC staff response to this item dated Octcber 15, | |||
1987. This response included the NRC staff review of the | |||
licensee's submittals dated July 13, September 30, and October | |||
.. | |||
l | |||
- | |||
1 . | |||
6 ! | |||
l | |||
i 1987. Based on the "eview of these submittals, the NRC staff | |||
' concluded that the zinc coating in the diesel generator fuel i | |||
oil storage tanks will not affect the operability and reliability i | |||
of the diesel generators. Review of the special evaluation | |||
concerning cracking of concrete floor coatings in the Unit 1 | |||
, | |||
; containment indicated that the most probable cause was a high ! | |||
film thickness in local areas coupled with mechanical damage to i | |||
the coatings. This was based on the fact that samples of the ; | |||
) cracked coatings exhibited high filler body coating thickness. ! | |||
Recommendations to prevent cracking of coatings included use of | |||
a rubber float, minimal use of needle guns, inspection of coated r | |||
, | |||
concrete floors for mechanical damage prior to application, | |||
1 and areas adjacent to damaged areas to be protected or prepared | |||
' | |||
to prevent excessive thickness. | |||
The review also covered a review of the findings identified , | |||
during the Readiness Review of Coatings in Unit 1. The - | |||
i Readiness Review Staff reviewed these findings to verify that l | |||
; proper corrective ac: ions were taken and to determine if they , | |||
i | |||
were applicable to Unit 2. This assessment identified two ! | |||
' | |||
findings where corrective actions were not entirely effective. | |||
These were identified as Findings 2RRF-13B-002, Errors in | |||
Processing FCRS and Finding 2RRF-138-003, Required Warehouse | |||
i Records Not Maintained by the Contractor. Section 6.0 contains | |||
a more detailed discussion of these findings. | |||
f. Section 6.0 Program Assessment | |||
The assessment was performed to provide added assurance that the l | |||
project continued to comply with licensing commitments. The | |||
3 | |||
assessment was organized into the following three parts; Part 1, , | |||
' | |||
Comitment Implementation and Unit i finding followup; Part 2, Design ' | |||
and Construction program activities; and Part 3, Design and r | |||
Construction completion. ! | |||
The objective of Part 1 of the assessment was to assess implementa- I | |||
tion of licensing commitments with emphasis on those revised or added i | |||
J | |||
since Unit 1 Readiness Review by Final Safety Analysis Report l | |||
, | |||
amendments or project letters and to assess the adequacy of i | |||
application to Unit 2 of corrective actions resulting from Unit 1 ' | |||
i Readiness Review. | |||
During the review of comitment implementation which covered Design | |||
: and Construction Requirement and Unit 1 finding followup, several . | |||
' | |||
findings were identified. These were: Finding 2RRF-138-004, | |||
! Conflicting Coating requirements in Specification X4A J16; - | |||
Finding 2RR F-13B003, No Contractor Procedure for receipt and | |||
l | |||
, issuance of each batch of coating materials; Finding 2RRF-138-005, | |||
I Contractors general procedure for control of application procedures ; | |||
I allowed exception to the commitment of RG 1.54 which requires that ; | |||
; | |||
i | |||
_ __ | |||
, | |||
. | |||
- | |||
. , | |||
7 | |||
application procedures conform with the coating manufactures written | |||
instructions , . | |||
Unit 1 findings were evaluated for continued application of | |||
corrective actions to Unit 2 activities and the Unit 2 assessment | |||
results were reviewed for repetition of Unit 1 findings. For 14 of | |||
the unit findings the corrective action was found to be effective. 3 | |||
The corrective action for one Unit 1 finding to establish a > | |||
procedural requirement to maintain a warehouse record was found to be [ | |||
not fully effective as described in the discussion of Unit 2 Finding ! | |||
2RRF-138-003. Another element of the finding in Unit 1 was found to | |||
be repeated in Unit 2. This identified that FCRs were making generic j | |||
changes to the coating specification, but FCRs were identified as not ! | |||
requiring incorporation in the specification. This was identified as ! | |||
Finding 2RRF-138-002 which is discussed in Part 2, In Process ; | |||
Activities. l | |||
t | |||
The objective of Part 2 of the assessment was to examine ongoing i | |||
design and construction processes. The design portion of Part 2 [ | |||
covered the evaluation of 13 Field Change Requests (FCRs). This ; | |||
review identified repetitive failure to properly Identify and process t | |||
changes affecting project Class 02c Coatings (Coatings Inside i | |||
Containment). Field Change Requests inside containment were ! | |||
improperly identified as project class 62C and were not sent to l | |||
Quality Assurance (QA) for review. In addition FCRs properly ! | |||
identified as Class 02c were not sent to Quality Assurance for review ! | |||
as required by procedure. This was identified as Finding | |||
l | |||
2RRF-138-002, Errors in Processing FCRs. t | |||
, | |||
The construction portion of Part 2 of the assessment examined in | |||
process coating application, coating material storage and deviation ( | |||
reports. in process application activities were assessed by i | |||
observing preparation, inspection and application activities in the i | |||
field. Attributes assessed included proper environmental testing, j | |||
surface preparation and inspection, documenting and mixing of i | |||
materials and application of coatings. Material storage areas were i | |||
also examined for compliance to procedural requirements. Attributes t | |||
assessed included temperature control, area cleanliness and material l | |||
identification. Review of deviation reports covered the contractor's , | |||
deviation report procedures and a samole of deviation reports. The l | |||
deviation reports were assessed for compliance to project require- ' | |||
ments. The reports were reviewed for adequate description. I | |||
appropriate disposition, proper justification and required approvals. ! | |||
Review of the deviation report procedure identified a deficiency in j | |||
procedural requirements for deviation tracking and conflicts. This , | |||
was identified as Finding 2RRF-138-008 Conflicts in Contractor l | |||
Procedure for Deviation Reporting. Review of the two contractor | |||
control procedures indicated that they both referenced an incorrect ; | |||
revision of ANS! N45.2.9. This was identified as Finding l' | |||
2RRF-138-006 Contractor Procedures Cite Different Revision of | |||
Standard than Contractor QA Manual and FSAR. ; | |||
1 | |||
l | |||
1 | |||
i | |||
! | |||
- - - - - - | |||
. | |||
. | |||
* | |||
. | |||
, | |||
! | |||
8 | |||
h | |||
' i | |||
The objective of Part 3 of the assessment was to evaluate the | |||
construction completion process. This covered applied coatings, | |||
qu4ity documentation, material traceability, inspector qualification | |||
and painter certification, , | |||
i | |||
! | |||
Review of Section 6.0 by the Region II inspector included a review of ( | |||
' | |||
the three activities addressed in the assessment plan. Thic included ! | |||
' | |||
) a review of licensing connitment requirements, and Unit 1 finding | |||
q | |||
followup, design and construction program activities and design and | |||
i | |||
construction completion, and review of findings and corrective l | |||
' | |||
actions taken to resolve the findings. This included a review of ( | |||
procedura, FSAR requirements, Field Change Requests (FCRs), Work | |||
' | |||
' | |||
} | |||
i Requests (WRs), training and certification of inspectors and | |||
i | |||
painters, Deviation Reports (DRs), storage controls, and a walkdown | |||
j and inspection of ongoing coating work in the Unit 2 containment. r | |||
; Review of the findings identified by the Readiness Review Staff and | |||
i the corrective actions associated with the findings are as follows: | |||
! | |||
j (1) Finding 2RRF-138-000, Errors in Processing FCRs | |||
i Project Reference Manual Section 17 states in part the | |||
j following: | |||
~ | |||
- 17.5.2.a - After review and dispositf on by Engineering if a | |||
design change is needed in the affected documents, an x is l | |||
! placed in block 2 and/or 6 of the Field Change Request l | |||
j (FCR) form | |||
l - Construction specification change notices (CSCNs) and l | |||
: mechanical specification change notices are incorporated in : | |||
accordance with part C, Section 2a | |||
l - 17.5.3 - Justification con::arrence shall be provided on the ! | |||
j FCR prior to approval of Block 1b l | |||
- | |||
i | |||
- 17.6.2.5 - FCRs initiated for specifications that are Q | |||
l class fire protection or radwaste shall be forwarded to l | |||
l Quality Assurance (QA) for their concurrence prior to l | |||
l submitting the originals to Georgia Power Company. | |||
