MONTHYEARML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18151A6301999-09-0101 September 1999 Submits Summary of 990812-13 Training Managers Conference on Recent Changes to Operator Licensing Program.Meeting Covered Changes to Regulations,Examination Stds,New Insp Programs & Other Training Issues.List of Attendees Encl ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML18152B3701999-08-30030 August 1999 Informs That Virginia Electric & Power Co Hereby Granted Approval to Submit Original & One Paper Copy & 6 CD-ROM Copies of Updates to FSAR as Listed,In Response to ,Requesting Exception to 10CFR50.4(b)(6) ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3811999-08-23023 August 1999 Forwards Safety Evaluation,Granting Relief Request IWL-3 Re ISI Programs,Per Util ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B3731999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at North Anna & Surry. Requests Info Re Individuals Taking Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines ML20209E3711999-07-0202 July 1999 Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B3951999-06-30030 June 1999 Informs That Effective 990706,GE Edison Has Been Assigned as Project Manager,Project Directorate II-1,for North Anna Power Station.Edison Will Continue in Assignment as Project Manager for Surry Power Station ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML20196G2581999-06-23023 June 1999 Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196G2211999-06-21021 June 1999 Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML20195J1391999-06-11011 June 1999 Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML20195C6601999-06-0101 June 1999 Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML20207C9851999-05-28028 May 1999 Requests Regrading of RT Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML18151A6301999-09-0101 September 1999 Submits Summary of 990812-13 Training Managers Conference on Recent Changes to Operator Licensing Program.Meeting Covered Changes to Regulations,Examination Stds,New Insp Programs & Other Training Issues.List of Attendees Encl ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML18152B3701999-08-30030 August 1999 Informs That Virginia Electric & Power Co Hereby Granted Approval to Submit Original & One Paper Copy & 6 CD-ROM Copies of Updates to FSAR as Listed,In Response to ,Requesting Exception to 10CFR50.4(b)(6) ML18152B3811999-08-23023 August 1999 Forwards Safety Evaluation,Granting Relief Request IWL-3 Re ISI Programs,Per Util ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3731999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at North Anna & Surry. Requests Info Re Individuals Taking Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20209E3711999-07-0202 July 1999 Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations ML18152B3951999-06-30030 June 1999 Informs That Effective 990706,GE Edison Has Been Assigned as Project Manager,Project Directorate II-1,for North Anna Power Station.Edison Will Continue in Assignment as Project Manager for Surry Power Station ML20196G2581999-06-23023 June 1999 Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity ML18152B4191999-05-25025 May 1999 Advises That Structural Integrity Evaluation Provided 990330 Has Been Reviewed & Addl Info Requested.Staff Inquiries Encl in Form of RAI ML18152B4201999-05-20020 May 1999 Informs That on 990514,D Llewellyn & Author Confirmed Initial Operator Licensing Exam Schedule for Year 2000. Initial Exam Dates Rescheduled for Weeks of Sept 18 & 25, 2000 for Approx 11 Candidates for North Anna & 13 for Surry ML20206U7441999-05-20020 May 1999 Informs That NRC Unable to Conclude That NAPS Has Met Intent of Supplement 4 to GL 88-20.RAI Re Fire Area of IPEEE Encl. Response Requested within 90 Days of Submittal Date ML20207A8541999-05-20020 