MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 1999-09-08
[Table view] |
Text
e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 22, 1999 U.S. Nuclear Regulatory Commission Serial No.: 99-320 Attention: Document Control Desk NL&OS/GDM: RO Washington, D.C. 20555 Docket Nos.: 50-280, 281 50-338, 339 License Nos.: DPR-32, 37 NPF-4, 7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY AND NORTH ANNA POWER STATIONS UNITS 1 AND 2 GENERIC LETTER (GL) 96-06 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION In a letter dated May 25, 1999, the NRC requested additional information regarding Virginia Electric and Power Company's supplemental response to Generic Letter 96-06 dated March 30, 1999 (Serial Number 99-134). The supplemental response provided a structural integrity evaluation of thermally induced over-pressurization of containment penetration piping following a postulated design basis accident (DBA). Our response to the three questions included in the request for additional information is provided in the attachment.
If you have any further questions or require additional information, please contact us.
Very truly yours, D. A. Christian Vice President - Nuclear Operations Attachment Commitments contained in this correspondence: None.
- - - --- ------ ----'-d fl 9906290159 990622-- --~---- -- - --~,
PDR ADOCK 05000280.
P PDR
cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station
COMMONWEALTH OF VIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mr. D. A. Christian, who is Vice President - Nuclear Operations, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
(SEAL)
e Attachment Response to NRC Request for Additional Information Surry and North Anna Power Stations In a letter dated March 30, 1999 (Serial Number 99-134), Virginia Electric Power Company (Virginia Power) submitted a structural integrity evaluation of thermally induced overpressurization of containment penetration piping following a postulated design basis accident (OBA), specifically a loss of coolant accident (LOCA) or a main steam line break (MSLB). The evaluation was performed using the linear elastic method and acceptance criteria of ASME Boiler and Pressure Vessel Code Section Ill, Appendix F, "Rules for Evaluation of Service Loading with Level D Service Limits." The specific criteria used in the analyses was submitted in our letter dated February 25, 1998 (Serial No. 96-516C) and was subsequently discussed in a telephone conversation with members of the NRC staff.
During their review of Virginia Power's March 30, 1999 submittal, the NRC staff generated the following questions and provided them in a May 25, 1999 request for additional information (RAI). Virginia Power's response to these questions is provided below:
Question 1 Load Combinations (Reference Page 5 of Attachment 1 of SubmittaQ Note 2 states that seismic loading is not considered concurrent with a loss-of-coolant accident (LOCA). Provide the basis for not combining seismic and LOCA loads and also state how the requirements of General Design Criterion 2 of 10 CFR 50, Appendix A, which in part states "design bases shall reflect appropriate combinations of the effects of normal and accident conditions with the effects of the natural phenomena" are met.
Response 1 Note 2 to Table 5.1 actually states that "Seismic loading is not considered concurrent with the event." The "event" stated is the thermally induced peak pressure event that results from a LOCA, not the LOCA (and associated dynamic loading) itself. To meet General Design Criterion 2 (GDC-2), safety related systems are designed for seismic loading under normal operating conditions and accident conditions. During accident conditions seismic loading is considered to occur concurrent with the design basis accident (LOCA) dynamic loading. For example, the dynamic loading associated with a LOCA is considered to be concurrent with the loading associated with the design basis earthquake and these peak loading effects are combined by the square root of the sum of the squares.
Page 1 of 5
Seismic loading is not considered to be a credible, concurrent event with postulated thermally induced peak pressure loading. The reason these two events were not taken concurrently is that the seismic loading and the peak loading due to thermally induced over-pressure will not occur at the same time.
As stated in the paragraph above, seismic loading and the DBA event are taken concurrently (i.e., they begin at the same instant in time). However, thermally induced peak pressure loading, which results from the process of heating of isolated piping sections by the steam released to the containment environs as a result of the DBA, sufficiently lags the initiation of the DBA, such that seismic loadings would have subsided prior to the imposition of peak pressure stresses.
Thermally induced peak pressure only occurs for a short period of time because of containment cooling systems (Quench Spray/Containment Spray and Recirculation Spray) which are seismically designed and available after a design basis seismic event.
Furthermore, the frequency of core damage resulting from a seismic event occurring concurrently with a DBA is very small (i.e., <1 o-6) and therefore risk insignificant. A seismic event occurring at the same time as the thermally induced peak pressure in the containment penetration piping caused by a DBA is therefore even less likely and of even less risk significance.
Based on the above, Virginia Power concludes that not considering peak seismic loading concurrent with peak thermally induced over-pressure loading is reasonable from a risk significance perspective and is not a departure from GDC-2.
Question 2 Stress Intensity: (Reference Page 5 of Attachment 1 of Submittal)
Clarify if the al/owables in note 3 are given for membrane stress intensity and the values listed in column 4 under Applied Membrane Stress" are stress intensities which are calculated considering pressure and all other applied loads. Provide details of the methodology including an example how the values in column 4 have been calculated.