I | |||
i Contrary to the above, of a sample of 13 FCRs reviewed for | |||
i Readiness Review Module 138 coatings, the following | |||
l discrepancies were noted which were written against | |||
j Specification X1AJ07 | |||
i | |||
! | |||
- C-FCRB-22524 - Generic Change identified as NA/NA missing QA | |||
! review | |||
1 | |||
j - C-FCRB-21176 - Missing QA review, incorrect project class | |||
- C-FCRB-21175 - Missing QA review, incorrect project class | |||
; | |||
; | |||
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ . | |||
. | |||
. | |||
. | |||
9 | |||
- C-FCRB-19820 - Generic change identified as NA/NA missing QA | |||
review and justification | |||
- C-FCRB-20176 - Missing QA review, incorrect incorporation | |||
- C-FCRB-19891 - Missing QA review | |||
The root cause of this finding was that personnel processing | |||
FCRs had an inadequate understanding of the coating project | |||
class designation and the QA review requirement associated with | |||
the coating 02c class. | |||
Remedial action included correction to the FCRs and | |||
Specification X1AJ07 was revised May 12, 1988. This revision | |||
corrected the revision block to indicate that the FCR was | |||
modified. Action to prevent recurrence included training of | |||
appropriate architectural personnel re the coating | |||
project classification (02c versus 062c)garding | |||
; the need for QA review | |||
of FCRs with the project class 02c, and identification of | |||
generic changes requiring incorporation into the specification. | |||
In following upon this finding the inspector reviewed the FCR | |||
identified as having error and verified tFat proper corrective | |||
actions were taken and also reviewed 13 additional FCRs to | |||
verify that similar problems did not exist in other FCRs. The | |||
inspector also verified that proper revisions were made to | |||
specification X1AJ07 and that the proper training had been given | |||
to appropriate t .chitectural personnel. | |||
(2) Finding 2RRF-138-003 - Required Warehouse Record Not Maintained | |||
by Contractor | |||
Specification X1AJ07, paragraph 12.1.1A. 12.7.1 and 12.7.2 | |||
require that the documentation requirements of ANSI N 101.4 be | |||
i | |||
met and allow alternate forms providing the same degree of | |||
documentation to be used. Example 3 of the Quality Document ' | |||
Foms Attachment to Specification X1AJ07 is a warehousing record | |||
documenting the receipt and withdrawal of coating materials for | |||
each batch of coating material received. | |||
Contrary to the above no procedure was found prescribing | |||
preparation and turnover of the warehousing record. | |||
Remedial action included revision of Procedure WC-015-253 | |||
Warehouse Coating Records to address the upkeep and turnover of | |||
the warehousing records. In addition the existing warehousing | |||
records have been reviewed by the Williams Quality Control | |||
Ocpartment. The review found thai records were missing for the | |||
; period of September 9.1986 to December 10, 1986. The missing | |||
records were addressed in Deviation Report WC-88-0^3 dated | |||
May 26, 1988. The approved disposition was hardware not | |||
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ . | |||
. _ _ . _._ __ _ .- _ _ _ __ .. - _ _ | |||
, | |||
\ | |||
. | |||
- ; | |||
, | |||
10 | |||
a f fected. The Williams Quality Assurance / Quality Control | |||
(QA/QC) Site Manager concluded after completing the review, , | |||
that the existing warehouse records are acceptable as quality l | |||
documents, i | |||
* | |||
The new QC procedure has been approved by GPC Qua11tv tontrol | |||
and is controlled by the Williams QC Department thro p Document i | |||
Control Procedures WC-003 and WC-019. Williams Q M ity Control ! | |||
will monitor the warehousing records closely to assure i | |||
compliance. In following up on this item the HRC inspector l | |||
! | |||
reviewed the referenced procedures and current warehouse records | |||
and verified that ANSI N101.4 and specification X1AJ07 | |||
requirements were being met. | |||
I | |||
! | |||
(3) Finding ARRF-13B-004, Conflicting Coating Requirements in | |||
Purchase Specifications. | |||
Design Criteria DC-1000A, Section 10, requires that coatings ! | |||
inside the containment meet the requirements of ANSI N101.2. j | |||
i | |||
Specification X4AJ16 (Containment Cooling Units), Revision 10, l | |||
dated December 10, 1986, Paragraph 6.3.1 requires that coatings l | |||
be certified to ANSI N101.2. Paragraph 6.3. A requires an j | |||
inorganic Zine primer followed by an epoxy topcoat and also l | |||
lists acceptable suppliers and products. j | |||
f | |||
The Ameron and Carboline inorganic Zinc primers listed are not j | |||
their N101.2 qualified products. The products listed are all ! | |||
inorganic Zinc primers. No epoxy topcoat is listed. This i | |||
finding identifies conflicting requirements within Specification i | |||
X4AJ16. Paragraph 6.3.2a of the specification requires ! | |||
documentation in accordance with ANSI N101.4 ar.d Regulatory | |||
Guide 1.54. In the same specification Paragraph 6.3.A.4 | |||
requires specific name brand coatings which will not meet these | |||
documentation requirements and makes no allowance for acceptable | |||
al+ernatives. I | |||
To detemine the extent of this problem with conflicting ; | |||
requirements, a sample of 8 out of approximately 40 specifica- l | |||
tions requiring the ANSI N101.4 and N101.2 documentation was | |||
reviewed. These Specifications were X2AG03, X.!AGOS, X2AG06, | |||
X2AG07, X2AG08, X2AH01, X2AH02 and X2AP01-C9.1. No confifcts or | |||
discrepancies between the approved coating lists and | |||
documentation requirements were identified. The purchase order | |||
document PAY 2-86 was reviewed to determine the quality of paint | |||
actually supplied for items in Specification X4AJ16. The Supplier | |||
Quality Verification Document List - Detailed documents that the | |||
paint meets the requirements of Paragraph 6.3.1.2.a of X4AJ16. | |||
Also the product identity and Quality Assurance certification | |||
record certifies that the paint meets the manufacturing require- | |||
ments of ANS! N101.2, ANSI N101.4 and ANSI N5.12 when properly | |||
mixed. Documentation that the paint was properly mixed and | |||
l | |||
. | |||
__ , ._ . - - | |||
. | |||
. | |||
i 11 | |||
I | |||
i | |||
applied was also provided. These documents p avide objectivt | |||
evidence that the paint meets the more stringent requirements | |||
of Paragraph 6.3.1.2a of X4AJ16 and that the conflict in the | |||
specification did not degrade the paint quality. The root cause | |||
of the finding was attributed to human error. The specification | |||
writer did not realize that the paint specification contained | |||
conflicting requirements and that the review process failai to | |||
uncover the mistake. Specification X4AJ16 was revised June 8, | |||
1988, to delete Paragraph 6.3.A.4. This will eliminate the | |||
conflict between documentation requirements arid avoid the | |||
procurement of unqualified toatings. This will assure that | |||
future materials procured under X4AJ16 will meet the require- | |||
ments of Paragraph 6.3.1.2.a. During this inspection, the NRC | |||
tr.spector reviewed the revision to Specification X4AJ16 and nine | |||
other specifications to verify that similar errors were not in , | |||
the specifications. | |||
(4) Finding 2RRF-13B-00-5, Contractor Procedure Does Not Meet | |||
Specification and FSAR Requirements | |||
Final Safety Analysis Report (FSAR) Section 6.1.2.1, | |||
Specification X1AJ07 Section 12.5.1 and Williams QA Manual ; | |||
Section 5.4.4 and job specific addendum Section 5.4.1 require | |||
, written approval of the manufacturers application procedures. 3 | |||
; | |||
l This finding identified that Williams Procedure WC-300, | |||
i Sections 300.4.1.4 and 300.7 allow exceptions to these i | |||
l rmai rements . | |||
l In following up on this finding Williams QC reviewed all i | |||
, | |||
applicat'on procedures and found options or exceptions stated or | |||
' | |||
implied in Sections 300.2.2, 300.2.3, 300.4.1.4 and 300.7 of | |||
i Procedure 9C-300. | |||
The cause of this error was due to an effort by Williams ! | |||
Management to provide changes based on oral concurrence prior to | |||
receiving written aporoval from the coating manufacturer. To | |||
prevent recurrence of this item the Williams QA/QC manager vill , | |||
ensure that the written approval from the coatir.g manufacturers | |||
~ | |||
is obtained prior to implementation. | |||
Investigation of this item by the NRC inspector showed that in 7 | |||
no instance had procedures been issued without the oral approval | |||
, | |||
of the manufacturer. All procedures have been submitted to the | |||
manufacturer and have been approved in writing. No coatings | |||
have been unacceptably applied as a consequence of this ; | |||
discrepancy. | |||
' | |||
i | |||
' | |||
