ML18153C151

From kanterella
Jump to navigation Jump to search
Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47. Operability & Surveillance Requirements for Steam Generator Overfill Protection Sys Will Be Incorporated in Tech Spec Change
ML18153C151
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 03/19/1990
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-GTECI-A-47, REF-GTECI-SY, TASK-A-47, TASK-OR 89-736, GL-89-19, NUDOCS 9003260254
Download: ML18153C151 (3)


Text

e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 19, 1990 United States Nuclear Regulatory Commission Serial No.89-736 Attention: Document Control Desk NO/ETS Washington, D. C. 20555 Docket Nos. 50-280 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 RESPONSE TO GENERIC LETTER 89-19 Generic letter (GL) 89-19, entitled "Request for Action Related to Resolution of Unresolved Safety Issue A-47 'Safety Implication of Control Systems in LWR Nuclear Power Plants' Pursuant to 10 CFR 50.54 (f)," requests licensees to review and provide a statement of intent to implement the recommendations of Enclosure 2 and provide a schedule for implementation. Enclosure 2 recommendations include: 1) provide steam generator overfill protection and 2) provide plant procedures and Technical Specifications for operability and periodic surveillance of the overfill protection.

Both Surry and North Anna are Westinghouse-Designed PWRs that fit into Group I (those units with safety-grade overfill protection systems that use a 2-out-of-3 safety grade logic).

North Anna satisfies the Generic Letter recommendations. Requirements -for operability and surveillance are are included in the Technical Specifications and procedures are in place for testing.

(

I ~ *; c,*(-1()-::**-:* .. *::*,=.4.

'- Cl

... .. *-**'-'.:.I .,_._ 9.1 c*1c.1:-:i_ 1 '-.,J J l * .*F'[II~ ADOCK 050002:::0  : .*

p PDC

e Surr:y meets the intent of the Generic letter recommendations by maintaining the system operable and having procedures in place to test the overfill protection system.

However, operability and surveillance requirements for the steam generator overfill protection system are not included in the existing Technical Specifications. An enhancement to the Reactor Trip and Engineered Safeguards Actuation Instrument Operating Requirements (Tables 3.7-1, 2, and 3) is currently being completed.

Operability and surveillance requirements for the steam generator overfill protection system will be incorporated into this Technical Specification change. This proposed Technical Specification change is scheduled for submittal in the near future.

This information is true and accurate to the best of my knowledge. Should you have any questions please contact us.

Very truly yours, (M)iis~

,Pl )J L. Stewart Senior Vice President - Nuclear cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. J. L. Caldwell NRC Senior Resident Inspector North Anna Power Station

e e COMMONWEALTH OF VIRGINIA )

)

COUNTY OF HENRICO )

The foregoing document was acknowledged before me,

  • in and for the County and Commonwealth aforesaid, today by J. L. Wilson who is Assistant Vice President - Nuclear Operations, for W. L. Stewart who is Senior Vice President - Nuclear, of Virginia Electric and Power Company.

He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this _}L day of c ~ , 19!l.t1._.

My Commission Expires: (~ , -qJ , 19ll,

~,(_u£d£ Notary Public

'- /

/ ........ **,;:

.....-*. *;. ~

(SEAL) ;

-,, ~ ~ \;;~

~ "' \  ::::

\. '.<