May 1999 Forwards RAI Re Licensee Listed Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 90 Days of Submittal Date ML18152B4151999-05-14014 May 1999 Informs That NRR Reorganized,Effective 990328.Forwards Organization Chart ML20206L4661999-05-10010 May 1999 Forwards SE Accepting Request to Delay Submitting Plant, Unit 1 Class Piping ISI Program for Third Insp Interval Until 010430,to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206P6401999-05-0505 May 1999 Refers to Public Meeting Conducted at North Anna Power Station on 990413 to Discuss Results of North Anna Plant Performance Review.List of Attendees Encl ML20205S0321999-04-21021 April 1999 Forwards SER Accepting Util 980804 Requests for Relief from Certain Requirements of Subsections IWE & Iwl of 1992 Addenda of ASME Section Xi.Alternatives for IWE2,IWE4,IWE6 & IWL2,authorized Pursuant to 10CFR50.55a(a)(3)(ii) ML18152B6431999-04-13013 April 1999 Forwards SER Approving Util Requested Approval of Proposed Reactor Vessel Fluence Analysis Methodology Described in Topical Rept VEP-NFA-3 Subject to Listed Limitations ML20205Q2451999-04-12012 April 1999 Forwards Insp Repts 50-338/99-01 & 50-339/99-01 on 990131- 0313.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20205T1411999-04-0909 April 1999 Informs That on 990407,A Royal & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Dates Scheduled for Wks of 000925 & 1002 for Approx 11 Candidates ML20196K9891999-03-29029 March 1999 Confirms Plans to Hold Meeting on 990413 at North Anna Nuclear Information Center to Discuss North Anna Plant Performance Review ML20196L0021999-03-24024 March 1999 Discusses Plant Performance Review of North Anna Power Station Completed by NRC on 990205.Found Overall Performance at North Anna to Be Acceptable.Several Examples of Inadequate or Untimely Problem Resolution Were Noted ML20205B5641999-03-24024 March 1999 Forwards Audit Rept of North Anna Power Station,Units 1 & 2 Conducted on 990126-28 in Glen Allen,Va.Audit Team Assessment of Y2K Project Plan Identified Plan as well-structured,well Organized & Well Implemented ML20207E1331999-03-0101 March 1999 Forwards Insp Repts 50-338/98-11 & 50-339/98-11 on 981220- 990130.No Violations Noted.Util Conduct of Activities at North Anna Power Station Generally Characterized by Safety Conscious Plant Operations & Good Maintenance ML20203F8681999-02-16016 February 1999 Forwards Request for Addl Info Re Util 970527 plant-specific Summary Rept in Response to USI A-46 Program at North Anna Power Station,Units 1 & 2 ML18152B5391999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam ML20196K3681999-01-21021 January 1999 Discusses Closure of Tasks Re Generic Implication of part- Length Control Rod Drive Mechanism Housing Leak at Prairie Island,Unit 2 & Anna Power Station,Units 1 & 2 ML20199K3221999-01-14014 January 1999 Forwards Insp Repts 50-338/98-10 & 50-339/98-10 on 981108- 1219.No Violations Identified.Conduct of Activities at North Anna Power Station Generally Characterized by safety-conscious Plant Operations ML18152B7201999-01-13013 January 1999 Informs That on 990117,Region II Will Implement Staff Reorganization as Part of agency-wide Streamlining Effort. Reductions Will Eliminate Special Insp Branch in Div of Reactor Safety.Organization Chart Encl ML20198S3921999-01-0606 January 1999 Forwards Request for Addl Info on Resolution of USI A-46 for North Anna Power Station,Units 1 & 2 ML18151A6611998-12-23023 December 1998 Discusses Training Managers Conference Conducted at Richard B Russell Building on 981105.List of Attendees & Agenda Used for Training Managers Conference Encl ML20198H8951998-12-22022 December 1998 Forwards Corrected Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval & Se.Authorization Ltr Erroneously Dtd as 981103 & End Dates of Second 10-yr Insp Intervals Incorrect