Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML18153C3661990-09-20020 September 1990 Forwards Topical Rept VEP-NE-3-A, Qualification of WRB-1 CHF Correlation in VEPCO Cobra Code. ML20065D5671990-09-20020 September 1990 Forwards Rev 15 to Security Personnel Training & Qualification Plan.Rev Withheld ML18153C3701990-09-18018 September 1990 Forwards Addl Info Re Facility Containment Isolation Valve Type C Test,Per 900914 10CFR50,App J Exemption Request ML18152A2341990-09-14014 September 1990 Requests Exemption from 10CFR50,App J Section III.D.3 Re Local Leak Rate Testing During Every Reactor Shutdown. Basis & Justification for Exemption Encl ML20059J3341990-09-13013 September 1990 Forwards Rev 15 to Nuclear Security Personnel Training & Qualification Plan.Rev Withheld ML20059H7391990-09-10010 September 1990 Forwards Rev 15 to ISFSI Nuclear Security Personnel Training & Qualification Plan.Rev Withheld ML20059H2931990-09-0707 September 1990 Advises of Review & Approval of ASME Section XI Inservice Insp Program Interval 1 Repair & Replacement Program Change to Applicable Code Edition & Addenda ML20064A5201990-09-0707 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-15 & 50-339/90-15.Corrective Actions:Procedures Revised to Include Tolerance Bands for Temp Control Switch Setpoints & Involved Personnel Counseled ML20059E5481990-08-31031 August 1990 Forwards Supplemental Info Re Deletion of Pressurizer Safety Valve Requirement During Mode 5.Current Tech Spec Requiring One Operable Safety Valve in Mode 5 Unnecessary & May Be Deleted ML18151A2901990-08-31031 August 1990 Forwards Rev 10 to Updated FSAR for Surry Power Station Units 1 & 2,representing Second Updated FSAR Submitted This Yr ML18153C3451990-08-29029 August 1990 Forwards Proprietary Semiannual Fitness for Duty Program Performance Data Rept for 900103-0630.Rept Includes Summaries of Mgt Sanctions Imposed,Actions Taken to Correct Program Weaknesses & Events Reported to Nrc.Encl Withheld ML18153C3391990-08-22022 August 1990 Requests Approval for Use of Plugs Fabricated of nickel- chromium-iron Uns N-06690 Matl (Alloy 690) to Plug Tubes in Steam Generators for Mechanical & Welded Applications ML18153C3381990-08-22022 August 1990 Responds to NRC 900723 Ltr Re Violations Noted in Insp Rept 50-280/90-21 & 50-281/90-21.Corrective actions:as-found-as- Left Conditions of Auxiliary Feedwater Evaluated & Found Operable ML20063Q1241990-08-15015 August 1990 Provides Supplemental Info for 900115 Tech Spec Change Request Re Max Allowable Control Rod Drop Time.Retained DNBR Margin Tracked & Documented by Calculational Note ML20058N5941990-08-0808 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-11 & 50-339/90-11.Corrective Actions:Procedure Revised to Limit Applicablity to Small Refueling Cavity Leaks & Listed Evaluations & Revs Will Be Made to EOP ML18153C3171990-08-0101 August 1990 Resubmits Synopsis of Changes to Updated Operational QA Program Topical Rept Vep 1-5A ML18153C3161990-08-0101 August 1990 Provides Supplemental Response to NRC 900629 Ltr Re Electrical Crossties,Load Shedding on Nonblackout Unit & Emergency Diesel Generator Reliability.Emergency Diesel Generator Reliability Program in Place,Per Reg Guide 1.155 ML18153C3091990-07-30030 July 1990 Provides Outline of Plan to Meet 10CFR50 App G Requirements, for Low Upper Shelf Energy Matls,Per NRC 900521 Request ML18153C3061990-07-30030 July 1990 Forwards Revised Tech Spec Pages,Addressing Constitution of Quorum & Timeliness of Mgt Safety Review Committe Meeting Minutes,Per NRC Request