(5) Finding 2RRF-138-006, Contractor P ccedures Cite Different | |||
Revision of Standard Than the Contractar QA Manual and FSAR. | |||
' | |||
- . . . - _. .- . _ - _ - _ | |||
.. -. ._ -_ . . _ . _ _ | |||
._ , - . - - _ - - __ _ -- _. _- - | |||
- | |||
. | |||
;- | |||
- | |||
. | |||
) | |||
j 12 | |||
, | |||
4 | |||
FSAR Section 17.1.2 and Williams QA Manual job specific | |||
j addendum, Section 5.10 require confonnance to ANSI N45.2.9-1973 - | |||
eleventh draft. Williams procedure WC-003, "Document Security" | |||
and Procedure WC-019, Controlled Document Revision and | |||
Distribution reference ANSI N45.2.9-1974. i | |||
l | |||
i | |||
The cause of the finding was that no reference i.e the QA ~ | |||
i procedures manual would lead the user to the job specific | |||
i addendum of the QA manual as the source of the correct edition | |||
, of referenced standards. Williams QA/QC site manager checked | |||
I the QA procedures to verify that other standards referenced are | |||
the edition stated in the job specific addendum of the QA | |||
manual. All were found to be the edition stated in the job | |||
i specific addendum. Williams revised Procedure WC-003 and WC-019 | |||
i to reference ANSI N45.2.9-1973, eleventh draft. These revisions k | |||
) were completed April 19, 1988. To prevent recurrence of this ! | |||
! | |||
error Williams QA/QC site manager will ensure tnat all future ! | |||
) procedure have i.he correct standards referenced. | |||
4 | |||
l The NRC inspector reviewed the corrective actions taken on this i | |||
j finding. Review of the 1973 eleventh draft and 1974 revision of : | |||
ANSI N45.2.9 showed that there were no changes that would have ! | |||
l | |||
; adversely affected the quality of Williams documentation. The j | |||
j inspector also checked the Williams QA manual for correct : | |||
i revisions of referenced standards to further evaluate the ; | |||
j broadness of this finding. No further discrepancies were found. [ | |||
. | |||
. | |||
1 (6) Finding 2RRF-138-008 Conflict In Contractor Procedure for ! | |||
: Deviation Reporting [ | |||
l Vogtle Electric Generating Plant QA manual Section 15.2 states: | |||
d | |||
i | |||
j - The identification, documentation segregation, review, | |||
i | |||
: disposition and notification of affected organization of i | |||
' | |||
nonconformance of materials, parts, components or services ! | |||
is controlled. ; | |||
I | |||
. - Nonconformances concerning departures from design i | |||
l specification and drawing requirements which are [ | |||
t dispositioned "use as is" or "repair" are dispositioned ! | |||
j by the responsible engineering organization. [ | |||
i i | |||
This finding identified two discrepancies | |||
I | |||
j - Williams Procedure WC-008 contains no provisiv of tracking i | |||
j reworkable deficiencies defined in Secti" 18.5.1.2. ! | |||
Requirements for identifying non-reworkah s :ficiencies i | |||
are conflicting (Sections 008.5.1.3 and 0 0 2.1). ! | |||
l' | |||
- Provisions of Williams Procedure WC-008 for approval of | |||
l | |||
"use as is" or "repair" dispositions are conflicting and , | |||
! I | |||
! l | |||
T | |||
. | |||
* | |||
. | |||
1 | |||
1 | |||
13 | |||
. | |||
l | |||
' | |||
I | |||
do not identify project engineering as the responsible | |||
engineering organization (Sections 008.5.2.4, 008.5.7.2, | |||
008.6.3.2.1, 008.6.323 and 008.6.3.26). | |||
Investigative action of the first discrepancy confirmed that the | |||
original intent of procedure WC-008 Section 008.5.1.3 was to | |||
cddress the tracking of rejected items which were reworkable. A | |||
typographical error was made and Section 008.5.1.3 in | |||
advertently stated "rejected items which are not reworkable." | |||
Section 008.5.1.3 also addresses an open item 100 Williams QC | |||
l stopped using the log in May of 1986. At that time the | |||
responsibility for keeping the log was moved from the QC clerk | |||
to the QC inspectors. The investigation found that the Williams | |||
QC inspectors failed to use the log and that Williams QC management | |||
l | |||
falled to ensure that the inspectors used the log. The purpose | |||
l | |||
for the open item log was to track reworkable items. Prior to | |||
1 May 1986, the log documented and verified that reworkable items | |||
' | |||
were handled in a timely manner. Williams QC replaced the open | |||
item log with a designated hold file. Willaims QC management | |||
failed to make the appropriate change in procedure WC-008 to | |||
reflect the new method of tocking. | |||
Williams QA/QC management reviewed all reworkable rejected items | |||
reported between May 1986 and April 6,1988. There were 568 | |||
l | |||
reworkable, rejected items reported during this period. A random | |||
; sampling of 72 of the 568 items were reviewed and it was determined | |||
that 50 were reworked within four days, two within seven days and | |||
20, all of which were on one inspection report, were not reworked | |||
for four months. Although the open item log had not been used | |||
I since May 1986, these 20 rejects were recorded in May 1987 but | |||
were never placed on a Deviation Report. The inspection report | |||
was placed in the designated hold file until it was reworked. l | |||
The Williams QC site manager did not write a Deviation Report i | |||
because the delay was caused by construction restraints which did | |||
not allow the workers back into the area for rework. Williams I | |||
management concluded from this review that items were reworked | |||
in a timely manner except as constrained by other construction | |||
activity. As of April 6, 1988, there were no outstanding | |||
reworkable rejected items in tha designated hold file. The root | |||
cause of this finding was attributed to inappropriate attention | |||
level of Williams QC management. | |||
Investigation of the second part of this finding established | |||
that Section 008.6.3.23 had three editorial errors. The words | |||
"recomended dispositions" are used twice in this section. The i | |||
correct words should be "approved dispositions." The third l | |||
error had the "owner or designee" approving what should have | |||
been the approved disposition. The design engineering group | |||
should approve the approved disposition. The root cause of the | |||
l | |||
l | |||
, | |||
_. . ._. .. | |||
. - . - - _ . __ | |||
. - - . . | |||
_- | |||
.,. .. . --- - . . - . - - - . . - .- .. _ | |||
< . | |||
- | |||
. | |||
, | |||
i 14 > | |||
. | |||
error was inadequate review of the final printed text prior to | |||
final approval. : | |||
i | |||
The following corrective actions were taken to correct these i | |||
findings. Williams revised Procedure WC-008 Section 008.5.1.3 i | |||
to direct any inspection reports which identify reworkable | |||
deviations to be placed in a designated hold file until the , | |||
areas have been reworked. This file will be reviewed monthly by t | |||
the QA/QC site manager. Any item over 60 days old shall be | |||
, | |||
i | |||
: ; | |||
! reported as a deviation report. The inspection report shall remain | |||
in the hold file until it has been closed by the approved ; | |||
4 disposition on the deviation report. Deviation Report WC-88-002 i | |||
a | |||
has been written to resolve the procedure violation cited and it . | |||
j has been dispositioned "hardware not af fected. " The | |||
t | |||
i typographical error in Section 008.5.1.3 has been corrected. ! | |||
Williams has also revised procedure Section WC-008, | |||
!l Section 008.6.3.23 to state "approved dispositions" instead of | |||
"recommended dispositions" and "design engineering group" | |||
instead of "owner designee." | |||
To prevent recurrence of this finding, Williams QA/QC reviewed | |||
; their Quality Control procedures and determined that the QC i | |||
: Manager reviews deviation report trends and rejected open items | |||
1 on a monthly basis. No other monthly review requirements were , | |||
j found. The trend review (Form WC-0080) is in place and a | |||
j checklist for the monthly review of rejected open items (Form | |||
; | |||
WC-008E) has been added to the nonconfonnance control procedure. | |||
1 | |||
! During this in3pection, the NRC inspector reviewed the changes | |||
made to the procedures and reviewed current deviation reports. ! | |||
! This review indicated that appropriate corrective actions have l | |||
' | |||
l | |||
been taken on this finding. | |||
4. Findings | |||
; | |||
l No NRC findings were identified during the review of Module 138 Unit 2. | |||
Review of this Module showed that the Readiness Review Staff did a | |||
comprehensive review of design and construction activities for ssfety- | |||
i related coatings and that significant findings were identified by the | |||
: Readiness Review Staff. This resulted in significant corrections in the | |||
i program that clarified inspectica requirements, documentation requirements | |||
, | |||
and inspection activities. | |||
; | |||