ML20198P0401998-12-14014 December 1998 Refers to 981210 Open Meeting at Licensee Request at Region II Re Weld Discrepancies Identified on Various Auxiliary Feedwater Sys Pipe Supports During Safety Sys Engineering Insp.List of Attendees & Util Presentation Handouts Encl ML20196J5591998-12-0808 December 1998 Submits Correction to Transmittal Ltr ,which Forwarded SE Authorizing Licensee Relief Request Re Rev to NDE-32, Svc Water Sys Leaks, Per 10CFR50.55a(a)(3)(ii). Corrected Date Should Be 981203 ML17229A9371998-12-0404 December 1998 Forwards Insp Repts 50-335/98-14 & 50-389/98-14 on 981019-23 & 1102-06 & Nov.Four Apparent Violations Identified & Being Considered for Escalated Ea.C/As at Facility Relative to Fpfi Findings Were Extensive ML20198A7491998-12-0404 December 1998 Confirms 981203 Telcon Between L Hart of Licensee Staff & V Mccree of NRC Re Meeting Scheduled for 981210 in Atlanta, Ga Concerning Pipe Support Potential Construction Errors or Drawing Errors ML20198H9341998-12-0303 December 1998 Forwards SE Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant,Per Util 970224 Relief Request ML20196G9431998-12-0202 December 1998 Advises of Planned Insp Effort Resulting from Insp Planning Meeting,Completed on 981102.Details of Insp Plan for Next 4 Months Encl ML20196A6581998-11-25025 November 1998 Forwards Notice of Withdrawal of 960321 Application for Amends to Licenses NPF-4 & NPF-7 for Plant.Changes Would Have Clarified Requirements for Testing Charcoal Absorbent in Waste Gas Charcoal Filter Sys ML20196B0011998-11-23023 November 1998 Forwards Emergency Response Data Sys Implementation Documents,Which Include Data Point Library Updates for Listed Plants.Changes Should Be Made to Data Base as Soon as Possible.Without Encl ML18152B7021998-11-13013 November 1998 Informs That on 981007,NRC Administered Gfes of Written Operator Licensing Examination.Copy of Answer Key & Master Bwr/Pwr Encl,Even Though Facility Did Not Participate in Exam.Without Encl ML20196H3951998-11-0505 November 1998 Forwards Insp Repts 50-338/98-05 & 50-339/98-05 on 980713- 17,27-31 & 0921-25 & Notice of Violation & Re Failure to Implement Adequate Corrective Actions to Resolve Corrosion of AFW Tunnel Pipe Supports Identified in Sept 1996 ML20196G1161998-11-0303 November 1998 Forwards Safety Evaluation Authorizing Rev to ISI Program Relief Reuest NDE-32 Re SWS Leaks,Submitted on 980224,for Remainder of Second 10-yr Insp Interval for Each Unit ML20155H8061998-10-29029 October 1998 Responds to Discussing NRC Initiatives & Efforts. Plans for Another Stakeholders Meeting Underway for 981113. Staff Will Continue to Solicit Feedback & Comments from Public on Initiatives ML20154Q8331998-10-21021 October 1998 Informs That Info Submitted in 980911 Application & Affidavit Re WCAP-15063-P, W In-Reactor Creep Model, Marked Proprietary,Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML18152B6971998-10-0909 October 1998 Extends Invitation to Annual Training Manager Conference in Atlanta,Ga on 981105.Goal to Provide Open Forum for Discussion of Operator Licensing Issues ML20154G3611998-10-0707 October 1998 Informs That Util 951018,960722 Responses to Anomalies Identified in SER Dtd 950924,acceptable & Subject to NRC Inspection.Request for Relief from Valve Quarterly Tests & Proposal to Extend Test Interval,Not Acceptable 1999-09-08
[Table view] |
See also: IR 05000338/1999003
Text
,
..
l
July 2,1999
!
t
I
-
Virginia Electric and Power Company
ATTN: Mr. James P. O'Hanlon
l
Senior Vice President - Nuclear
'
Innsbrook Technical Center
5000 Dominion Boulevard
. Glen Allen, VA 23060
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NOS. 50-338/99-03,50-339/99-03
Dear Mr. O'Hanlon:
On June 5,1999, the NRC completed an inspection at your North Anna Power Station. The
<
enclosed report presents the results of that inspection.
