VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANtlA POWER STATION MONTHLY OPERATING REPORT MONTH March YEAR 1979 (Revised 11-05-79)

SUBMITTED:

\\D dk ce..n-SUPERINTENDENT - OPERATIONS APPROVED:

MANAGER U 1367 513 von 2005F/

OPERNIING DATA REPORT 50-238 F

DOCKET NO.

h b

C051PLET $

.R flidison D

TELEPlf0NE (701)_B9A-5151 OPERATING ST \\TUS florth Anna Unit 1 Notes

1. Unit Name:

liarch 197 F(Revised)

2. Reporting Period:
3. Licen,ed Thenaal Power (SIWt):

2775

4. Nameplate Rating (Grou 31We)-

947 907

5. Design Electrical Rating (Net 51We):
6. 31.uimum Dependable Capacity (Gross 51We):
7. Sinimu:n Dependab!e Capacity (Net 51We):

898

8. If Changes Occur in Capacity Ra:ings (Items Number 3 Through 7) Since Last Report.Give Iteason>:

fi/A

9. Power Level To Which Retriered,If Any (Net StWe):

ft/A

10. Rea3ons For Restrictions,If Any:

fi/A e.,,4 This 5f onth

... Yr..to.Da t e Cumulatis e

11. ilours in Repor:ing Period 744 2,160 1,177
12. Number Of Hours Reactor Was Critical 731 _

l,981. P.

6,6,68 _

13. Reactor Rewrve Shutdown Hours 8.5 36.9 133.7
14. Ilours Generator On-Line 64R 0 1.9AD Fi;59 R
15. Unit Reserve Shutdown llours 0

0 Q_,

16. Gross Thermal Ener;;y Generated (31WH) 1,844.166 5,155,675

.llJ52.M0__

17. Gross Electrical Enecy Generated (31Wil) 591J3R_._. 1,648.215 EdlR.652._
18. Net E! ctrical Enecy Genented (31WH) 559,410

_1_t_51280

_5.217.860 S

19. Unit Service Factor 93.9 _

89,8 91.fj

20. Unit Availability Factor 93.9 89.8 91.8
21. Unit Capacity Fae:or (Using SIDC Net) 83.7 8 0_. l.____

81.0

22. Unit Capacity Factor (Using DER Net) 82.9 79.3__

80.2

23. Unit Forced Outage Rate 6.1 10.2 4.3_
24. Shutdowns Scheduled Over Next 6 31onths (Type. Date,and Duration of Each):

Snubber Inspection April 1979. 1 week

25. If Shut Down At End Of Report Period. Estimated Date of Startup: _. April lO. 1474
26. Units In Test Status (Prior to Commercial Operation):

Foreca>t Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY CO.\\1NIERCIAL OPER ATION 1367

.514 (o/77)

.-