5. Conclusions | |||
Based upon the review within the scope of Module 138, Coatings the NRC has | |||
reached the following conclusions for coatings for Vogtle Unit 2. | |||
i | |||
4 | |||
) | |||
_ _ _ | |||
_ _- . . _ _ _ _ _ -~ - ._. . . _ _ _ __ __ _ - _ _ | |||
, | |||
- | |||
. | |||
15 | |||
a. Summary of Specific Conclusions , , | |||
The module has been determined to be acceptable. A summary of the , | |||
report comments for each module section is as fo' lows: > | |||
(1) Section 1 - Introduction. The module organization and project . | |||
status were correct as of the date of the module publication. l | |||
7 | |||
: (2) Section 2 - Organization and Division of Responsibilities. The | |||
organization and responsibilities presented in Section 2 of the | |||
< Module were reviewed and verified as being correct. ; | |||
(3) Section 3 , Commitments. Review of the commitments as listed in " | |||
' | |||
Section 3 of the module indicated that licensing commitments and | |||
implementing documents comply with the FSAR, Regulatory Guides | |||
, | |||
and Industry Standards. l | |||
(4) Section 4 - Program Description. The inspector reviewed the | |||
description of the program as given in Section 4 of the module. | |||
This included a review of the referenced design and construction | |||
controls for coatings. Review of this section indicated that | |||
' the description cf controls of coatings presented in Section 4 ' | |||
* | |||
are correct and is in agreement with the FSAR and project < | |||
i requirements. | |||
i (5) Section 5 - Audits and Inspections. Review of this section | |||
l included a review of audits, NRC inspections, special | |||
) evaluations and followup on Unit 1 findings. This review | |||
indicated that proper corrective actions were taken on the , | |||
, findings and special evaluations covered in this section, j | |||
t | |||
j (6) Section 6 - Program Assessment. This section covered the ! | |||
l program developed and actions performed to ascertain whether the | |||
1 design and construction activities related to coatings for 1 | |||
; Unit 2 have been adequately controlled to implement licensing | |||
; commitments, to ascertain whether the corrective actions : | |||
! | |||
resulting from the Unit 1 Readiness Review were applied to | |||
Unit 2, and to verify that the results of design and l | |||
' | |||
construction activities conform to project procedures and design ! | |||
requirements. | |||
i | |||
The atove assessments resulted in six findings. Five were classified | |||
. as level II and one as a level III. Each of the findings identified . | |||
were evaluated to detemine the extent of the deficiency, the root I | |||
cause of the finding and the impact on hardware or documentation. | |||
Four of the six findings reported involved contractor procedure | |||
deficiencies. In each of the four cases, investigations showed that I | |||
the intent of the requirements addressed in the procedure had been | |||
j met. The investigation also showed the deficiencies to be limited to | |||
j the item or procedure in the finding. One of the remaining two | |||
; findings was an isolated case of conflict in a purchase specification | |||
4 | |||
and the other finding was due to repetitive errors in processing Field | |||
i | |||
. -_ - . . - - - - - _ - - - . - _ - . - . .- | |||
1 | |||
. ; | |||
! | |||
16 | |||
i | |||
i | |||
Change Requests. The investigation of the FCR deficiencies sh(wed them ! | |||
to be limited to the coating specification. l | |||
l | |||
None of the findings reported deficiencies in applied coatings of l | |||
inspection documentation. None of the remedial actions involved ! | |||
applied coatings. | |||
Review of the findings by the inspector indicated that the findings ! | |||
were isolated cases of failure to comply with engineering or [ | |||
Inspection of coatings by | |||
' | |||
licensing requirements or with procedures. | |||
the inspector indicated that these findings had no effect on applied r | |||
coatings. , | |||
1 | |||
b. General Conclusions | |||
' | |||
This module presents an adequate assessment of the Georgia Power | |||
Company (GPC) process for design and construction of coatings. l | |||
During this review, ft was apparent to the NRC inspector that GPC | |||
management supported the program by their active participation in the * | |||
development of the program. Review and evaluation of Module 13B , | |||
' | |||
Unit 2 by the NRC inspector indicates that the review performed by | |||
GPC Readiness Review staff was sufficiently comprehensive in scope ' | |||
and depth to identify problem areas and that the dispositions of i | |||
Readiness Review findings were proper and satisfactory. The , | |||
procedures for design construction, and quality control were ! | |||
consistent with commitments and, are therefore acceptable. Based on ! | |||
the review of this module and the results of previous NRC | |||
inspections, the inspector concluded that coating activities were | |||
performed in accordance with the appropriate procedures and that | |||
records reflect quality of the coatings. The inspector concluded , | |||
that the Vogtle program for the design and construction of Category 1 : | |||
coatings complies with the Final Safety Analysis Report and that l | |||
compliance is verifiable with existing documentation. i | |||
f | |||
The NRC inspector furthermore believes that Module 13B accurately ! | |||
assess the status of design and construction activities for i | |||
Category 1 coatings. This conclusion is based on information ) | |||
currently available to the NRC hspector. Should information I | |||
subsequently become available which was not considered during this ' | |||
review and which conflicts with earlier information it will be | |||
evaluated to determine what effect it may have on the above | |||
conclusion. | |||
6. Exit Interview | |||
The inspection scope and results were summarized on August 19, 1988, | |||
with those persons indicated in Paragraph 1. The inspector described | |||
the areas inspected and discussed in detail the inspection results. | |||
Dissenting coments were not received from the licensee. The licensee | |||
did not identify as proprietary any of the materials provided to or | |||
reviewed by the inspector during this inspection. | |||
i | |||
- - _ - _ __ _-- _-_ | |||
}} |
Latest revision as of 17:10, 17 December 2020
ML20155E972 | |
Person / Time | |
---|---|
Site: | Vogtle ![]() |
Issue date: | 09/27/1988 |
From: | Conlon T, Harris J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | |
Shared Package | |
ML20155E964 | List: |
References | |
50-425-88-47, NUDOCS 8810130078 | |
Download: ML20155E972 (17) | |
See also: IR 05000425/1988047
Text
.
s@ Clov
4' ' UNITED STATES
{o j NUCLEAR REGULATORY COMMISSION
! REGION ll
oE 101 MARIETTA ST N.W.
e,,,,' ATLANTA. GEORGIA 30323
Report No.: 50-425/88-47
Licensee: Georgia Power Company
P. O. Box 4545
Atlanta, GA 30302
Docket No.: 50-425 License No.: CPPR-109
Facility Name: Vogtle 2 Module No. 13 8 Coatings
Inspection Conducted: August 8-12 and August 15-19, 1988
Inspector: /e* W r- "L 9 " '4 7 ' 6'?
J. R. Harris ' Date Signed
Approved by: g/77 f- 6/- 2 7 - fY
T. E. Conlon, Chief Date Signed
Plant Systems Section
Engineering Branch
Division of Reactor Safety
SUMMARY
Scope: This evaluation was perfonned for one of eleven Readiness Review
modules produced as part of a pilot Readiness Review Program being
operated by the licensee pursuant to a recommendation contained in
NUREG 1055. The NRC agreed to participate in the program by
reviewing and commenting on each module.
This evaluation was performed by reviewing the module report,
examining supporting documentation and inspecting associated work
activities. The licensee's review was verified by interviewing
licensee personnel associated with preparing the module, sampling
documentation and hardware examined by the licensee's reviewers and
by sampling documentation and hardware not selected by the licensee's
reviewers and by reviewing records of previous NRC inspections.
Resul ts: In the areas inspected, violations or deviations were not identified.
8010130070 G80920
gDR ADOCK 05000425
PNV
- . . - - - - - - - - .-
,
.
.
,
.
L
REPORT DETAILS !
. l
!
1. Persons Contacted ,
Licensee Employees
- J. A. Bailey, Project Licensing Manager ;
J. H. Draggs, GPC Quality Assurance '
,
- E. D. Groover, QA Site Manager - Construction
D. A. Lunsford, GPC Quality Assurance
R. McManus, Manager Readiness Review
,
Other licensee employees contacted during this inspection included
J craftsmen, engineers, operators, technicians, and administrative ;
'
personnel.
'
l Other Organizations ,
- R. R. Thomas, Readiness Review Team Leader, Bechtel Corporation :
2
D. Wiggins, Williams QC Inspector ;
,
NRC Resident Inspector
R. Scheppens, Senior Resident Inspector, Construction l
- Attended exit interview
2. Module 13B Coatings Unit 2
. a. Unit 2 Review ,
i i
The Unit 2 Headiness Review program is being conducted at the !
