Text
&'
e e
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:
September 17, 1999 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 ADMINISTRATIVE LETTER 99-03 Serial No.:
99-442 NL&OS/MM Docket Nos.:
50-280/281 50-338/339 License Nos.: DPR-32/37 NPF-4/7 PREPARATION AND SCHEDULING OF OPERA TOR LICENSING EXAMINATIONS In response to Administrative Letter 99-03, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).
No new commitments are intended by this letter.
If you have any questions or require additional information, please contact Mr. John Hayden at (804) 273-2707.
Very truly yours, hu~ fJ/ l'/e~n+c, J. H. McCarthy, Manager Nuclear Licensing and Operations Support Attachments
/1
- e cc:
u~s. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St. SW, Suite 23 T85 Atlanta, Georgia 30303-3415 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station
NRC FORM 536 U.S NUCLEAR ULATORY COMMISSION APPROVED BY 0MB 150-0131 EXPIRES 07/31/2002 (7-1999)
Estimated burden fer res~onse to comply with this voluntary information collection request:
hour.
his information collection is used to plan budgets OPERAT.OR LICENSING and resources for operator examinations. Send comments refiarding burden estimate to the Records Management Branch (T-6 E6) U S Nuc ear Regulatory EXAMINATION DATA Commission, Washington, DC 20555-0001 or by internet email to bjs1@nrc.rv, and to the Desk Officer, Office of Information and Regulatory Affairs, N OB-10202, (3150-0131), Office of Management and Bud9et Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Surry Power Station Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2000 CY 2001 CY 2002 CY 2003 ESTIMATED NUMBER OF LICENSEE-PREPARED NRG/Licensee EXAMINATIONS Prepared NRC Prepared B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 2000 CY 2001 CY 2002 CY 2003 NUMBER OF REACTOR 7 8 OPERATORS NUMBER OF SENIOR REACTOR 2
OPERA TORS-INSTANT 2 NUMBER OF SENIOR REACTOR OPERA TORS-UPGRADE 3 4 NUMBER OF SENIOR REACTOR OPERA TORS-LIMITED PROPOSED DATES Est. to be weeks of Sept. 18-29 11/4; 11/18 PRIMARY DATE AL TERNA TE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2001 CY 2003 PROPOSED NUMBER FIRST SECOND (Oct)
FIRST SECOND (Oct)
ESTIMATED NUMBER OF 10 10 CANDIDATES NRC FORM 536 (7-1999)
PRINTED ON RECYCLED PAPER THIS FORM WAS DESIGNED USING INFORMS
e e
NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB NO 3150-0131 EXPIRES 07/31/2002 (7-1999)
Estimated burden fer res¥onse to comply with this voluntary information collection request:
hour.
his information collection is used to plan budgets OPERATOR Ll'CENSING and resources for operator examinations. Send comments re~arding burden estimate to the Records Management Branch (T-6 E6) U S Nuc ear Regulatory EXAMINATION DATA Commission, Washington, DC 20555-0001 or by internet email to bjs1@nrciov, and to the Desk Officer, Office of Information and Regulatory Affairs, N OB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION North Anna Power Station Region II A PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2000 CY 2001 CY 2002 CY 2003 ESTIMATED NUMBER OF NRG/Licensee LICENSEE-PREPARED NRG Prepared EXAMINATIONS Prepared B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 2000 CY 2001 CY 2002 CY 2003 NUMBER OF REACTOR 6
OPERATORS 6 NUMBER OF SENIOR REACTOR 1 1 OPERA TORS-INSTANT NUMBER OF SENIOR REACTOR 3 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES Est. to be weeks of Sept. 18-29 6/4; 6/11 PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2001 CY 2002 PROPOSED NUMBER FIRST (Apr)
SECOND FIRST SECOND (Oct)
ESTIMATED NUMBER OF 7
7 CANDIDATES NRC FORM 536 (7-1999)
PRINTED ON RECYCLED PAPER THIS FORM WAS DESIGNED USING INFORMS