ML19210D152

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Aug 1979
ML19210D152
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200589
Download: ML19210D152 (2)


Text

.

VIRGINIA ELECTRIC AtlD PO' DER COMPAtlY tl0RTH AtitlA P0' DER STATION MONTHLY

  • OPERATING REPORT MONTH Anous t YEAR 1979 (llevised 11-05-79)

SUBMITTED:

'QO)

' K, _, ~..w.

SUPERINTENDENT - OPERATI0tlS APPROVED:

W ba~lw ff

]*

14ANAGER 1367 332 7911200 667

OPEllATING DATA REPOR T DOCKET NO. [A-23.0_ _

o

@D ]N, h

D A 1 E.l.l..ft-P1 9W g

CO31PLET ED ltY 1 A')hdir,og151

~i o

DI_E94 U

WG TELEPHONE OPERATING STATUS florth Anna Unit 1 Notes

1. Unit Name:

August 1979

[Revi d )

2. Reportia; Period:

27 F

3. Licened Thermal Power (SIWr):
4. Nameplat: Ratiag (Gron alWe):

9/t7

5. Design Electric 3111ating (Net SIWE):

9.07

6. Staximum Dependable Capu;ity (Groa SIWE):

928

7. Sf aximum Dependable Capacity (Net alwe):

898

8. If Chany, Occur in Capuity natiap (Ire: s Numb r 3 Through 7) Sine-tmt Iteport, Give Ilea>oni:

11lh

9. Power Level To bhich Restricted,If Any (Net 5tWe):

Il/A

10. Reasons For Ite3trictions. If Any:

ll/E This 'lonth

__ Yr. to Date Cumubtise 744 5,831 10,848

11. IIoun la Reportin Period

/

4,896.2 9,943

12. Number Cf floun iteactor Was Critical
13. Reactor R:sc.w Shutdown lioen 0

48.7 145.5

14. Ilours Generator On-Line 744 4_1819.3 S d7.1_
15. Unit Res. rve Shutdown Hours 0

0

0.. _,
16. Grow Thermal Ener;:y Generated (51WH) 2,044,_5_15

_lL94R l50

_25JtLM5_

17. Grou Electrica! Energy Generated (SIWH) 633 3.64 4,0')L183

__&,R00,55E__

2

18. Net Electr 21 Energy Genented (SIWH) 597,935 3,863,122 7,532,702
19. Unit Sers Factor 100_ _.__

n?. 6_.

87 2

20. Unit Avaii :nlity Factor 100
82Jt, 8L3
21. Unit capacity Factor (Usin;I 5f DC Net) 89.5 73.9 77.3.

88.6

22. Unit Capacity Factor (Using DER Net) 73.1 76.6 0

5.3 3.5

23. Ur.it Forced Gutage Rate
24. Shutdowns Scheduled Over Next 6 Sfonths (Type. Date.and Duration of Each):

Refueling; September, October, lloveraber and December:

12 weeks

25. If Shur Down At End Of Report Periost.Estirnated Date of Startup-IMA
26. Units in Test Status (Prior to Commercial Operation)-

Forec.nt Achieved INITI A L CRITICALI TY INITI AL ELECTRICITY C05151E!!CI AL OPERATION 1367 333

'"a