VIRGINIA ELECTRIC AtlD PO' DER COMPAtlY tl0RTH AtitlA P0' DER STATION MONTHLY
- OPERATING REPORT MONTH Anous t YEAR 1979 (llevised 11-05-79)
SUBMITTED:
'QO)
' K, _, ~..w.
SUPERINTENDENT - OPERATI0tlS APPROVED:
W ba~lw ff
]*
14ANAGER 1367 332 7911200 667
OPEllATING DATA REPOR T DOCKET NO. [A-23.0_ _
o
@D ]N, h
D A 1 E.l.l..ft-P1 9W g
CO31PLET ED ltY 1 A')hdir,og151
~i o
DI_E94 U
WG TELEPHONE OPERATING STATUS florth Anna Unit 1 Notes
- 1. Unit Name:
August 1979
[Revi d )
- 2. Reportia; Period:
27 F
- 3. Licened Thermal Power (SIWr):
- 4. Nameplat: Ratiag (Gron alWe):
9/t7
- 5. Design Electric 3111ating (Net SIWE):
9.07
- 6. Staximum Dependable Capu;ity (Groa SIWE):
928
- 7. Sf aximum Dependable Capacity (Net alwe):
898
- 8. If Chany, Occur in Capuity natiap (Ire: s Numb r 3 Through 7) Sine-tmt Iteport, Give Ilea>oni:
11lh
- 9. Power Level To bhich Restricted,If Any (Net 5tWe):
Il/A
- 10. Reasons For Ite3trictions. If Any:
ll/E This 'lonth
__ Yr. to Date Cumubtise 744 5,831 10,848
- 11. IIoun la Reportin Period
/
4,896.2 9,943
- 12. Number Cf floun iteactor Was Critical
- 13. Reactor R:sc.w Shutdown lioen 0
48.7 145.5
- 14. Ilours Generator On-Line 744 4_1819.3 S d7.1_
- 15. Unit Res. rve Shutdown Hours 0
0
- 0.. _,
- 16. Grow Thermal Ener;:y Generated (51WH) 2,044,_5_15
_lL94R l50
_25JtLM5_
- 17. Grou Electrica! Energy Generated (SIWH) 633 3.64 4,0')L183
__&,R00,55E__
2
- 18. Net Electr 21 Energy Genented (SIWH) 597,935 3,863,122 7,532,702
- 19. Unit Sers Factor 100_ _.__
n?. 6_.
87 2
- 20. Unit Avaii :nlity Factor 100
- 82Jt, 8L3
- 21. Unit capacity Factor (Usin;I 5f DC Net) 89.5 73.9 77.3.
88.6
- 22. Unit Capacity Factor (Using DER Net) 73.1 76.6 0
5.3 3.5
- 23. Ur.it Forced Gutage Rate
- 24. Shutdowns Scheduled Over Next 6 Sfonths (Type. Date.and Duration of Each):
Refueling; September, October, lloveraber and December:
12 weeks
- 25. If Shur Down At End Of Report Periost.Estirnated Date of Startup-IMA
- 26. Units in Test Status (Prior to Commercial Operation)-
Forec.nt Achieved INITI A L CRITICALI TY INITI AL ELECTRICITY C05151E!!CI AL OPERATION 1367 333