'
initiative of Georgia Power Company's (GPC's) management to assure
that all design, construction and preoperational testing have been
- properly implemented at the Vogtle Electric Generating Plant Unit 2. l
Module 138 presents an assessment of the design and construction l
l activities associated with protective coatings for Unit 2. This l
evaluation was conducted to determine if the results of the program a
review for coatings presented in this module are an ef fective and
accurate assessment of design and construction requirements, that
these requirements are being properly implemented, and that the
resolution of findings identified in the module were correct and that
- the corrections were made,
b. NRC Review Objective
l
j The objective of this review and inspection was to evaluate the i
,
licensee's VEGP Unit 2 Readiness Review of Coatings. '
1
.
i
j
_ _ ___ - _ _ _ _ _ __--_ _ _ _ _ ._ _.__ _.-____ ___ ___-__'
. . . -. ___ - -
,
.
-
.
,
2
,
t
This evaluation was accomplished through a detailed review of all
sections of the module by:
- Verifying that the design and construction commitments listed in
the module are correct anci comply with FSAR commitments and
regulatory requirements
- Reviewing module findings and evaluating the correctness of -
their resolution i
- Review of a comprehensive representative sample of the records
reviewed by the Readiness Review Staff and an independent sample
l of documents
- Walkdown observation of construction activities
) c. Scope of Review
This review which consisted of an examination of each section of the
module was performed by an inspector from the Region II office in
- Atlanta. Module Sections 1.0, 2.0, 4.0 and 8.0 which contain
! information concerning the Module Introduction, Company Organization, ,
Program Description, Assessment of Module Adequacy and Assessment ;
4 Plans and Checklists did not require as detailed a review or
evaluation as the remaining sections. The more significant aspects :
of the module appear in Sections 3.0, 5.0, and 6.0. These sections ,
discuss Licensee Comitments, Audits, Reportable Deficiencies, '
Special Evaluations, and Methods of Design and Construction
4 Activities related to coatings for Vogtle Electric Generating *
'
d
Plant 2. Review of these sections included a detailed review of the
content, examination of items identified as findings, an examination i'
of a sample of records reviewed by the Readiness Review Staff and an
examination of an independently selected sample of records. [
- d. Inspection
- The review and evaluation by the Region !! inspector was accomplished
j by reviewing the module :n its entirety in the Atlanta Regional ,
Office beginning on Augus: 11, 1988, and by inspection at the Vogtle '
site on August 15-19, 1988.
'
! Section 1.0, Introduction, which presents an introduction to the
intent and content of the module and Section 2.0 organization and
-
Division of Responsibility, which presents a description for design
and application of coatings were reviewed for general content and
background data.
i Review of Section 3.0, Comitments, was accomplished by examining the
j Comitment and Implementation matrices and verifying that the
applicable comitments were implemented. Verification that the
i
applicable commitments, were referenced and implemented was
f
j
.
_ . _
,
.
'
-
.
,
3 l
accomplished by reviewing the FSAR, SER, Specifications, procedures,
regulatory guides, applicable industry standards and responses to NRC
generic letters. ;
t
! Review of Section 4.0, Program Description, was accomplished by i
examining the two subsections and comparing the described work l
process used by design and construction with FSAR, specification and
procedure requirements. The inspector also compared the described !
work process with the understanding of program requirements that were
examined during inspection of coatings conducted during the review of t
this module. 7
.
Review of Section 5.0, Audits, Nuclear Regulatory Inspections and -
Special Evcluations, was accomplished by examining the four sub- ,
sections, and reviewing the audits, NRC inspections and special :
evaluations and findings identified during the audit review. l
l
Review of Section 6.0, Program Assessment, was accomplished by ;
2 reviewing Subsection 6.4.1, Commitment Implementation, and Unit 1 !
followup, Subsection 6.4.2. In process Activities of ongoing design :
, and construction activities, and Subsection 6.4.3, Construction !
'
Completion Process. Review of Subsection 6.4.1 included a review of i
, design commitments, construction commitments, and corrective actions !
,
taken to prevent recurrence in Unit 2 of the types of problems !
j identified by the Readinesc Review during the Unit 1 assessment.
Three findings were identified by the Readiness Review Staff which
involved concerns with warehouse records not maintained by the
contractor, conflicting coating requirements in purchase specifica- !
tion and contract procedure did not meet specification requirements. l
Review of Subsection 6.4.2 included examination of ongoing design and .
! construction processes. !
l
Three findings were identified by the Readiness Review Staff which
involved errors in processing FCRs, contractor procedures which cite
'
conflicts in contract procedure for deviation reporting. Review of
Subsection 6.4.3 construction completion process included a review of
applied coatings, quality documentation, material traceability,
inspector qualification and painter certification.
Review of Section 7.0 covered assessment module adequacy and proposed
corrective action taken for findings.
j Review of Section 8.0 covered assessment plan and checklists proposed i
"
for evaluating Unit 2 design and construction activities associated
! with protective coatings.
!
.
'
l
l
l
- _ . - . . - - - . . - - - _ - _ - - - . . , - . - . _ - - _ - - . .
- - . --, D
.
'
.
4
3. Evaluations
The evaluation of each section reviewed is prov!ded below. For each
section a description of the section that was reviewed and the basis of
- acceptance is provided.
a. Section 1.0 - Introduction
This section of the module presented an introdu; tion to the intent
and content of the module organization. This section was reviewed
primarily for content and background information. No additional
followup or evaluation of the section was required.
b. Section 2.0 - Organization
This section presents a description of the organization and division
of responsibility of GPC, bechtel Western Power Company, Williams
Pnwer Services. Inc. for design and construction activities related
to coatings. This section of the module was reviewed for content
only. No additional followup or evaluation of this section was '
required.
c. Section 3.0 - Commitments
(1) This section contains a listing of commitments and implementing
documents which are presented in two matrices. The first matrix
is the commitment matrix which contains a listing of the sources
and subject of licensee commitments. Commitments listed in this
matrix were identified by the Readiness Review Staff through a
review of the FSAR and 6esponie to NRC questions. The second
matrix is the implementation matrix which contains a listing of
documents and features discussed in the FSAR and implementing
documents. The Readiness Review Staff reviewed these documents
to verify compliance with the commitment requirements.
(2) The Region II inspectors review and evaluation of this section
was lerformed by comparing the licensing commitments and
corresponding source documents with the Standard Review Plan,
the NRC Regulatory Guides (RGs), the provisions of Industry Standards
and the FSAR. The review also included an examination of
commitment sources and implementing procedures and specifica-
tions to verify that the FSAR commitments were being properly
implemented in the Readiness Review Program.
(3) Review of this section showed that the Vogtle licensing commit-
ments and implementing documents for the protective coating
systems comply with the requirements of the FSAR Regulatory
Guides and Industry Standards.
__ - - . . _ _ _ _ _ . _ _ _ -
__
,
-
.
,
!
5
d. Section 4.0 - Program Description
(1) This section of the module, is divided into two subsections
which describes the work process utilized by design and
construction for coatings at Vogtle Unit 2. Subsection 4.1
provides a description of the work flow, documentation and
design control activities for protective coatings for permanent
plant systems. The emphasis is on coating materials and
approved coating systems for areas and equipment inside the
containment building. The architectural group of the Materials
and Quality Services Group of Bechtel, selected coating systems
to meet the requirements of the service areas, the surfare to be
coated and the architectural and special service conditions as
applicable. This subject addresses Design Basis Accident Tests
(DBA), field coating systems, shop coatings, unqualified
coatings, specification development, material specifications,
field coating specification drawings, shop coating program,
quality requirements and the Westinghouse coating program.
Subsection 4.2 construction contains a description of coatings
and inspection activities, a flow chart and a list of codes and
standards applicable to receipt, storage, application and
inspection activities.
(2) Review of this section indicated that the program described in
the subsections is in accordance with the NRC inspector's
understanding of the work processes used by design and
construction for coatings at the Vogtle Plant.
e. Section 5.0 - Audits and Inspections
(1) This section contains a discussion of Quality Assurance Audits,
Nuclear Regulatory Comission inspections and project
reportability evaluations performed in the area of coatings. In
addition a description of special evaluations and a discussion
of the project evaluation of Unit 1 findings are included. The
findings, violations and evaluations applicable to coatings for
Unit 2 were reviewed by the Readiness Review Staff and factored
into the assessment presented in Section 6 of this module.
(2) Review of this section by the inspector included a review of the
four subsections. Review of the referenced audits and review of
the most recent audits conducted by GPC and the Williams
Corporation QA verified that the audits were being conducted within
the correct time and that proper corrective actions were taken
on Audit Findings. Review of the special evaluation concerning
the effect of the inorganic zine lining of the diesel fuel oil
storage on the operability of the diesel generators included
review of the NRC staff response to this item dated Octcber 15,
1987. This response included the NRC staff review of the
licensee's submittals dated July 13, September 30, and October
..
l
-
1 .
