VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANtlA POWER STATION MONTHLY OPERATING REPORT MONTH March YEAR 1979 (Revised 11-05-79)

SUBMITTED:

\D dk ce..n-SUPERINTENDENT - OPERATIONS APPROVED:

MANAGER U 1367 513 von 2005F/

OPERNIING DATA REPORT F DOCKET NO. 50-238 D

h b C051PLET $ .R flidison TELEPlf0NE (701)_B9A-5151 OPERATING ST \TUS

1. Unit Name: florth Anna Unit 1 _

Notes

2. Reporting Period: liarch 197 F(Revised)
3. Licen,ed Thenaal Power (SIWt): 2775
4. Nameplate Rating (Grou 31We)- 947 '
5. Design Electrical Rating (Net 51We): 907 ,
6. 31.uimum Dependable Capacity (Gross 51We):
7. Sinimu:n Dependab!e Capacity (Net 51We): 898
8. If Changes Occur in Capacity Ra:ings (Items Number 3 Through 7) Since Last Report.Give Iteason>:

fi/A

9. Power Level To Which Retriered,If Any (Net StWe): ft/A
10. Rea3ons For Restrictions,If Any: fi/A e.,,4 This 5f onth . .. Yr..to.Da t e Cumulatis e
11. ilours in Repor:ing Period 744 2,160 1,177
12. Number Of Hours Reactor Was Critical 731 _ l ,981. P. 6,6,68 _
13. Reactor Rewrve Shutdown Hours 8.5 36.9 133.7
14. Ilours Generator On-Line 64R 0 1.9AD Fi;59 R
15. Unit Reserve Shutdown llours 0 0 Q_,
16. Gross Thermal Ener;;y Generated (31WH) 1,844.166 5,155,675 .llJ52.M0__
17. Gross Electrical Enecy Generated (31Wil) 591J3R_._. 1,648.215 EdlR.652._
18. Net E! ctrical Enecy Genented (31WH) 559,410 _1_t_51280 S _5.217.860
19. Unit Service Factor 93.9 _ 89,8 91.fj
20. Unit Availability Factor 93.9 89.8 91.8
21. Unit Capacity Fae:or (Using SIDC Net) 83.7 8 0_ . l.____ 81.0
22. Unit Capacity Factor (Using DER Net) 82.9 79.3__ 80.2
23. Unit Forced Outage Rate 6.1 10.2 4.3_
24. Shutdowns Scheduled Over Next 6 31onths (Type. Date,and Duration of Each):

Snubber Inspection April 1979. 1 week

25. If Shut Down At End Of Report Period. Estimated Date of Startup: _. April lO. 1474
26. Units In Test Status (Prior to Commercial Operation): Foreca>t Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY CO.\1NIERCIAL OPER ATION 1367 .514 (o/77)

. .-