ML19210D124
Jump to navigation
Jump to search
| ML19210D124 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 11/05/1979 |
| From: | Wil Madison VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML19210D121 | List: |
| References | |
| NUDOCS 7911200558 | |
| Download: ML19210D124 (2) | |
Text
.
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH June YEAR 1978 (Revised 11-05-79)
SUBMITTED:
hD dLut>D__._
SUPERIffENDENT - OPERATIONS APPROVED:
,R 1367 292 19nn oo 5M
4 i
b OPERATING DATA REPORT DATE 11-5 74 CO51PLETED BY u _ p PNIison TELEPHONE.700 Ro4-5151 OPERATING STATUS florth Anna Unit 1 Notes Commercial
- 1. Unit Name:
une, M (Revised)
- 2. Reporting Period:
6-6-78 0001 3.. Licensed Thermal Power (31Wt):
2775 947
- 4. NamepLte Rating (Gross 51We):
907
- 5. Design Electrical Rating (Net SIWE):
920
- 6. 51aximum Dependable Capacity (Gross 51We):
893
- 7. Sf aximum Dependable Capacity (Net 51We):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason 3:
N/A
- 9. Power Level To which Restricted,if Any (Net 51We):
fl/A
- 10. Reasons For Restri..tions. If Any:
N/A This Stonth Yr..to.Date Cumulative 600 600 600
- 11. Hours in Reporting Period 69.1 597.1 597.I
- 12. Number Of Ilours Reactor Was Critical 2.9 2.9 2.9
- 13. Reactor Reserve Shutdown Hours 596.2 596.2 596.2
- 14. liours Generator On4.Ine
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gmss Thermal Energy Generated (51WH) 1,482,537 1482.537 1.482.537
- 17. Gros. Electrical Energy Generated (51WH) 480,915 480.915 480,915
- 18. Net E!tetrical Energy Generated (SiWH) 449,108 449,108 449,108 99.4 99.4 99.4
- 19. Unit Service Factor 99 4 99 4 99.4
- 20. Unit Availability Factor 83.4 83.4 83.4
- 21. Unit Capacity Factor (Using 5f DC Net) 82.b 82.5 82.5
- 22. Unit Capac'ty Factor (Using DER Net)
U6 0.6 0.6
- 23. Unit F(,rced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Eacht:
Maintenance, August 1-8, 1978 (7 Days)
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 20. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed 4-5-78 0716 INITIAL CRITICALITY 4-1/-78 2208 INITIAL ELECTRICITY C05131ERCIAL GetRATION g._g_78 0001 1367
'293 (0/77 )