ML19210D120: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 21: Line 21:
==Dear Mr. Haller:==
==Dear Mr. Haller:==


Enclosed are revised Monthly Operating Reports for North Anna Power Station Uni t No.1. These reports supersede those previously forwarded for the period June, 1978 thru September, 1979 Very truly yours, h,        hcf[[ce    /)
Enclosed are revised Monthly Operating Reports for North Anna Power Station Uni t No.1. These reports supersede those previously forwarded for the period June, 1978 thru September, 1979 Very truly yours, h,        hcf((ce    /)
C. M. Stallings Vice President-Power Supply and Production Operations Enclosure (3 copies) cc:  Mr. Victor Stello, Director (10 copies)
C. M. Stallings Vice President-Power Supply and Production Operations Enclosure (3 copies) cc:  Mr. Victor Stello, Director (10 copies)
Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)
Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)

Latest revision as of 18:45, 16 March 2020

Forwards Revised Monthly Operating Repts for June 1978-Sept 1979
ML19210D120
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/16/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Haller N
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19210D121 List:
References
946, NUDOCS 7911200554
Download: ML19210D120 (1)


Text

A d VIRGINIA ELECTRIC AND Pownn COMPANY Rxcxxwono,VrHOxNIA 20261 November 16, 1979 Mr. N. M. Haller, Director Serial No. 946 Office of Management and P0/RMT:scJ Program Analysis Docket No. 50-338 U. S. Nuclear Regulatory Commission License No. NPF-4 Washington, D. C. 20555

Dear Mr. Haller:

Enclosed are revised Monthly Operating Reports for North Anna Power Station Uni t No.1. These reports supersede those previously forwarded for the period June, 1978 thru September, 1979 Very truly yours, h, hcf((ce /)

C. M. Stallings Vice President-Power Supply and Production Operations Enclosure (3 copies) cc: Mr. Victor Stello, Director (10 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)

Office of Inspection and Enforcement - Region ll

)) l 0

'#911200 554