ML18153C3101990-07-26026 July 1990 Forwards Decommissioning Financial Assurance Certification Rept..., Nuclear Decommissioning Trust Agreement & Nonqualified Nuclear Decommissioning Trust Amended & Restated Trust Agreement, Per 10CFR50.75 ML18153C3051990-07-26026 July 1990 Advises That Util Submitted Decommissioning Funding Plan & Financial Assurance Info W/Isfsi License Application ML18153C3031990-07-26026 July 1990 Advises of Withdrawal of Request for NRC Review & Approval of Engineering Evaluation 8.Revised Evaluation Will Be Maintained Onsite for NRC Audit During Future Insps,Per Generic Ltr 86-10 ML18153C3041990-07-26026 July 1990 Responds to NRC 900626 Ltr Re Violations Noted in Insp Rept 50-281/90-20.Corrective Actions:Leaking Drain Plug & Upper Drain Plug on Motor Replaced W/Oil Drain Assemblies Composed of Piping & Valves ML20055H5651990-07-20020 July 1990 Requests for Temporary Waiver of Compliance from Requirement of Tech Spec 3.3.1.1,Table 2.3-2 Re Response Time Testing. Request Does Not Pose Significant Hazards Consideration ML18153C2901990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Listed Transmitters Compiled.Transmitters Found Installed within Reactor Protection or ESFAS Have Been Replaced ML20055F9361990-07-16016 July 1990 Advises That No 30-day Rept Will Be Made Re Degradation of Seismic Support Bolts of post-accident Hydrogen Recombiners 1-HC-HC-1 & 2-HC-HC-1 ML20044B3501990-07-13013 July 1990 Forwards Monthly Operating Repts for June 1990 & Corrected May 1990 Rept Pages for North Anna Power Station ML18153C2861990-07-12012 July 1990 Requests Cancellation of Operator Licenses for Listed Individuals.Licenses No Longer Required ML18153C2871990-07-11011 July 1990 Responds to Violations Noted in Insp Repts 50-280/90-18 & 50-281/90-18.Corrective Actions:Permanent Drain Line Installed & Matrix Which Describes Proper Ventilation Alignment for Plant Conditions Provided for Personnel Use ML20055E8121990-07-0909 July 1990 Requests Cancellation of Licenses Listed ML18153C2851990-07-0606 July 1990 Forwards Response to Generic Ltr 90-04 Re Status of Generic Safety Issues ML20055D4831990-07-0303 July 1990 Requests That Operator License for Bl Shriver Be Cancelled. License No Longer Required ML20055D4841990-07-0303 July 1990 Requests That Operator Licenses for Listed Individuals Be Cancelled.Licenses No Longer Required ML18153C2821990-07-0303 July 1990 Requests Exemption from 10CFR50,App J,Paragraph III.A.6(b), Which Requires That When Two Consecutive Periodic Type a Tests Fail to Meet Applicable Acceptance Criteria Type a Test Shall Be Performed at Plant ML18153C2831990-07-0303 July 1990 Advises That MW Hotchkiss No Longer Needs Operator License SOP-20548-1.Cancellation of License Requested ML20055D7701990-06-29029 June 1990 Submits Supplemental Response to Violations Noted in Insp Repts 50-338/90-04 & 50-339/90-04 Re Failure to Take Timely Corrective Action for Repair of B Low Head Safety Injection Pump (1-SI-P-1B).No Addl Purchasing Procedure Required ML18153C3591990-06-28028 June 1990 Responds to SALP Repts 50-280/90-16 & 50-281/90-16 for Period 890701-900331.Corrective Actions Focus on Issues of Maint Backlog,Maint planning,post-maint Testing,Staffing & Procurement ML18153C2611990-06-21021 June 1990 Responds to NRC 900522 Ltr Re Violations Noted in Insp Repts 50-280/90-07 & 50-281/90-07.Corrective actions:as-built Configurations of 120-volt Ac & Dc Vital & Semivital Panel Breaker Installations Verified to Be Acceptable ML20043H9421990-06-21021 June 1990 Forwards Proprietary WCAP-12351, North