Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable
ML18152B423
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 05/26/1999
From: Christian D
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
99-002, 99-2, GL-96-05, GL-96-5, NUDOCS 9906070111
Download: ML18152B423 (2)


Text

I e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 26, 1999 U.S. Nuclear Regulatory Commission Serial No.99-002 Attention: Document Control Desk NL&P/MAE: R1 Washington, D.C. 20555-0001 Docket Nos. 50-280/-281 50-338/-339 License Nos. DPR-32/-37 NPF-4/-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 GENERIC LETTER 96-05 PERIODIC VERIFICATION OF DESIGN-BASIS CAPABILITY OF SAFETY-RELATED MOTOR-OPERATED VALVES (MOVs}

On September 18, 1996, the NRC issued Generic Letter (GL) 96-05, entitled "Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves." The generic letter required a 60 day response and a 180 day response. Virginia Electric and Power Company's (Virginia Power's) 60 day response was documented in a letter dated November 13, 1996 (Serial No.96-504). The 180 day response required utilities to provide a written summary description of its MOV periodic verification program established in accordance with the i'equested actions. Virginia Power's 180 day response was documented in a letter dated March 12, 1997 (Serial No. 96-504A).

As a result of self assessment activities, we have decided to revise our MOV periodic verification program as described in our 180 day response to conform with the Joint Owners' Group (JOG) Program on MOV periodic verification. The** revision of our program is expected to be completed in three (3) months. Therefore, we will revise our 180 day response to GL 96-05 within 120 days of the date of this letter to incorporate a commitment to participate in the JOG Program, as applicable.

If you have any questions, please contact us.

Very truly yours, D. A. Christian Vice President- Nuclear Operations

,, ---- 990607011 i.-990526  :

, PDR ADOCK 05000280 i p PDR

e Commitments made by this letter:

1. Revise Virginia Power's 180 day response to GL 96-05 to incorporate the Joint Owners' Group (JOG) Program on MOV periodic verification within 120 days of the date of this letter to incorporate a commitment to participate in the JOG Program, as applicable.

cc: Regional Administrator U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station