6 !
l
i 1987. Based on the "eview of these submittals, the NRC staff
' concluded that the zinc coating in the diesel generator fuel i
oil storage tanks will not affect the operability and reliability i
of the diesel generators. Review of the special evaluation
concerning cracking of concrete floor coatings in the Unit 1
,
- containment indicated that the most probable cause was a high !
film thickness in local areas coupled with mechanical damage to i
the coatings. This was based on the fact that samples of the ;
) cracked coatings exhibited high filler body coating thickness. !
Recommendations to prevent cracking of coatings included use of
a rubber float, minimal use of needle guns, inspection of coated r
,
concrete floors for mechanical damage prior to application,
1 and areas adjacent to damaged areas to be protected or prepared
'
to prevent excessive thickness.
The review also covered a review of the findings identified ,
during the Readiness Review of Coatings in Unit 1. The -
i Readiness Review Staff reviewed these findings to verify that l
- proper corrective ac
- ions were taken and to determine if they ,
i
were applicable to Unit 2. This assessment identified two !
'
findings where corrective actions were not entirely effective.
These were identified as Findings 2RRF-13B-002, Errors in
Processing FCRS and Finding 2RRF-138-003, Required Warehouse
i Records Not Maintained by the Contractor. Section 6.0 contains
a more detailed discussion of these findings.
f. Section 6.0 Program Assessment
The assessment was performed to provide added assurance that the l
project continued to comply with licensing commitments. The
3
assessment was organized into the following three parts; Part 1, ,
'
Comitment Implementation and Unit i finding followup; Part 2, Design '
and Construction program activities; and Part 3, Design and r
Construction completion. !
The objective of Part 1 of the assessment was to assess implementa- I
tion of licensing commitments with emphasis on those revised or added i
J
since Unit 1 Readiness Review by Final Safety Analysis Report l
,
amendments or project letters and to assess the adequacy of i
application to Unit 2 of corrective actions resulting from Unit 1 '
i Readiness Review.
During the review of comitment implementation which covered Design
- and Construction Requirement and Unit 1 finding followup, several .
'
findings were identified. These were: Finding 2RRF-138-004,
! Conflicting Coating requirements in Specification X4A J16; -
Finding 2RR F-13B003, No Contractor Procedure for receipt and
l
, issuance of each batch of coating materials; Finding 2RRF-138-005,
I Contractors general procedure for control of application procedures ;
I allowed exception to the commitment of RG 1.54 which requires that ;
i
_ __
,
.
-
. ,
7
application procedures conform with the coating manufactures written
instructions , .
Unit 1 findings were evaluated for continued application of
corrective actions to Unit 2 activities and the Unit 2 assessment
results were reviewed for repetition of Unit 1 findings. For 14 of
the unit findings the corrective action was found to be effective. 3
The corrective action for one Unit 1 finding to establish a >
procedural requirement to maintain a warehouse record was found to be [
not fully effective as described in the discussion of Unit 2 Finding !
2RRF-138-003. Another element of the finding in Unit 1 was found to
be repeated in Unit 2. This identified that FCRs were making generic j
changes to the coating specification, but FCRs were identified as not !
requiring incorporation in the specification. This was identified as !
Finding 2RRF-138-002 which is discussed in Part 2, In Process ;
Activities. l
t
The objective of Part 2 of the assessment was to examine ongoing i
design and construction processes. The design portion of Part 2 [
covered the evaluation of 13 Field Change Requests (FCRs). This ;
review identified repetitive failure to properly Identify and process t
changes affecting project Class 02c Coatings (Coatings Inside i
Containment). Field Change Requests inside containment were !
improperly identified as project class 62C and were not sent to l
Quality Assurance (QA) for review. In addition FCRs properly !
identified as Class 02c were not sent to Quality Assurance for review !
as required by procedure. This was identified as Finding
l
2RRF-138-002, Errors in Processing FCRs. t
,
The construction portion of Part 2 of the assessment examined in
process coating application, coating material storage and deviation (
reports. in process application activities were assessed by i
observing preparation, inspection and application activities in the i
field. Attributes assessed included proper environmental testing, j
surface preparation and inspection, documenting and mixing of i
materials and application of coatings. Material storage areas were i
also examined for compliance to procedural requirements. Attributes t
assessed included temperature control, area cleanliness and material l
identification. Review of deviation reports covered the contractor's ,
deviation report procedures and a samole of deviation reports. The l
deviation reports were assessed for compliance to project require- '
ments. The reports were reviewed for adequate description. I
appropriate disposition, proper justification and required approvals. !
Review of the deviation report procedure identified a deficiency in j
procedural requirements for deviation tracking and conflicts. This ,
was identified as Finding 2RRF-138-008 Conflicts in Contractor l
Procedure for Deviation Reporting. Review of the two contractor
control procedures indicated that they both referenced an incorrect ;
revision of ANS! N45.2.9. This was identified as Finding l'
2RRF-138-006 Contractor Procedures Cite Different Revision of
Standard than Contractor QA Manual and FSAR. ;
1
l
1
i
!
- - - - - -
.
.
.
,
!
8
h
' i
The objective of Part 3 of the assessment was to evaluate the
construction completion process. This covered applied coatings,
qu4ity documentation, material traceability, inspector qualification
and painter certification, ,
i
!
Review of Section 6.0 by the Region II inspector included a review of (
'
the three activities addressed in the assessment plan. Thic included !
'
) a review of licensing connitment requirements, and Unit 1 finding
q
followup, design and construction program activities and design and
i
construction completion, and review of findings and corrective l
'
actions taken to resolve the findings. This included a review of (
procedura, FSAR requirements, Field Change Requests (FCRs), Work
'
'
}
i Requests (WRs), training and certification of inspectors and
i
painters, Deviation Reports (DRs), storage controls, and a walkdown
j and inspection of ongoing coating work in the Unit 2 containment. r
- Review of the findings identified by the Readiness Review Staff and
i the corrective actions associated with the findings are as follows:
!
j (1) Finding 2RRF-138-000, Errors in Processing FCRs
i Project Reference Manual Section 17 states in part the
j following:
~
- 17.5.2.a - After review and dispositf on by Engineering if a
design change is needed in the affected documents, an x is l
! placed in block 2 and/or 6 of the Field Change Request l
j (FCR) form
l - Construction specification change notices (CSCNs) and l
- mechanical specification change notices are incorporated in :
accordance with part C, Section 2a
l - 17.5.3 - Justification con::arrence shall be provided on the !
j FCR prior to approval of Block 1b l
-
i
- 17.6.2.5 - FCRs initiated for specifications that are Q
l class fire protection or radwaste shall be forwarded to l
l Quality Assurance (QA) for their concurrence prior to l
l submitting the originals to Georgia Power Company.
I
i Contrary to the above, of a sample of 13 FCRs reviewed for
i Readiness Review Module 138 coatings, the following
l discrepancies were noted which were written against
j Specification X1AJ07
i
!
- C-FCRB-22524 - Generic Change identified as NA/NA missing QA
! review
1
j - C-FCRB-21176 - Missing QA review, incorrect project class
- C-FCRB-21175 - Missing QA review, incorrect project class
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ .
.
.
.
9
- C-FCRB-19820 - Generic change identified as NA/NA missing QA
review and justification
- C-FCRB-20176 - Missing QA review, incorrect incorporation
- C-FCRB-19891 - Missing QA review
The root cause of this finding was that personnel processing
FCRs had an inadequate understanding of the coating project
class designation and the QA review requirement associated with
the coating 02c class.
Remedial action included correction to the FCRs and
Specification X1AJ07 was revised May 12, 1988. This revision
corrected the revision block to indicate that the FCR was
modified. Action to prevent recurrence included training of
appropriate architectural personnel re the coating
project classification (02c versus 062c)garding
- the need for QA review
of FCRs with the project class 02c, and identification of
generic changes requiring incorporation into the specification.
In following upon this finding the inspector reviewed the FCR
identified as having error and verified tFat proper corrective
actions were taken and also reviewed 13 additional FCRs to
verify that similar problems did not exist in other FCRs. The
inspector also verified that proper revisions were made to
specification X1AJ07 and that the proper training had been given
to appropriate t .chitectural personnel.
(2) Finding 2RRF-138-003 - Required Warehouse Record Not Maintained
by Contractor
Specification X1AJ07, paragraph 12.1.1A. 12.7.1 and 12.7.2
require that the documentation requirements of ANSI N 101.4 be
i
met and allow alternate forms providing the same degree of
documentation to be used. Example 3 of the Quality Document '
Foms Attachment to Specification X1AJ07 is a warehousing record
documenting the receipt and withdrawal of coating materials for
each batch of coating material received.