Anna Unit 1 Evaluation for Tube Vibration Induced Fatigue, Per Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Rept Withheld (Ref 10CFR2.790) ML18153C2591990-06-18018 June 1990 Forwards Response to NRC 900524 Request for Addl Info Re NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Engineering Will Initiate Study to Evaluate Enhancements of Cooldown & Possible Heatup Operation ML18153C2581990-06-18018 June 1990 Forwards Reissued Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989. Rept Contains Info Re SR-89,Sr-90 & Fe-55 Analytical Results for Liquid Composite Samples ML18153C2541990-06-15015 June 1990 Forwards Corrected Tech Specs Page 3.1-3,per Identification of Typo in 900522 Application for Amends to Licenses DPR-32 & DPR-37 ML20055C8661990-06-15015 June 1990 Forwards Application for Reissuance of NPDES Permit ML20043G5711990-06-15015 June 1990 Forwards Response to Request for Addl Info Re Insp Rept 50-339/89-20 Concerning Plant Safety Sys Outage Mod Insp. Response Withheld (Ref 10CFR73.21) ML20043H1131990-06-15015 June 1990 Concludes That Removal of Temporary Loose Parts Monitoring Sys Does Not Increase Probability of Acccident,Create Possibility of New Kind of Accident & Does Not Reduce Margin of Safety ML18153C2521990-06-14014 June 1990 Responds to NRC 900515 Ltr Re Violations Noted in Insp Repts 50-280/90-09 & 50-281/90-09.Corrective Actions:Abnormal Procedures & Fire Contingency Action Procedures Being Upgraded Via Technical Procedure Upgrade Program ML20043G8731990-06-14014 June 1990 Discusses Evaluation of ASME Section XI Testing for Outside Recirculation Spray Pumps ML20043H2091990-06-13013 June 1990 Forwards List of Corrective Actions & Current Status in Response to NRC Bulletin 88-004, Potential Safety-Related Pump Loss ML20043F4531990-06-0808 June 1990 Forwards, Core Surveillance Rept for North Anna 2,Cycle 7 W/Extended License Burnup Limit. Rept Contains Specific Power Distribution Limits Applicable for Cycle 7 Operation W/Burnup Limit Extension ML18153C2501990-06-0808 June 1990 Confirms That Primary Policy Re Onsite Property Damage Insurance,Provided by Nuclear Mutual Limited 1990-09-07
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 .
July 18, 1990 U.S. Nuclear Regulatory Commission Serial No.90-157.
Attention: Document Control Desk NL&P/RMN R2 Washington, D.C. 20555 Docket Nos. 50-:280 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND* POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 RESPONSE TO NRC BULLETIN 90-01
- LOSS OF FILL-OIL IN ROSEMOUNT TRANSMITTERS We have received your March 9, 1990 bulletin (NRCB 90-01) concerning loss of fill-oil in pressure transmitters manufactured by Rosemount. Our response is provided in the attachment.
If you have any questions or require additional information, please contact us.
Very truly yours,
/ ,
,j,
. //L.-* /1;/0:'
I :1._r;:__ ) -OL,
/-w. L. Stewart Senior Vice President - Nuclear Attachment i'.) - *,*:- ...-.
=-* .u1._.
9oD 7 ;).. 3o 2- ~ o
cc: U.S. Nuclear Regulatory Commission Region II*
101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323
- Mr. M. S. Lesser NRC Senior Resident Inspector North Anna Power Station Mr. W. E. Holland NRG Senior Resident Inspector Surry Power Station
e COMMONWEALTH OF VIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by F. K. Moore who is Vice President - Nuclear Engineering Services, for W. L. Stewart who is Senior Vice President - Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this /8 day of . q~ , 19..!lQ_.
My Commission Expires: 1 .J&~ 3/ , 19 'tr/.