During the six weeks covered by this inspection period, your conduct of activities at the North
l
Anna Power. Station was generally characterized by safety-conscious plant operations, good
j
maintenance, engineering, and plant support work practices.
j
Based on the results of this inspection, the NRC has determined that a violation of NRC
requirements occurred. The violation ~is being treated as a Non-Cited Violation (NCV),
consistent with Appen' dix 0 of the Enforcement Policy. The NCV is described in the subject
inspection report. If you contest the violation or severity level of the NCV, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial, to
the United States Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555-0001, with copies to the Regional Administrator, Region ll, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
Orig signed by Robert C. Haag
,
Robert C. Haag, Chief
.
Reactor Projects Branch 5
Division of Reactor Projects
I.
'
Docket Nos.: 50-338,50-339
l/
License Nos.: NPF-4, NPF-7
l
/
,
L
Enclosure:
NRC Integrated Inspection Report
cc w/ encl: Continued see page 2
1
FFICIAl. COPY
.140018
_
,
9907150012 990702
PDR
ADOCK 05000338
)
gg p/
J
O
PDR
w
1
.
..
,
..
VEPCO
2
cc w/ encl:
.
J. H. McCarthy, Manager
-
P
Nuclear Licensing and
Operations, Suppo:t
.. Virginia Electric and Power Company
5000 Dominien Boulevard
Glen Allen, VA 23060
)
W. R. Matthews
Site Vice Presioent
North Anna Power Station
P. O, Box 402
Mineral, VA 23117-
E. S. Grecheck
Site Vice President.
Surry Power Station.
Virginia Electric and Power Company
5570 Hog Island Road
Surry,VA 23883
Executive Vice President
Old Dominion Electric Cooperative
4201 Dominion Boulevard
Glen Allen, VA 23060_
Virginia Corporat.on Commission
Division of Energy Regulatica
l
P. O. Box 1197
l
Richmond,VA 23209
)
C' :nty Administrator -
Louisa County
P. O. Box 160
Louisa,VA 23093
Donald P. Irwin, Esq.
Hunton and Williams
951 E. Byrd Street
, .~ Richmond, VA 23219-4074,
_
i
Attorney General
,
Supreme Court Building
900 East Main Street
Richmond, VA 23219
State Health Commissioner
Office of the Commissioner
l
Virginia Department of Health
P.'O. Box 2448
Richmond, VA 23218
-
,
_.
.
.
VEPCO
3
e
L
l
Distribution w/ encl:
!
L. Plisco, Ril
L. Garner, Ril
G. Edison, NRR
R. Gibbs, Ril
P. Fillion, Ril.
F. Wright, Rll
L Hayes,Ril
.
R. Alello, Ril
PUBLIC
NRC Resident inspector
U.S. Nuclear Regulatory Commission
l
1024 Haley Drive
l
Mineral, VA 23117
l
NRC Resident inspector
l
U.S. Nuclear Regulatory Commission
Surry Nuclear Power Station
5850 Hog Island Road
.Surry, VA 23883
l
l
l
l
.
s....-c
. . -
-
- - . .
OFFICE
Ril:DRP ,,,
RII:DFjp _
Rll:DRP
Rll:DRP
Ril:DRI-
Ril:DR(/
_
SIGNATURE g,7 74,, ggy
g {
NAME
RGibbs
' KCnynv . '
R61 dwell
GMcCoy
LGarner
KLainyI"
,
DATE_
. 7/ / /99
. 7/ ) /99
7/ /99
7/ /99
7/ /99
7/ 'p/99
7/ /99
COPY?
/YES) NO
(yES) NO
YES
NO
YEs
NO
YEs
NO
YEs
(NO)
YEs
NO
..
' OFMCIAL RECORD COPY
DOCUMENT NAME: G:\\na99-03.rpt
"
l
b.1_:
,JUL-01-1999 18:3?'