Contrary to the above no procedure was found prescribing
preparation and turnover of the warehousing record.
Remedial action included revision of Procedure WC-015-253
Warehouse Coating Records to address the upkeep and turnover of
the warehousing records. In addition the existing warehousing
records have been reviewed by the Williams Quality Control
Ocpartment. The review found thai records were missing for the
- period of September 9.1986 to December 10, 1986. The missing
records were addressed in Deviation Report WC-88-0^3 dated
May 26, 1988. The approved disposition was hardware not
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
. _ _ . _._ __ _ .- _ _ _ __ .. - _ _
,
\
.
- ;
,
10
a f fected. The Williams Quality Assurance / Quality Control
(QA/QC) Site Manager concluded after completing the review, ,
that the existing warehouse records are acceptable as quality l
documents, i
The new QC procedure has been approved by GPC Qua11tv tontrol
and is controlled by the Williams QC Department thro p Document i
Control Procedures WC-003 and WC-019. Williams Q M ity Control !
will monitor the warehousing records closely to assure i
compliance. In following up on this item the HRC inspector l
!
reviewed the referenced procedures and current warehouse records
and verified that ANSI N101.4 and specification X1AJ07
requirements were being met.
I
!
(3) Finding ARRF-13B-004, Conflicting Coating Requirements in
Purchase Specifications.
Design Criteria DC-1000A, Section 10, requires that coatings !
inside the containment meet the requirements of ANSI N101.2. j
i
Specification X4AJ16 (Containment Cooling Units), Revision 10, l
dated December 10, 1986, Paragraph 6.3.1 requires that coatings l
be certified to ANSI N101.2. Paragraph 6.3. A requires an j
inorganic Zine primer followed by an epoxy topcoat and also l
lists acceptable suppliers and products. j
f
The Ameron and Carboline inorganic Zinc primers listed are not j
their N101.2 qualified products. The products listed are all !
inorganic Zinc primers. No epoxy topcoat is listed. This i
finding identifies conflicting requirements within Specification i
X4AJ16. Paragraph 6.3.2a of the specification requires !
documentation in accordance with ANSI N101.4 ar.d Regulatory
Guide 1.54. In the same specification Paragraph 6.3.A.4
requires specific name brand coatings which will not meet these
documentation requirements and makes no allowance for acceptable
al+ernatives. I
To detemine the extent of this problem with conflicting ;
requirements, a sample of 8 out of approximately 40 specifica- l
tions requiring the ANSI N101.4 and N101.2 documentation was
reviewed. These Specifications were X2AG03, X.!AGOS, X2AG06,
X2AG07, X2AG08, X2AH01, X2AH02 and X2AP01-C9.1. No confifcts or
discrepancies between the approved coating lists and
documentation requirements were identified. The purchase order
document PAY 2-86 was reviewed to determine the quality of paint
actually supplied for items in Specification X4AJ16. The Supplier
Quality Verification Document List - Detailed documents that the
paint meets the requirements of Paragraph 6.3.1.2.a of X4AJ16.
Also the product identity and Quality Assurance certification
record certifies that the paint meets the manufacturing require-
ments of ANS! N101.2, ANSI N101.4 and ANSI N5.12 when properly
mixed. Documentation that the paint was properly mixed and
l
.
__ , ._ . - -
.
.
i 11
I
i
applied was also provided. These documents p avide objectivt
evidence that the paint meets the more stringent requirements
of Paragraph 6.3.1.2a of X4AJ16 and that the conflict in the
specification did not degrade the paint quality. The root cause
of the finding was attributed to human error. The specification
writer did not realize that the paint specification contained
conflicting requirements and that the review process failai to
uncover the mistake. Specification X4AJ16 was revised June 8,
1988, to delete Paragraph 6.3.A.4. This will eliminate the
conflict between documentation requirements arid avoid the
procurement of unqualified toatings. This will assure that
future materials procured under X4AJ16 will meet the require-
ments of Paragraph 6.3.1.2.a. During this inspection, the NRC
tr.spector reviewed the revision to Specification X4AJ16 and nine
other specifications to verify that similar errors were not in ,
the specifications.
(4) Finding 2RRF-13B-00-5, Contractor Procedure Does Not Meet
Specification and FSAR Requirements
Final Safety Analysis Report (FSAR) Section 6.1.2.1,
Specification X1AJ07 Section 12.5.1 and Williams QA Manual ;
Section 5.4.4 and job specific addendum Section 5.4.1 require
, written approval of the manufacturers application procedures. 3
l This finding identified that Williams Procedure WC-300,
i Sections 300.4.1.4 and 300.7 allow exceptions to these i
l rmai rements .
l In following up on this finding Williams QC reviewed all i
,
applicat'on procedures and found options or exceptions stated or
'
implied in Sections 300.2.2, 300.2.3, 300.4.1.4 and 300.7 of
i Procedure 9C-300.
The cause of this error was due to an effort by Williams !
Management to provide changes based on oral concurrence prior to
receiving written aporoval from the coating manufacturer. To
prevent recurrence of this item the Williams QA/QC manager vill ,
ensure that the written approval from the coatir.g manufacturers
~
is obtained prior to implementation.
Investigation of this item by the NRC inspector showed that in 7
no instance had procedures been issued without the oral approval
,
of the manufacturer. All procedures have been submitted to the
manufacturer and have been approved in writing. No coatings
have been unacceptably applied as a consequence of this ;
discrepancy.
'
i
'
(5) Finding 2RRF-138-006, Contractor P ccedures Cite Different
Revision of Standard Than the Contractar QA Manual and FSAR.
'
- . . . - _. .- . _ - _ - _
.. -. ._ -_ . . _ . _ _
._ , - . - - _ - - __ _ -- _. _- -
-
.
- -
-
.
)
j 12
,
4
FSAR Section 17.1.2 and Williams QA Manual job specific
j addendum, Section 5.10 require confonnance to ANSI N45.2.9-1973 -
eleventh draft. Williams procedure WC-003, "Document Security"
and Procedure WC-019, Controlled Document Revision and
Distribution reference ANSI N45.2.9-1974. i
l
i
The cause of the finding was that no reference i.e the QA ~
i procedures manual would lead the user to the job specific
i addendum of the QA manual as the source of the correct edition
, of referenced standards. Williams QA/QC site manager checked
I the QA procedures to verify that other standards referenced are
the edition stated in the job specific addendum of the QA
manual. All were found to be the edition stated in the job
i specific addendum. Williams revised Procedure WC-003 and WC-019
i to reference ANSI N45.2.9-1973, eleventh draft. These revisions k
) were completed April 19, 1988. To prevent recurrence of this !
!
error Williams QA/QC site manager will ensure tnat all future !
) procedure have i.he correct standards referenced.
4
l The NRC inspector reviewed the corrective actions taken on this i
j finding. Review of the 1973 eleventh draft and 1974 revision of :
ANSI N45.2.9 showed that there were no changes that would have !
l
- adversely affected the quality of Williams documentation. The j
j inspector also checked the Williams QA manual for correct :
i revisions of referenced standards to further evaluate the ;
j broadness of this finding. No further discrepancies were found. [
.
.
1 (6) Finding 2RRF-138-008 Conflict In Contractor Procedure for !
- Deviation Reporting [
l Vogtle Electric Generating Plant QA manual Section 15.2 states:
d
i
j - The identification, documentation segregation, review,
i
- disposition and notification of affected organization of i
'
nonconformance of materials, parts, components or services !
is controlled. ;
I
. - Nonconformances concerning departures from design i
l specification and drawing requirements which are [
t dispositioned "use as is" or "repair" are dispositioned !
j by the responsible engineering organization. [
i i
This finding identified two discrepancies
I
j - Williams Procedure WC-008 contains no provisiv of tracking i
j reworkable deficiencies defined in Secti" 18.5.1.2. !
Requirements for identifying non-reworkah s :ficiencies i
are conflicting (Sections 008.5.1.3 and 0 0 2.1). !
l'
- Provisions of Williams Procedure WC-008 for approval of
l
"use as is" or "repair" dispositions are conflicting and ,
! I
! l
T
.
.
1
1
13
.
l
'
I
do not identify project engineering as the responsible
engineering organization (Sections 008.5.2.4, 008.5.7.2,
008.6.3.2.1, 008.6.323 and 008.6.3.26).