__@eA*~-
Notary Public
RESPONSE TO NRC BULLETIN NO. 90-01:
LOSS OF FILL-OIL IN TRANSMITTERS MANUFACTURED BY ROSEMOUNT NORTH ANNA AND SURRY POWER STATIONS On March 9, 1990, the Nuclear Regulatory Commission (NRC) issued NRC Bulletin 90-01. The bulletin requires that all holders of operating licenses or construction permits for nuclear power reactors identify and take appropriate corrective actions for _
Model 1153, Series 8, Model 1153 Series D and Model t 154 Rosemount manufactured transmitters that may be leaking fill-oil.
- NRC Bulletin 90.:01 requests that each licensee perform the following actions for operating nuclear power reactors. The item numbers used below correspond with those in the Bulletin.
REQUESTED ACTIONS
- 1. Identify Model 1153 Series B, 1153 Series D, and Model 1154 pressure or differential pressure transmitters, excluding Model -1153 Series B, 1153 Series D, and Model 1154 Transmitters manufactured by Rosemount subsequent to July 11, 1989, that are currently utilized in either safety-related systems or systems installed in accordance with 10 CFR 50.62 (the* ATWS rule).
Response
Lists of the above described transmitters have been compiled.
- 2. Determine whether_ any transmitters identified in Item 1 are from the manufacturing lots that have been identified by Rosemount as having a high failure fraction due to loss of fill-oil. Addressees are requested not to utilize transmitters from these suspect lots in the reactor protection or engineered safety features actuation systems; therefore, addressees are requested to develop and implement a
- the earliest appropriate opportunity, transmitters from these suspect lots in use in the reactor protection or engineered safety features actuation systems.
Response
The above action has been completed. Two transmitters from the high failure fraction lots identified by Rosemount were found to be installed within the reactor protection or engineered safety features actuation systems at Surry Power Station. Both of these have been replaced. No transmitters from the high failure fraction lots were found in the reactor protection or engineered safety features actuation systems at North Anna.
Page 1 of 7
- 3. Review plant records (for example, the three most recent calibration records) associated with the transmitters identified in Item 1 above to determine whether any of these transmitters may have arready exhibited symptoms indicative of loss of fill-oil. Appropriate operability acceptance criteria should b~ developed and applied to transmitters identified as having exhibited symptoms indicative of loss of fill-oil from this plant record review. Transmitters identified as having exhibited symptoms indicative of loss of fill-oil that do not conform .to the operability acceptance criteria should be addressed in accordance with the applicable technical specification.
Transmitters identified as having exhibited symptoms indicative of loss of fill-oil that do not conform to the operability acceptance criteria and are not addressed in the technical specifications should be replaced at the earliest appropriate opportunity.
Response
-Operability acceptance criteria were developed using the diagnostic procedures proposed by Rosemount in their Technical Bulletins Nos. 1 through 4. The plant records of the transmitters identified in Item 1 have been reviewed in accordance with the requirements of the operabHity acceptance criteria.
The data obtained for Surry Power Station transmitters identified in Item 1, showed three transmitters were flagged by the calculation screening criteria and were subject to post calculation screening criteria. A review of the data shows that two of these transmitters have exhibited calculated zero shift in the same direction for each of the two calibration periods for which data is available. Data for the third transmitter does not indicate symptoms of loss of fill-oil. These transmitters will continue to be calibrated at the prescribed intervals and are subject to enhanced monitoring as described in Item 4:-
The data obtained for North Anna Power Station transmitters identified in Item 1, showed one transmitter was flagged by the calculation screening criteria and was subject to post calculation criteria. A review of the transmitter static pressure criteria indicated that the transmitter results could not be interpreted to mean that
- the transmitter has exhibited symptoms indicative of loss of fill-oil. This transmitter will continue to be calibrated at the prescribed interval and is subject to enhanced monitoring as described in Item 4.
- 4. Develop and implement an enhanced surveillance program to monitor transmitters identified in Item 1 for symptoms of loss of fill-oil.
