Requests Regrading of RT Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted
ML20207C985
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/28/1999
From: Rasmey Robinson
External (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9906030165
Download: ML20207C985 (3)


Text

I s

4.

c f

?,

l '

May 28,1999 Director Division ofInspection Program Management Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

I am formally requesting a regrading of my written exam taken on April 8,1999. I am requesting this regrade based on the following reasons.

The answer given for question 18 (see enclosure) is based on training on the simulator. Our simulator is designed to mirror North Anna Unit 1. Many ofour technical questions whether JPM based, EOP driven or syst.sn related have been tested on and/or referenced to the simulator. For the purpose of training and testing the simulator is Unit 1. When a question begins," Unit 1 is at :100 percent power when.. " our

. answer as candidates has come from our experience on the simulator and knowledge gained from plant systems. No question ever begins, "On the simulator..." This response is ingrained and expected ofus.

The answer "c" is correct when based on the 225 steps (fully withdrawn) of the simulator. Upon which, as I have mentioned, we are trained to refer to as Unit 1. I do not feel the question was designed to test the candidate's knowledge of simulator / plant fidelity issues but, rather when given a temperature deviation and i

using knowledge the rod programming circuitry, could the candidate successfully comrute rod speed and ~

thus time to the all-out-position. There was no confusion, the same 225 step bank position was used that has accurately answered all other questions during the course of License Class. This included start up certification and final examinations. The variation to this question was that the time was to be given in seconds vice in the normal manner in which we are used to thinking which is minutes.

Again I can not make my point too strongly, the simulator is Unit 1. That is the simulation. To say that for on part of the training or examination it is Unit I and later it is not is unjust.

I respectfully request that answer "c" for question 18 be reconsidered as correct or that the question bc deleted.

I Sincerely,:

7 N

R. T. Robinson i

Enclosure f

l i

HDDS b 9906030165 990528 PDR ADOCK 05000338 V

PDR i

.p

~-

18.

VWin unit 1 operating at 100% power, the median Tave output fails to 578'F. If "D" bank started at 212 steps, which ONE of the following approximates how

- many seconds would elapse to reach the all rods out position on *D" bank indications? (Assume rod motion does not affect RCS temperature or reactor power),

a) 11.9 b) 13.7 c)'

97.5

' d) 112.5 l

],

North Anna RO Exam Rev.1

i Form ES-303-1 Operator LicGnsing Examination Report ES-303 U.S. Nuclear Regulatory Commission Operator Licensing Examination Report Docket Number 55-22327 Applicant's Name: Reginald T. Robinson i

R Examination Type (Initial or Retake)

Facility Name: N. Anna 1 & 2 X

Hot X

Reactor Operator Cold Facility Senior Reactor Operator (SRO) Instant BWR Description SRO Upgrade X

PWR l

SRO Limited to Fuel Hand!!ng I

Written Examination Summary NRC Author / Reviewer:

R. Baldwin Total Examination Points:

98 78 NRC Grader / Reviewer:

R. Baldwin Total Applicant Points:

79.6 %

Date Administered:

4/8/99 Applicant Grade:

l Operating Test Summary Date Administered: NA Administered by: NA NA

a. Administrative Topics NA
b. Control Room Systems and Facility Walk-Through NA
c. Integrated Plant Operations (Simulator Operating Test)

Examiner Recommendations Check Blocks Pass Fail Waive Signature Date

. L.-_ m m cndo sisaidwi ~

5/12/99 X

Written Examination

//Q' Qd3/'/7 X

Operating Test n c.a ~

Michael E. Ernstes 5/l3 /99 Final Recommendation

)[

License Recommendation Date issue License S

t e 5/ /) /99 j

old O. Christensen Deny License NUREG-1021 Page 1 of 1 Interim Rev. 8, January 1997

.