Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project
ML20211B387
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/17/1999
From: Birckhead R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Pandey J
VIRGINIA, COMMONWEALTH OF
References
NUDOCS 9908240294
Download: ML20211B387 (2)


Text

_ - _ - _ - _ _ _ _ _ _ _

.h Innsbruxk Tnbuscal Center SIMMI thmunion il<nalet ard Glen Allen, \\'arginia 2.3060 i

August 17,1999 waamm en Mr. Janardan R. Pandey, P. E.

DEO - Valley Regional Office 4411 Early Road P. O. Box 1129 Harrisonburg, VA 22801 RE: Noith Anna Power Station - Service Water Reservoir

Dear Mr. Pandey:

As recently discussed in our telephone conversation, the service water system piping has experienced microbiologically-influenced corrosion and manganese pitting. Additionally, the concentrations of chlorides and manganese in the service water reservoir have increased over the years due to evaporative losses.

In order to control the concentrations and improve the water quality of the reservoir, we are seeking permission to routinely discharge from the service water reservoir to the waste heat treatment facility under our existing VPDES pennit through outfalls 108 and 103.

Our cunent VPDES permit provides for a discharge from the service water reservoir through outfall 108 (Service Water Overflow). This discharge was characterized in our most recent permit application as being either a reservoir overflow or the lake-to-lake mode of operation.

Outfall 108 flows to the circulating water tunnel that discharges to the waste heat treatment facility. The circulating water 'unnel flow is approximately one million gallons per minute per unit.

Additionally, our permit provides for a discharge from the clarifier through outfall gQ 103. The flow schematic included with our permit application shows the clarifier i V receiving flow from the service water reservoir. The clarifier also discharges to the circulating water tunnel.

Due to the high priority being placed on this project, discharges from the service water reservoir are scheduled to commence on September 7,1999. Therefore, we would appreciate hearing from you as soon as possible. If you have any questions or desire additional information, please call me at (804) 273-2992.

Since ly, Ron Birckhead l

Staff Engineer YOg

<0 9908240294 990817 PDR ADOCK 05000338 p

PDR

--\\

' cc:

U. S.' Nuclear Regulatory Commission Region ll

' Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 RE:

North Anna Units 1 and 2 Docket Nos. 50-338/50-339 License Nos. NPF-4/NPF-7 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 RE:

North Anna Units 1 and 2 Docket Nos. 50-338/50-339 License Nos. NPF-4/NPF-7 Mr. M.J. Morgan NRC Senior Resident inspector North Anna Power Station L