MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
.
VIRGINIA ELECTRIC Af1D POWER COMPANY f;0RTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH May YEAR 1979 (Revised 11-05-79)
SUBMITTED:
\D NC c,, 3 -
SUPERINTEi! DENT - OPERATI0flS APPROVED:
/ Add, MANAGER \J nr 1367 319 7911209 f&3
3 ,I g 7 g 'N {
L L, L 3 gL OPERAllNG DATA REPORT DOCKET No. 50-338 _ _
DATE lh5-79 CO.\lPLETED liY l!- R fiad.ison TELEPliONE (703-)M4-5151 OPERATING STATUS N<nes
- 1. Unit Name: North Anna. Unit 1
- 2. Reporting Period. thy '1979 (Revised) 777r;
- 3. Licenwd Thennal Power (.\lWt): *
- 4. Nameplate Rating (Gross 5f We): 9.47
- 5. Design Electrical Itating (Net 51We): 907
- 6. Staximum Dependable Capacity (Grow SIWE): 928
- 7. Maximum Dependable Capacity (Net 5f We). 898 ,
- 8. If Chaa;e> Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
l!/A
. N/A
- 9. Power Level To Which Restrie:ed,if Any (Net MWe)N/A
- 10. Reawas For Re3trictions,If Any:
This 5f onth _ Yr..to.Date Cumulatis e
- 11. IIours la Reporting Period 7,44 3,623 8,610
- 12. Number Of !!ours Reactor Was Critical 702.2 2,688.2 7,,735 _ ,
- 13. Reactor Reserve Shutdown !!ours TD 48.7 145.5
- 14. If ours Generator On.Line 0
I*d 2 'bU 2b _
- 15. Unit Reserve Shutdown !!ours O_ _ Q
- 16. Gross Thermal Energy Generated (MWif) 1,815,,373 _6,,97_1_,048 ]1,1 g ,g q _
- 17. Grow Elec:rical Energy Generated (MWii) 680,855__ , _ ,
2,2292 070 fbl29dQ7 IS. Net Electrical Energy Generated (MWif) 547,621 2_,10_0,101__ 5.2rd 4Bl_ _
- 19. Unit Service Factor 90.2 72.1 r /t 1
- 20. Unit Asailability Factor 90.2 72.1 84 .1._
- 21. Unit Capacity Factor (Usin; MDC Net) 82.0 64.6 74 ,l__
- 22. Unit Capacity Factor (Using DER Net) 81.2 63J_ ...13_. 6 ..
- 23. Unit Forced Outage Rate 6.0 9.3_ _ GJ_
- 24. Shutdowns Scheduled Over Nnt 6 Months (Type. Date and Duration of Each):
Reserve Station _ Service Tie-in; pos_si_b_ly iluly 1979; 10 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operatian): Forecast Achieved INITI \ L CRITICAL! rY INITIAL ELECTRICITY COMMERCIAL OPERATION 1367 520 (o/77 )
Page 1 of 2 -
UNIT SiiUTDOWNS AND POWER REDUCTIONS Dp r Anna 1 DATE --11-5-79 REPO R T ',10NIli May 1979 (Revised) hWSb COS[PLET EL p 3
, 17 _3Ei Licemee pr, -h1 Cause & Correet ne W Date :- *:i 2 3 hE3 l' vere
. v7 E? Attion to O j@ $ Report u E0 0 Present Recurrence d
6 79-6 THISSHUTCbWNWASCONCLUDED ON MAY 2, 1979 AT 0445 UHE i THE TURB [NE GENERATOR WAS PLACED IN SERVICE.
DURATION 29.7 HOURS.
79-7 790503 F 14.9 A* 3 NA NA NA Automatic Reactor / Turbine / Generator Trip due to S/G Low level with feed flow / steam flow mismatch. Reason in-sufficient feedwatcr flow when feedpump was tripped due to loss of oil flow.
Repaired broken oil line. Returned 79-8 790512 F 26.8 B* 1 NA NA NA Reactor & Turb. Gen. to service.