Response 2 The allowables in note 3 are membrane stress intensity. The applied membrane stress listed in column 4 is derived using the code equation in NB-3641.1. This equation was used for simplicity because in a thin straight pipe subjected to pressure and moment loading, the maximum membrane stress intensity is close to the hoop stress due to pressure with little effect of longitudinal moment loading. An example that details how the values in column 4 of Table 5.1 were calculated is provided below:
Page 2 of 5
Example: (Item 8 in Table 5.1, page 5, Attachment 1 of submittal)
Outside diameter of the pipe D0 =6.625 in.
Nominal pipe wall thickness tn = 0.28 in.
Pipe wall thickness with manufacturer's tolerance t = 0.875 (tn) = 0.245 in.
Applied faulted pressure P = 2765 psi From code paragraph NB-3641.1, y = 0.4 Applied stress = P Do -y P = 36280 Psi 2t Allowable Stress (2.4 Sm =48000 psi , or 0.7 Su = 42000 psi.) - OK It is recognized that in article F-1430(a) of the code that the allowable pressure is 200% of the design pressure calculated in accordance with equation 2 of NB-3641.1 with use of Sm. Thus, it can be derived from the above equation that the stress due to the faulted pressure shall not exceed 2.0 Sm. A review of our results demonstrate that the applied stress is also less than 2.0 Sm in all cases.
However, we have revised Table 5.1, page 5, Attachment 1 of our March 30, 1999 submittal to represent full compliance with paragraph F-1430.
Page 3 of 5
Revised Table 5.1 - Pipe Stress Summary Compliance to Code Article F-1430 7620 21620 45000 28 2960 2377 4754 27170 45000 46 7125 5623 11246 21520 45000 SPS-2 20 5022 4468 8936 21620 45000 28 2960 5623 11246 27170 45000 46 7125 5623 11246 21670 45000 NAPS-1 5 1247 740 1480 32870 60000 12, 13, 14 2765 1524 3048 24630 60000 20 5503 3810 7620 23400 45000 25 2069 1342 2684 28110 60000 46 7582 5623 11246 23460 46600 NAPS-2 5 1242 740 1480 17430 60000 12, 13, 14 2555 1524 3048 18980 60000 20 5337 3810 7620 22790 45000 25,26, 27 2347 1342 2684 26160 60000 46 7936 5623 11246 24640 46600 106 3171 2426 4852 20990 45000 Notes:
[1] Linear Elastic Analysis Method of analysis is used.
[2] Pressure and dead weight loadings are used. Seismic loading is not considered concurrent with this event.
[3] Allowable Faulted Pressure= 2 times the Design Pressure [F-1430(a)]
where the Design Pressure is per Equation 2 of NB-3641.1.
[4] Allowable membrane plus bending stress = 3.0Sm or 2Sy whichever is lower
[F-1430(b)].
Applied membrane plus bending stress is per Equation (9) of NB-3652.
[5] Only the piping with pressure greater than 1.2 times the design pressure is listed.
[6] Pressure increase is due to temperature effect on confined fluid inside piping on both sides of the Containment penetration.
[7] Allowable stresses are taken from ASME B & PV Code Section Ill, 1989.
[8] Adequate margins exist between applied stress and allowable stress.
[9] Allowable faulted pressure is greater than the applied faulted pressure.
Page 4 of 5
Question No. 3 Appendix F Allowables: (Reference Page 5 of Attachment 1 of Submittal)
The allowable stress criteria in note 3 are derived from article F-1331.1(a) of Appendix F. Discuss why the requirements of F-1331.1(c) for primary membrane plus bending have not been used in note 4.
The allowable stress criteria in note 4 are derived from article F-1430(b) of Appendix F. Discuss why the requirement of F-1430(a) has not been evaluated.
From the above discussion, it is appears that complete requirements of either of the articles, F-1331.1 or the alternate F-1430, have not been satisfied. Provide a justification for the "hybrid" criteria used in the evaluation.
Response 3 Our original intention was to use detailed finite element elastic analysis for calculation of stresses and to use the criteria of F-1331.1 (c). These criteria were presented in our letter dated February 25, 1998 (Serial No. 96-516C). In a subsequent discussion with the NRC staff we proposed to use code equation 9 of NB-3652 and the allowables derived from article F-1430 (b). The results of this evaluation were presented in Table 5.1 of the March 30, 1999 submittal.
Consequently, the requirements of F-1331.1(c) were not used.
An evaluation to meet the requirements of F-1430(a) was not specifically completed. However, the results discussed in our response to question 2 above indicate that the requirements of F-1430(a) are satisfied.
Virginia Power has since completed an evaluation to meet the requirements of F-1430(a). Table 5.1 was revised to include results for compliance with the requirements of F-1430(a) and F-1430(b). These two criteria for piping are used as an alternative to the procedures of F-1331. Thus, the evaluation verifies full compliance to Appendix F of the Code without using hybrid criteria from F-1331 and F-1430.
Page 5 of 5