Investigative action of the first discrepancy confirmed that the
original intent of procedure WC-008 Section 008.5.1.3 was to
cddress the tracking of rejected items which were reworkable. A
typographical error was made and Section 008.5.1.3 in
advertently stated "rejected items which are not reworkable."
Section 008.5.1.3 also addresses an open item 100 Williams QC
l stopped using the log in May of 1986. At that time the
responsibility for keeping the log was moved from the QC clerk
to the QC inspectors. The investigation found that the Williams
QC inspectors failed to use the log and that Williams QC management
l
falled to ensure that the inspectors used the log. The purpose
l
for the open item log was to track reworkable items. Prior to
1 May 1986, the log documented and verified that reworkable items
'
were handled in a timely manner. Williams QC replaced the open
item log with a designated hold file. Willaims QC management
failed to make the appropriate change in procedure WC-008 to
reflect the new method of tocking.
Williams QA/QC management reviewed all reworkable rejected items
reported between May 1986 and April 6,1988. There were 568
l
reworkable, rejected items reported during this period. A random
- sampling of 72 of the 568 items were reviewed and it was determined
that 50 were reworked within four days, two within seven days and
20, all of which were on one inspection report, were not reworked
for four months. Although the open item log had not been used
I since May 1986, these 20 rejects were recorded in May 1987 but
were never placed on a Deviation Report. The inspection report
was placed in the designated hold file until it was reworked. l
The Williams QC site manager did not write a Deviation Report i
because the delay was caused by construction restraints which did
not allow the workers back into the area for rework. Williams I
management concluded from this review that items were reworked
in a timely manner except as constrained by other construction
activity. As of April 6, 1988, there were no outstanding
reworkable rejected items in tha designated hold file. The root
cause of this finding was attributed to inappropriate attention
level of Williams QC management.
Investigation of the second part of this finding established
that Section 008.6.3.23 had three editorial errors. The words
"recomended dispositions" are used twice in this section. The i
correct words should be "approved dispositions." The third l
error had the "owner or designee" approving what should have
been the approved disposition. The design engineering group
should approve the approved disposition. The root cause of the
l
l
,
_. . ._. ..
. - . - - _ . __
. - - . .
_-
.,. .. . --- - . . - . - - - . . - .- .. _
< .
-
.
,
i 14 >
.
error was inadequate review of the final printed text prior to
final approval. :
i
The following corrective actions were taken to correct these i
findings. Williams revised Procedure WC-008 Section 008.5.1.3 i
to direct any inspection reports which identify reworkable
deviations to be placed in a designated hold file until the ,
areas have been reworked. This file will be reviewed monthly by t
the QA/QC site manager. Any item over 60 days old shall be
,
i
- ;
! reported as a deviation report. The inspection report shall remain
in the hold file until it has been closed by the approved ;
4 disposition on the deviation report. Deviation Report WC-88-002 i
a
has been written to resolve the procedure violation cited and it .
j has been dispositioned "hardware not af fected. " The
t
i typographical error in Section 008.5.1.3 has been corrected. !
Williams has also revised procedure Section WC-008,
!l Section 008.6.3.23 to state "approved dispositions" instead of
"recommended dispositions" and "design engineering group"
instead of "owner designee."
To prevent recurrence of this finding, Williams QA/QC reviewed
- their Quality Control procedures and determined that the QC i
- Manager reviews deviation report trends and rejected open items
1 on a monthly basis. No other monthly review requirements were ,
j found. The trend review (Form WC-0080) is in place and a
j checklist for the monthly review of rejected open items (Form
WC-008E) has been added to the nonconfonnance control procedure.
1
! During this in3pection, the NRC inspector reviewed the changes
made to the procedures and reviewed current deviation reports. !
! This review indicated that appropriate corrective actions have l
'
l
been taken on this finding.
4. Findings
l No NRC findings were identified during the review of Module 138 Unit 2.
Review of this Module showed that the Readiness Review Staff did a
comprehensive review of design and construction activities for ssfety-
i related coatings and that significant findings were identified by the
- Readiness Review Staff. This resulted in significant corrections in the
i program that clarified inspectica requirements, documentation requirements
,
and inspection activities.
5. Conclusions
Based upon the review within the scope of Module 138, Coatings the NRC has
reached the following conclusions for coatings for Vogtle Unit 2.
i
4
)
_ _ _
_ _- . . _ _ _ _ _ -~ - ._. . . _ _ _ __ __ _ - _ _
,
-
.
15
a. Summary of Specific Conclusions , ,
The module has been determined to be acceptable. A summary of the ,
report comments for each module section is as fo' lows: >
(1) Section 1 - Introduction. The module organization and project .
status were correct as of the date of the module publication. l
7
- (2) Section 2 - Organization and Division of Responsibilities. The
organization and responsibilities presented in Section 2 of the
< Module were reviewed and verified as being correct. ;
(3) Section 3 , Commitments. Review of the commitments as listed in "
'
Section 3 of the module indicated that licensing commitments and
implementing documents comply with the FSAR, Regulatory Guides
,
and Industry Standards. l
(4) Section 4 - Program Description. The inspector reviewed the
description of the program as given in Section 4 of the module.
This included a review of the referenced design and construction
controls for coatings. Review of this section indicated that
' the description cf controls of coatings presented in Section 4 '
are correct and is in agreement with the FSAR and project <
i requirements.
i (5) Section 5 - Audits and Inspections. Review of this section
l included a review of audits, NRC inspections, special
) evaluations and followup on Unit 1 findings. This review
indicated that proper corrective actions were taken on the ,
, findings and special evaluations covered in this section, j
t
j (6) Section 6 - Program Assessment. This section covered the !
l program developed and actions performed to ascertain whether the
1 design and construction activities related to coatings for 1
- Unit 2 have been adequately controlled to implement licensing
- commitments, to ascertain whether the corrective actions
!
resulting from the Unit 1 Readiness Review were applied to
Unit 2, and to verify that the results of design and l
'
construction activities conform to project procedures and design !
requirements.
i
The atove assessments resulted in six findings. Five were classified
. as level II and one as a level III. Each of the findings identified .
were evaluated to detemine the extent of the deficiency, the root I
cause of the finding and the impact on hardware or documentation.
Four of the six findings reported involved contractor procedure
deficiencies. In each of the four cases, investigations showed that I
the intent of the requirements addressed in the procedure had been
j met. The investigation also showed the deficiencies to be limited to
j the item or procedure in the finding. One of the remaining two
- findings was an isolated case of conflict in a purchase specification
4
and the other finding was due to repetitive errors in processing Field
i
. -_ - . . - - - - - _ - - - . - _ - . - . .-
1
. ;
!
16
i
i
Change Requests. The investigation of the FCR deficiencies sh(wed them !
to be limited to the coating specification. l
l
None of the findings reported deficiencies in applied coatings of l
inspection documentation. None of the remedial actions involved !
applied coatings.
Review of the findings by the inspector indicated that the findings !
were isolated cases of failure to comply with engineering or [
Inspection of coatings by
'
licensing requirements or with procedures.
the inspector indicated that these findings had no effect on applied r
coatings. ,
1
b. General Conclusions
'
This module presents an adequate assessment of the Georgia Power
Company (GPC) process for design and construction of coatings. l
During this review, ft was apparent to the NRC inspector that GPC
management supported the program by their active participation in the *
development of the program. Review and evaluation of Module 13B ,
'
Unit 2 by the NRC inspector indicates that the review performed by
GPC Readiness Review staff was sufficiently comprehensive in scope '
and depth to identify problem areas and that the dispositions of i
Readiness Review findings were proper and satisfactory. The ,
procedures for design construction, and quality control were !
consistent with commitments and, are therefore acceptable. Based on !
the review of this module and the results of previous NRC
inspections, the inspector concluded that coating activities were
performed in accordance with the appropriate procedures and that
records reflect quality of the coatings. The inspector concluded ,
that the Vogtle program for the design and construction of Category 1 :
coatings complies with the Final Safety Analysis Report and that l
compliance is verifiable with existing documentation. i
f
The NRC inspector furthermore believes that Module 13B accurately !
assess the status of design and construction activities for i
Category 1 coatings. This conclusion is based on information )
currently available to the NRC hspector. Should information I
subsequently become available which was not considered during this '
review and which conflicts with earlier information it will be
evaluated to determine what effect it may have on the above
conclusion.
6. Exit Interview
The inspection scope and results were summarized on August 19, 1988,
with those persons indicated in Paragraph 1. The inspector described
the areas inspected and discussed in detail the inspection results.
Dissenting coments were not received from the licensee. The licensee
did not identify as proprietary any of the materials provided to or
reviewed by the inspector during this inspection.