Revised Monthly Operating Rept for Aug 1978
ML19210D129
Person / Time
Site: North Anna 
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200564
Download: ML19210D129 (2)


Text

.

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Auoust YEAR 1978 (Revised 11-05-79)

SUBMITTED:

ND

[A.<&~

SUPERINTENDENT - OPERATIONS APPROVED:

W

/

MANAGER' 1120056f

b OPERATING DATA REPORT QOO 50-338 y \\.)

DOCKET NO.

DATE ll b74 C051PLETED BY W. R. Madison TELEPHONE (701)B21-5151 OPER.\\ TING STATUS North Anna Notes,

1. Unit Name:

August 1978 (Revised)

2. Reporting Period:

3.. Licensed Thermal Power (51Wt):

2775

4. Nameplate Rating (GrosiMWe):

947 907

5. Design E!cetrical Rating (Net MWe):

928

6. Maximum Depenable Capacity (Gross MWe):

090

7. S'aximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Thruugh 7) Since Last Report. Give Reasons:

N/A N/A

9. Power Level To which Restricted,If Any (Net MWe):
10. Reasons For Restriction.s. If Any:

N/A This Month Yr to-Date Cumulative

11. Hours in Reporting Period 744 2,088 2.088 2
12. Numb r Of Hours Reactor Was Critical 744 2,036 2,036 0

22.4 22.4

13. Reactor Reserve Shutdown Ifours
14. Ifours Generator On-Line 744 2,027.8 2,027_.8 0

0 0

15. Unit Reserve Shutdown Hours
16. Gross The mal Energy Generated (MWH) l,959,033 5.19L815 5.192.8185
17. Grou Electrical Energy Generated (MWH) 620,088 1.661.403 1.661.401 IS. Net Electrical Energy Generated (MWH) 581,045 1,552,923 1.552.923 100.0 97.1 97.1
19. Unit Service Factor
20. Unit Availability Fac:or 100.0 97.1 92,1___

87.0 82.8 8 t.3_

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 86.1 82.0 82.0 0.0 0.5 0.5
23. Unit Forced Outage Rat,
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

Scheduled, Sept. 22-29, 1978, Snubber Inspection & Misc. Maint.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY INI TIA L ELECTRICITY COMMERCIAL OPERATION 1367 297