ML19210D125
Jump to navigation
Jump to search
| ML19210D125 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 11/05/1979 |
| From: | Wil Madison VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML19210D121 | List: |
| References | |
| NUDOCS 7911200559 | |
| Download: ML19210D125 (2) | |
Text
.
VIRGINIA ELECTRIC AND POWER COMPAtlY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT M0ilTH Julv YEAR 1978 (Revised 11-05-79)
SUBMITTED:
'ND
.t A nA SUPERINIEJJ0Eili - OPERATIONS APPROVED:
/M[d MANAGER 1367 294 7911200 6 9
OPERATING DATA REPORT DOCKET NO. 50-338 nArE 11-5-79 CC',1PLETED BY "h. P
_Q3) Madison 897 6151 TELEPHONs e
pFERATING STATUS
- f. orth Anna Notes
- 1. Uru. N.ame:
t
- 2. Reportin.; Period: July 1978 Re.*ised) 2775
- 3. Ucenxd Thermal Po -er (MWt):
gTJ
- 4. N:mepla:: Rating (G:ou MWe):
90/
- 5. G&w.n Elec:ri.:a! Ratina (Net MWe):
923
- 6. M ni:ntun Dependable Capacity (Gross 51We):
898
- 7. Muncu.s Dependable Capacity (Net MWe):
- 8. If Cian;es Ouur in Ca;ndty Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Puer Lo-I Tu WR
'3 :3:ricted,If Any (Net MWe -
N/A l/A'
- 10. Raw.,5 Nr Restrkthn.s. !f Any-This Month
_._.___ Yr. ;u-D a te Cumulative 744 1,344 1,344
- 11. H(u.m in Reporting PeFod
'N. 9 1.292 1.2G?
- 12. Nember Of Ho.t., nr.c or Es Critical l9 0 22:_4 22.4
- 13. R r.cror P: - ~ % d.a mi Hor
- 14. Iloart 0. n.- O, i
.,e f@7.6 1.2813 ___
1 JPM 0
0 0
- 15. Unit R:e: Shutd..-a Houn
.l, 3,233,732 3,?33,712 l'7kl.{#
- 16. Cnm Thr nal Energy Genemt-d (MWH) 1.041,315
_].041.115
- 17. Crow Electrimd Energy Generate,I(MWH)
- 13. Net Gecem:.-aergy Generated (MWH) 522,770 971.878 971.878.,
- 19. Unit Sen% ; r.:or 9?.4 95.5 95.rL 9? 4 95.5 95._
- 20. Unic Ananty stor
- 21. Unic Capdty Factor (Using'10C Net) 73.2 80.5 80.5 77-79 7 79.7_
- 22. Unit Capt.:cy Extor (Usuu DER Net) 0.9 0.8 0.8
- 23. Unic For ed o. ye R,r-
- 24. Shunt %ns Scheduled over Next 6 Months (Type.Date.and Duration of Each):
(Sothber Inspection - Exact Date Unknown - 1 week)
- 25. If Shur f>>wn At End Ot Report Period. Estimated Date of Startup:
~
- 26. Units in Test Status (Pnor to r. mne:cial Operation):
Forecast Achiev ed IN! TLA L Cal t'!CA t.1TY I.Nirp.L ELEC FRICITY COMMOCfAL OPER ATION I %7 295 m,