Unit shutdown by normal procedure to pdrf,orm 18 mo. periodic test surveillance on the safety injection system & mainte-nance on "C" steam generator level transmitter. Satisfactorily completed 79-9 790513 F 0.0* G* 1 NA NA NA testing & maintenance. Reactor trip T
._ due to operational error in biccking the source range high flux trip above u (i.=
os permissive P 6. Operator was instructed g N ,
, } to obeorvn P 6. Pnnetne ice enc Hrted I wi 3 4 @
N F: Forced S: Sched u!ed Reason:
A. Equipment Failure (Explain)
Method:
1 -Manual Exhibit G -Instructions for Preparation of Data g
B-Maintenance ci Test 2-Manual Scram. Entry Sheets for Licensee C-Refue!!n r 3- Automatic Scram- Event Report (LER) Fi:e (NUREG-D-Regulatdry Restnetion 4-Ot her ( Explain ) 0161)
E-Operator Training & License Examination c22a F-Administratise 5 Exhibit ! Same Source g
G Operational Error (Explain)
W/77) li-Othe r ( E xplain )
Page 2 of 2 0
UNIT SliUTDOWNS AND POWER REDUCTIONS na1 J[O crt DATE 11-5-70 COMPLETED BY U. R. 'iadison REPORT MON 111 May 1979 (Revised)
TELEPliONE _(103) 8%-5151
} [..eCf t\ee 't Q bJuSe b Co:"ee*1\C
- w. Da:e !3H 5g E
4 j=u j
frent Report u
- 'v 5! At t n.n to Preunt Ree ,rrerCe f _
- v: Ev 6
79-10 790513 F 0.0 G* 1 NA NA NA Turbine /Reacter Trip due to Hi-Hi stm Gen. "B" water level . L'hile attempting, to start up the unit too much water Y was added to "B" S/G & temp. caused 6 9 the water level to swell to the Hi-Hi (' 9 Level trip point. Restored level &
restarted the reactor. Instructed W
operations to feed the S/G carefully, p 9 79-11 790518 F 1.3 G* 3 NA NA NA yeactor/ Turbine / Generator trip from steam flow /fced flow mismatch & low S/G water level. Lost feedpump suction gg pressure when condensate was valved into the flash evaporatcr. The flash y evaporator was valved out & the reactor
& turbine generator then placed back g
in service. Significant couer rcductic b 79-12 790531 NA NA A* NA NA NA NA
'~~
of 20% of the average daily pcwer leve:y .
6 See Attached sheet.
Os N ! 2 3 4 F' ForecJ Reason: Method: Exhibit G -Instructiens v- S Se edu!cd A Equipment Fa!!ure (Explain) 1 -Manual for Preparation of Data N B-Maintenance of Test Manual Scram. Entr> Sheets for I.L. see N C-Rer :eling 3 Automatic Scram. E.ent Report (LER) Filz (NUREG.
D Regalatery Restriction 4-Other ( E xrtain ) 0161)
E-Operator Training & License Examination F-Administ rative 5 G-Operational Error (Explain) Estubit ! Same Source (9/77) !!-Ot her ( Explain )
Note: Number 79-11 continues into the month of June 1979 (Significant power level reduction) . .
Page 1 of 1 UtlIT SiluTDOWN AND POWER REDUCTIONS EXPLAMATION SHEET DOCKET fl0. 50-333 REPORT MONTH thy (PerisedylIT fiAME tiorth Anna YEAR 1979 DATE 11-5-79 COMPLETED BY W. R. t%DISON 79-7 (A) A broken oil line to the (B) Feed Pump flotor caused a low oil pressure trip of the feed pump.
79-8 (B) As an initial condition of 1-PT-83.1 and 1-PT-83.2 (Simulated blackout and safety injection of 1H and lJ busses, the unit was removed from service and the reactor shutdown to Mode 3, during the shutdown maintenance was performed on "C" S/G level transmitter.
78-9 (G) Unit was not in service. In the course of a Rx startup, the operator failed to block the source range high flux Rx Trip (PG).
79-10 (G) Turbine Trip / Reactor trip when too much water was added to the steam generators causing "B" S/G to swell to the !!i-Hi Level Trip point.
79-11 (G) Reactor / Turbine / Generator Trip from steam flow / Feed flow mismatch and low S/G water level.~ When condensate was valved into the flash evaporator to increase plant performance, differential pressure created across the heat exchanger caused feedpump suction press to decrease causing feed flow to decrease to the point where S/G level could not be maintained.
79-12 A High bearing temperature on "C" main feedpump required a reduction in megawatt load when the feedpump was removed from service.
1367 123