Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d)
ML18152B409
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 08/05/1999
From: Mccarthy J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
99-390, NUDOCS 9908120052
Download: ML18152B409 (16)


Text

e e

  • I VIRGINIA ELECTRIC AND POWER COMPANY RicuMOND, VIRGINIA 23261 August 5, 1999 United States Nuclear Regulatory Commission Serial No.: 99-390 Attention: Document Control Desk NLOS/MM Washington, DC 20555 Docket Nos.: 50-280/281 50-338/339 License Nos.: DPR-32/37 NPF-4/7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 FITNESS FOR DUTY PROGRAM SEMI-ANNUAL PERFORMANCE DATA REPORT Enclosed is the Virginia Electric and Power Company Semi-Annual Fitness for Duty (FFD) Program Performance Data Report for January 1, 1999 through June 30, 1999.

This report is submitted pursuant to 10 CFR 26.71(d).

Attachment 1 includes summaries of management sanctions imposed, actions completed to improve the program, events reported to the NRC, and our random testing rate. Attachment 2 contains the standard FFD data forms for North Anna Power Station, Surry Power Station, Innsbrook Technical Center (corporate), and Westinghouse Electric Corporation.

Very truly yours, Commitments made in this letter: None Attachments:

1. Summary of Events and Management Actions
2. FFD Data Forms

~--

- -99081'20052 -q90805 PDR' ADOCK 05000280 R PDR

cc: U. S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23 T85 Atlanta, GA 30303-3415 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission Division of Reactor Inspection and Safeguards One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738

ATTACHMENT 1

SUMMARY

OF EVENTS AND MANAGEMENT ACTIONS

e

SUMMARY

OF MANAGEMENT SANCTIONS IMPOSED JANUARY 1 THROUGH JUNE 30, 1999 VIRGINIA ELECTRIC AND POWER COMPANY EMPLOYEES FOLLOW-UP TESTS (Resulted in termination of employment, revocation and denial of unescorted access authorization)

Confirmed positive tests for illegal drugs 1 CONTRACTOR EMPLOYEES RANDOM TESTS (Resulted in revocation and denial of unescorted access authorization)

Confirmed positive tests for illegal drugs 1 PRE-ACCESS TESTS (Resulted in denial of unescorted access authorization)

Confirmed positive tests for illegal drugs 21 Confirmed positive tests for alcohol 1 Refusal to tesUFailure to Cooperate 1 FOR-CAUSE TESTS (Resulted in revocation and denial of unescorted access authorization)

Confirmed positive tests for illegal drugs 1 I_

SUMMARY

OF MANAGEMENT ACTIONS COMPLETED TO IMPROVE THE FFD PROGRAM JANUARY 1 THROUGH JUNE 30, 1999 Virginia Power made no significant changes to the Fitness for Duty Program during this reporting period.

I I~

e

SUMMARY

OF EVENTS REPORTED TO THE NRC BY VIRGINIA ELECTRIC AND POWER COMPANY JANUARY 1 THROUGH JUNE 30, 1999 On February 23, 1999, Virginia Power reported (Event No. 35396) that a contract supervisor at Surry Power Station had been arrested offsite and charged with possession of a controlled substance. On March 1, 1999, Virginia Power updated this report when the for-cause testing results for this supervisor were confirmed positive for an illegal drug.

e e VIRGINIA ELECTRIC AND POWER COMPANY RANDOM TESTING RATE JANUARY 1 THROUGH JUNE 30, 1999 Virginia Electric and Power Company Random Testing Rate: 49.98%

Employees Contractors Surry Power Station 50.0 51.9 North Anna Power Station 49.7 47.5 Innsbrook Technical Center 49.9 46.9

e ATTACHMENT 2 FFD DATA FORMS

  • SURRY POWER STATION NORTH ANNA POWER STATION INNSBROOK TECHNICAL CENTER WESTINGHOUSE ELECTRIC CORPORATION

e Fitness for Duty Program Performance Data e

Personnel Subject to 10 CFR 26 Virginia Electric and Power Company June 30, 1999 Company Six Months Ending SURRY PWR STA (804)273-2735 Location Phone W. R. Runner, Jr.

Contact Name Cutoffs: Screen I Confirmation (ng/ml) D Appendix A to 10CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04% /0.04%

Pre-Access 16 0/0 0 0/0 830 22 I 22 For-Cause Post Accident 0 0/0 0 0/0 1 0/0 For-Cause 0 0/0 0 0/0 4 1/ 1 Observed Behavior Random 228 0/0 0 0/0 78 1/1 Follow-Up 6 0/0 0 0/0 0 0/0 Other 0 0/0 0 0/0 0 0/0 Total 250 0/0 0 0/0 913 24/ 24

Breakdown of Confirmed Positive Tests for Specific Substances Refusal Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol To Test Licensee Employees 0 0 0 0 0 0 0 Long-Term Contractors 0 0 0 0 0 0 0 Short-Term '

Contractors 14 11 0 0 0 1 1 Total 14 11 0 0 0 1 1 Breakdown of Confirmed Positive Tests for Marijuana (Initial screening cut-off level = 50 ng/ml)

~ 50 ng/ml

< 100 ng/ml ~ 100 ng/ml Licensee Employees 0 0 Long-Term Contractors 0 0 Short-Term Contractors 2 12 Total 2 12

e Fitness for Duty Program Performance Data e

Personnel Subject to 10 CFR 26 Virginia Electric and Power Company June 30, 1999 Company Six Months Ending N. ANNA PWR STA (804 )273-2735 Location Phone W. R. Runner, Jr.