- This enhanced surveillance program should consider the following or equally effective actions:
- a. Ensuring appropriate licensee personnel are aware of the symptoms that a transmitter, both during operation and during calibration activities, may exhibit if it* is experiencing a loss of fill-oil and the need for prompt identification of transmitters that may exhibit these symptoms; Page 2 of 7
e
- b. Enhanced transmitter monitoring to identify sustained transmitter drift;
- c. Review of transmitter performance following planned or unplanned plant transients
- or tests to identify sluggish transmitter response;
- d. Enhanced awareness of sluggish transmitter response to either increasing or decreasing test pressures during calibration activities;
- e. Development and implementation of a program to detect changes in process noise; and
- f. o*evelopment and application to transmitters identified as having exhibited symptoms indicative of loss of fill-oil of an appropriate operability accep_tance criteria. Transmitters identified as having exhibited .symptoms indicative of loss of fill-oil that do not conform to the operability acceptance criteria should. be addressed in - accordance with the applicable technical specification. Transmitter_s identified as having exhibited symptoms ind.icative of loss of fill-oil that do not conform to the operability acceptance criteria and are not addressed in the technical specifications. should be replaced at the earliest appropriate opportunity.
Response
Our training programs have been revised to ensure that appropriate personnel are aware of the symptoms that a transmitter may exhibit, both during operation and during calibration activities, if it is experiencing a loss of fill-oil and the need for prompt identification of transmitters that may display these symptoms. Th.e training involves Instrument and Operations Department personnel.
Station plans for collecting and analyzing transmitter monitoring data during the
- upcoming refueling outages have been developed and will be implemented during the 1990/1991 refueling outages.
The surveillance program is comprised of monitoring and diagnosis of Rosemount transmitters to provide adequate assurance of correct transmitter performance.
A monitoring program for the transmitters identified in Item 1 has been developed and consists of automated electronic and manual data gathering.
I' Greater than 90% of the Item 1 transmitters which are identified as safety-related equipment have their output recorded by a high speed data acquisition system.
Data *are periodically collected and transferred to another computer. Calculations Page 3 of7
are performed on these data and* operability screening criteria applied to
-determine the state of each transmitter.
The remaining Item 1 identified transmitters have transmitter output data presented on indicators and a process computer. An evaluation for collecting and processing this data is being performed.
The frequency of data retrieval, calculation performance and screening criteria application shall depend upon transmitter application, environment and model number. Experience gained from enhanced surveillance will be a factor in establishing such frequencies.
The comprehensive enhanced surveillance program plan for both sites will be developed by 9/1 /90.
- 5. Document and maintain in accordance with existing plant procedures a basis for continued plant operation covering. the time period from the present until such time that the Model 1153 Series B, 1153 Series D, and Model 1154 transmitters from the manufacturing lots that have been identified by Rosemount as having a high failure fraction due to loss of fill-oil in use in the reactor protection or engineered safety features actuation systems can be replaced. In addition, while performing the actions requested above, addressees may identify transmitters exhibiting symptoms indicative of loss of fill-oil that do not conform to the established operability acceptance criteria and are not addressed in the technical specifications. As these transmitters are identified, this basis for continued plant operation should be updated to address these transmitters covering the time period from the time these transmitters are identified until such time that these transmitters can be replaced. When developing and updating this basis for continued plant operation, addressees may wish to consider transmitter diversity and redundancy, diverse trip functions (a separate trip fun,ction that may also provide a corresponding trip signal), special system and/or component tests, or (if necessary) immediate replacement of certain suspect transmitters.
Response
No transmitters identified by Rosemount as having a high failure fraction due to loss of fill-oil are in use in the reactor protection system, engineered safety features ~ctuation systems or systems installed in accordance with 10 CFR 50.62 (the ATWS Rule).
Thirteen transmitters identified by Rosemount as being from the high failure fraction lots are presently installed at Surry and North Anna. Existing plant procedures do not require that a basis for continued plant operation be prepared for these particular transmitters.
