ML19210D125

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Jul 1978
ML19210D125
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200559
Download: ML19210D125 (2)


Text

.

VIRGINIA ELECTRIC AND POWER COMPAtlY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT M0ilTH Julv YEAR 1978 (Revised 11-05-79)

SUBMITTED:

'ND

.t A nA SUPERINIEJJ0Eili - OPERATIONS APPROVED:

/M[d MANAGER 1367 294 7911200 6 9

OPERATING DATA REPORT DOCKET NO. 50-338 nArE 11-5-79 CC',1PLETED BY "h. P

_Q3) Madison 897 6151 TELEPHONs e

pFERATING STATUS

f. orth Anna Notes
1. Uru. N.ame:

t

2. Reportin.; Period: July 1978 Re.*ised) 2775
3. Ucenxd Thermal Po -er (MWt):

gTJ

4. N:mepla:: Rating (G:ou MWe):

90/

5. G&w.n Elec:ri.:a! Ratina (Net MWe):

923

6. M ni:ntun Dependable Capacity (Gross 51We):

898

7. Muncu.s Dependable Capacity (Net MWe):
8. If Cian;es Ouur in Ca;ndty Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Puer Lo-I Tu WR

'3 :3:ricted,If Any (Net MWe -

N/A l/A'

10. Raw.,5 Nr Restrkthn.s. !f Any-This Month

_._.___ Yr. ;u-D a te Cumulative 744 1,344 1,344

11. H(u.m in Reporting PeFod

'N. 9 1.292 1.2G?

12. Nember Of Ho.t., nr.c or Es Critical l9 0 22:_4 22.4
13. R r.cror P: - ~ % d.a mi Hor
14. Iloart 0. n.- O, i

.,e f@7.6 1.2813 ___

1 JPM 0

0 0

15. Unit R:e: Shutd..-a Houn

.l, 3,233,732 3,?33,712 l'7kl.{#

16. Cnm Thr nal Energy Genemt-d (MWH) 1.041,315

_].041.115

17. Crow Electrimd Energy Generate,I(MWH)
13. Net Gecem:.-aergy Generated (MWH) 522,770 971.878 971.878.,
19. Unit Sen% ; r.:or 9?.4 95.5 95.rL 9? 4 95.5 95._
20. Unic Ananty stor
21. Unic Capdty Factor (Using'10C Net) 73.2 80.5 80.5 77-79 7 79.7_
22. Unit Capt.:cy Extor (Usuu DER Net) 0.9 0.8 0.8
23. Unic For ed o. ye R,r-
24. Shunt %ns Scheduled over Next 6 Months (Type.Date.and Duration of Each):

(Sothber Inspection - Exact Date Unknown - 1 week)

25. If Shur f>>wn At End Ot Report Period. Estimated Date of Startup:

~

26. Units in Test Status (Pnor to r. mne:cial Operation):

Forecast Achiev ed IN! TLA L Cal t'!CA t.1TY I.Nirp.L ELEC FRICITY COMMOCfAL OPER ATION I %7 295 m,