NORTH 4tM SITE
5408945650
f al
VEPCO
'
5
\\Distnbution w/ encl:
q
L\\Pilsco, Ril
'
L. Darner, Ril
G.
ison, NRR
R. Gi
. Ril
P. Fillio Ril
F. Wright, ll
L. Hayes,
i
R. Aiello, Ril
PUBLIC
NRC Resident ins
or
U.S. Nuclear Regul
Commission
1024 Haley Drive
Mineral,VA 23117
j
NRC Resident inspector
U.S. Nuclear Regulatory Co
ission
Surry Nuclear Power Station
5850 Hog Island Road
Surry,VA 23883
\\
i
I
!
.
-.
..
OFFICE
sui:DRP
RA;DRP
RN:DRP
M:DRP
Ril:DRP
M:DR8
j
SIGNATURE
ggm__
,
NARIEE
RGilitis
KCoyne
RCakhmeH
GIsocoy
'LGamer
KLandes
DATE
71 199
Tl 199
71 18 9
7! 199
l # 199
7/ 189
7/ 199
COPY?
YEs
No
YES
NO
YEs
NO
YE8
NO
AES ) NO
YES
NO
YES
NO
,
OPPICIAL RECORD COPY
DOCUl#ENT NAleti; G:Vis99 03.rpt
(.,'
TOTnL P.01
i
07-01-1999 01:19PM- FROM US tRC FARLEY
TO
14045624514
P.01-
IRopert Caloweg - naW-u3.rm
Page 3l
PCO
Dis butionw/ encl:
L.Plibpo,Ril
L.Ga
r, Ril -
q
G. Ediso , NRR
R. Gibbs, il
P. Fillion, R
j
F. Wright, Ril
1
L Hayes,Ril
{
R. Alello, Rll
)
PUBLIC
NRC Resident inspe
'
U.S. Nuclear Regulato Commission
)
1024 Haley Drive
Mineral, VA 23117
t
NRC Resident inspector -
U.S. Nuclear Regulatory Commission
Surry Nuclear Power Station
5850 Hog Island Road
Surry,VA 23883
J
l
1
..
.
.
f
OFFICE
Ril:DRP
'Ril:DRP
Ril:DRP ,
,
RitDRP
s80 NATURE
ff //s, , s//
NAtlE
ROltha
KCoyne
RCakfwell
Olsocoy
l
DATs
7/ /99
7/ 199
7/ l /pg
7/ /pg
7/ 199
7/ /pg
7/
l
TOTAL P.01
i
,JUL-01-1999 08:23
SURRY RESIDENT OFFICE
P.01
j
,
PAX TRANUMITTAL
g
.a
PCO
b NMc<
(s. McC %
-
2
~,
m -
UMC-
M7-357- 2i o l
Disthbution tv/ encl:
__ d* od-%2 - hl
737,337,77,ig
%,
L. Plis ' Rll
__
~
~'*
L.Ga
Ril
G. Edison, RR
R. Gibbs, R
P. Fillion, Ril
F. Wright, Rll
L Hayes,Ril
R. Aiello, Rll
PUBUC
NRC Resident Inspector
U.S. Nuclear Regulatory Co mission
1024 Haley Drive
Mineral, VA 23117
NRC Resident inspector
U.S. Nuclear Regulatory Commission
Surry Nudear Power Station
5850 Hog Island Road
,
Surry, VA 23883 -
j
l
.. -.
-
vrtpGE
RN:DRP
RII:DRP
Rit:oRP
Ral:DNP
~
~
-
5 " ^TURE
g
!
f* =
RGibbs
KCoyne
RC.;c .;
GMcC5y
{
DATE
7I 199
71 199
7/ 19 9
Tl g /99
7/ /99
7/ 199
7/ /99
.wr-i?
YE5
NO
YE5
NO
YE5
NO
YF.5
(fl9_
YES
NO
YE5
No
YES
No
j