Page 4 of 7
e e The transmitters perform the following functions:
North Anna 1 Component Cooling Cont. air cooling water flow Chemical and Volume Control RCS make up flow North Anna 2 Chemical and Volume Control RCS make up flow Feedwater Steam generator level Reactor Coolant RTD bypass flow Surry 1 Chemical and Volume Control RCP seal delta P Chemical and Volume Control RCP seal delta P .
Chemical and Volume Control Volume Control Tank level Feedwater Steam generator level Surry 2 Chemical and Volume Control Volume Control Tank level Chemical and Volume Control Volume Control Tank level Main Steam Steam generator pressure Main Steam Steam generator pressure
REPORTING REQUIREMENTS NRC Bulletin 90-01 requires that each licensee provide identifying reporting in addition to that in the above five (5) items. The item numbers used below correspond with the Bulletin items which require a response that:
1 a) Confirms that Items 1, 2, 3, 4, and 5 of Requested Actions for Operating Reactors have been completed.
Response
The requested actions have been completed except for a portion of Item 4, which will be done by 9/1 /90.
1 b) Identifies the indicated manufacturer; the model number; the system the transmitter was utilized in; the approximate amount of time at pressure; the corrective actions taken; and the deposition (e.g., returned to vendor for analysis) of Rosemount Model 1153 Series 8, Model 1153 Series D and Model 1154 transmitters that are believed to have exhibited symptoms indicative of loss of fill-oil or have been confirmed to have experienced a loss of fill-oil. This should include Model 1153 Series 8, Model 1153 Series D and Model 1154 transmitters manufactured after July 11, 1989.
Response
There are no transmitters currently installed at Surry or North Anna which are believed to or have been confirmed as having a loss of fill-oil. Two transmitters at Surry which may exhibit symptoms of fill-oil loss, are being closely monitored for any output signal trending.
A North Anna Unit 1 safety injection flow transmitter, Rosemount model number 1153HB6PA, which was replaced in March, 1990, is believed to have lost fill-oil. The transmitter operated for approximately 1095 days at about 3000 psi. The problem was discovered during routine calibration.
Due to contamination, the device was not shipped to Rosemount, however tests were done in accordance with Rosemount instructions. Based on results of these tests, Rosemount informed us that they believe the failure was due to loss of fill-oil. The transmitter has been disposed of.
1c) Identifies the system in which the Model 1153 Series 8, Model 1153 Series D, and Model 1154 transmitters from the manufacturing lots that have been identified by Rosemount as having a high failure fraction due to loss of fill-oil are utilized and provides a schedule for replacement of these transmitters which are in use in the reactor protection or engineered safety features actuation systems.
Page 6 of 7
Response
Of the transmitters identified as being from high failure fraction lots eight are installed at Surry Power Station and five at North Anna. These transmitters are not used in the reactor protection system, engineered safety features
- actuation systems or systems installed in accordance with 10 CFR 50.62 (the ATWS Rule).
At Surry, five transmitters are in the Chemical and Volume Control System, two are in the Main Steam System and one is in the Feedwater System. At North Anna, two are in the Chemical and Volume Control System and one is in each. of the Component Cooling, Feedwater and Reactor Coolant Systems.
- 2. Model 1153 Series B, Model 1153 Series D and Model 1154 transmitters that, subsequent to providing the response required by Item 1 above, exhibit symptoms of loss of fill-oil or* are confirmed to have experience a
- loss of* fill-oil should be reviewed for reportability under existing NRC regulations. If determined not to** be reportable, addressees are requested to document and maintain, in accordance with existing plant procedures, information consistent with that requested in . Item 1b) above for each transmitter identified.
Response
Transmitters of the above model and series identification which exhibit symptoms of loss of fill-oil or which are confirmed to have experienced a loss of fill-oil shall be reviewed for reportability, under existing NRC regulations.
If determined not to be reportable, documentation will be maintained in accordance with existing plant procedures and in a format consistent with that required in Item 1b. -
Page 7 of 7