VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANtlA POWER STATION MONTHLY OPERATING REPORT MONTH March YEAR 1979 (Revised 11-05-79)
SUBMITTED:
\\D dk ce..n-SUPERINTENDENT - OPERATIONS APPROVED:
MANAGER U 1367 513 von 2005F/
OPERNIING DATA REPORT 50-238 F
DOCKET NO.
h b
C051PLET $
.R flidison D
TELEPlf0NE (701)_B9A-5151 OPERATING ST \\TUS florth Anna Unit 1 Notes
- 1. Unit Name:
liarch 197 F(Revised)
- 2. Reporting Period:
- 3. Licen,ed Thenaal Power (SIWt):
2775
- 4. Nameplate Rating (Grou 31We)-
947 907
- 5. Design Electrical Rating (Net 51We):
- 6. 31.uimum Dependable Capacity (Gross 51We):
- 7. Sinimu:n Dependab!e Capacity (Net 51We):
898
- 8. If Changes Occur in Capacity Ra:ings (Items Number 3 Through 7) Since Last Report.Give Iteason>:
fi/A
- 9. Power Level To Which Retriered,If Any (Net StWe):
ft/A
- 10. Rea3ons For Restrictions,If Any:
fi/A e.,,4 This 5f onth
... Yr..to.Da t e Cumulatis e
- 11. ilours in Repor:ing Period 744 2,160 1,177
- 12. Number Of Hours Reactor Was Critical 731 _
l,981. P.
6,6,68 _
- 13. Reactor Rewrve Shutdown Hours 8.5 36.9 133.7
- 14. Ilours Generator On-Line 64R 0 1.9AD Fi;59 R
- 15. Unit Reserve Shutdown llours 0
0 Q_,
- 16. Gross Thermal Ener;;y Generated (31WH) 1,844.166 5,155,675
.llJ52.M0__
- 17. Gross Electrical Enecy Generated (31Wil) 591J3R_._. 1,648.215 EdlR.652._
- 18. Net E! ctrical Enecy Genented (31WH) 559,410
_1_t_51280
_5.217.860 S
- 19. Unit Service Factor 93.9 _
89,8 91.fj
- 20. Unit Availability Factor 93.9 89.8 91.8
- 21. Unit Capacity Fae:or (Using SIDC Net) 83.7 8 0_. l.____
81.0
- 22. Unit Capacity Factor (Using DER Net) 82.9 79.3__
80.2
- 23. Unit Forced Outage Rate 6.1 10.2 4.3_
- 24. Shutdowns Scheduled Over Next 6 31onths (Type. Date,and Duration of Each):
Snubber Inspection April 1979. 1 week
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: _. April lO. 1474
- 26. Units In Test Status (Prior to Commercial Operation):
Foreca>t Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY CO.\\1NIERCIAL OPER ATION 1367
.514 (o/77)
.-