Contact Name Cutoffs: Screen I Confirmation (ng/ml) D Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04% /0.04%

Pre-Access 17 0/0 0 0/0 53 0/0 For-Cause Post Accident 0 0/0 0 0/0 0 0/0 For-Cause 0 0/0 0 0/0 1 0/0 Observed Behavior Random 215 0/0 0 0/0 25 0/0 Follow-Up 6 1/1 0 0/0 3 0/0 Other 0 0/0 0 0/0 0 0/0 Total 238 1/1 0 0/0 82 0/0

Breakdown of Confirmed Positive Tests for Specific Substances Refusal Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol To Test Licensee Employees 1 0 0 0 0 0 0 Long-Term Contractors 0 0 0 0 0 0 0 Short-Term Contractors 0 0 0 0 0 0 0 Total 1 0 0 0 0 0 0 Breakdown of Confirmed Positive Tests for Marijuana (Initial screening cut-off level = 50 ng/ml)

~ 50 ng/ml

< 100 ng/ml ~ 100 ng/ml Licensee Employees 0 1 Long-Term Contractors 0 0 Short-Term Contractors 0 0 Total 0 1

f" ... I ,._ r,;

e Fitness for Duty Program Performance Data e

Personnel Subject to 10 CFR 26 Virginia Electric and Power Company June 30, 1999 Company Six Months Ending INNSBROOK (804)273-2735 Location Phone W. R. Runner, Jr.

Contact Name Cutoffs: Screen/ Confirmation (ng/ml) D Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (o/oBAC) 0.04% /0.04%

Pre-Access 13 0/0 0 0/0 11 0/0 For-Cause Post Accident 1 0/0 0 0/0 0 0/0 For-Cause 0 0/0 0 0/0 0 0/0 Observed Behavior Random 93 0/0 0 0/0 9 0/0 Follow-Up 0 0/0 0 0/0 0 0/0 Other 0 0/0 0 0/0 0 0/0 Total 107 0/0 0 0/0 20 0/0

Breakdown of Confirmed Positive Tests for Specific Substances Refusal Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol To Test Licensee Employees 0 0 0 0 0 0 0 Long-Term Contractors 0 0 0 0 0 0 0 Short-Term Contractors 0 0 0 0 0 0 0 Total 0 *- 0 0 0 0 0 0 Breakdown of Confirmed Positive Tests for Marijuana (Initial screening cut-off level= 50 ng/ml)

~ 50 ng/ml

< 100 ng/ml ~ 100 ng/ml Licensee Employees Long-Term Contractors 0

0 0

0 Short-Term Contractors 0 0 Total 0 0

Westinlouse Fitness for Duty Proglm Customer:

Performance Data Personnel Subject to 10CFR26 Virginia Power Company - Surry and North Anna Stations 1 Westinghouse Electric Company 2 June 30, 1999 Company Six months ending 1.

3 P.O. Box 158, BIN 38, Madison, PA 15663 Location 4 Peter J. Defilippi/ Betty L. Engle ~ ' . 5 (724) 722-5721 / 5719 Contact Name u- ') Phone (include area code) 6 Cutoffs: Screen/Confirmation (ng/ml) D Appendix A to 10CFR26 Marijuana 20/15 Amphetamines 300/300 Barbiturates 300/300 iI Cocaine 300/150 Phencyclidine 25/25 Benzodiazepines 300/300

  • ,1 Opiates 300/300 Alcohol (% BAC) 0.04% Methadone 300/300 Methaqualone 300/300 Westinghouse Long-Term Short-Term Testing Results Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 7 2200 0 180 Categories 8 # Tested # Positive #Tested # Positive #Tested # Positive Pre-Access 33 0 0 0 0 0 For Post accident 0 0 0 0 0 0 Cause Observed behavior 0 0 0 0 0 0 Random 0 0. 0 0 0 0 Follow-up 0 0 0 0 0 0 Other 0 0 0 0 0 0 Total 33 0 0 0 0 0

\AP Forms\ffd semi-annual report form\vapowerS99.doc: 7/28/99

Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- Refusal 9 Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 0 0 0 0 0 0 0 0 0 0 0 Employees 0 0 0 0 0 0 0 0 0 0 0 Long-Term Contractors 0 0 0 0 0 O* 0 0 0 0 0 Short-Term Contractors 0 0 0 0 0 0 0 0 0 0 0 o II TOTAL LEGEND 1 = Barbiturates 2 = Benzodiazepines 3 = Methadone 4 = Methaqualone

.e