Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 1999-09-08
[Table view] |
Text
e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 12, 1999 United States Nuclear Regulatory Commission Serial No. 381 Attention: Document Control Desk NL&OS/GDM R1' Washington, D.C. 20555 Docket Nos. 50-280, 281 50-338, 339 License Nos. DPR-32, 37 NPF-4, 7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA AND SURRY POWER STATIONS UNITS 1 AND 2 ASME SECTION XI INSERVICE INSPECTION PROGRAM REQUEST FOR APPROVAL-CODE CASES N-532 AND N-619 Pursuant to the provisions of 10CFR50.55a(a)(3), North Anna and Surry Power Stations Units 1 & 2 request the use of Code Cases N-532, "Alternative Requirements to Repair and Replacement Documentation Requirements and lnservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000," and N-619, "Alternative Requirements for Nozzle Inner Radius Inspections for Class 1 Pressurizer and Steam Generator Nozzles." Neither code case is currently endorsed by Regulatory Guide 1.147 (Revision 12), however, these two code cases will provide an acceptable level of quality and safety.
Attachments 1 and 2 provide detailed information supporting the request to use Code Cases N-532 and N-619, respectively. Attachment 2 also includes a technical white paper that provides further technical information for the elimination of pressurizer and steam generator nozzle inner radius inspections. Inspection data from both Surry and North Anna were included in the development of the white paper.
Approval to use Code Case N-532 is being requested as an alternative to Code requirements since it would provide an acceptable level of quality and safety consistent with 10 CFR 50.55a(a)(3)(i). The use of Code Case N-532 was previously approved by the NRC for Wolf Creek Generating Station in a letter dated February 9, 1996.
Approval to use Code Case N-619 is being requested as compliance with the specified Code requirement would result in a hardship without a compensating increase in the level of quality and safety.
If you have any questions or comments, please contact us.
Very truly yours,
~:af11 Vice President - Nuclear Engineering and Services
- -9910210056 991012 -- -~------------,
PDR ADOCK 05000280 G PDR
Commitments contained in this letter: None Attachments cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station Mr. M. J. Morgan .
NRG Senior Resident Inspector North Anna Power Station Mr. R. Smith Authorized Nuclear Inspector Surry Power Station Mr. M. Grace Authorized Nuclear Inspector North Anna Power Station
ATTACHMENT 1 REQUEST TO USE CODE CASE Na532 NORTH ANNA AND SURRY POWER STATIONS UNITS 1 AND 2 I. Identification of Components Pressure retaining components that are Class 1, 2 or 3, and piping of high safety significance as defined in the Surry Unit 1 risk informed inservice inspection program.
- 11. Current Code Requirements North Anna Unit 1 is currently completing the second inspection interval using the 1983 Edition with the Summer 1983 Addenda of ASME Section XI. It has started the third interval using the 1989 Edition of ASME Section XI. North Anna Unit 2 is currently completing the second inspection interval using the 1986 Edition of ASME Section XI. Surry Units 1 and 2 are GUrrently in the second period of the third inspection interval and both are using the 1989 Edition of ASME Section XI. Surry Unit 1 has an approved risk informed inservice inspection program for piping, which has committed it to reporting high safety significant piping regardless of code classification in addition to the Code requirements. Each of these programs currently report ASME Section XI repairs, replacements, and inservice inspections in accordance with IWA-4000, IWA-6000 and IWA-7000 with the exception of the Surry Unit 1 risk informed program
111. Basis for Request Code Case N-532 provides alternative reporting requirements that effectively reduce the administrative burden placed upon a nuclear unit by current Code requirements. These reports are currently required within 90 days following completion of a refueling outage. The alternative provided by Code Case N-532 extends reporting requirements to a period basis, or three times in ten years.
Additionally, the alternative reporting only requires a summary of the interval inspection status and significant events to allow more effective reporting.
The use of Code Case N-532 was previously approved by the NRC for Wolf Creek Generating Station in a letter dated February 9, 1996. The safety evaluation included in the NRC approval letter noted a clarification* to the term "corrective measures." It was noted that one use of the term involves Code required activities such as repair and replacement. The other use of the term involves maintenance activities such as tightening threaded fittings to eliminate leakage, torquing of fasteners to eliminate leakage at bolted connections,
e replacing valve packing due to unacceptable packing leakage, tightening loosened mechanical connections on supports, adjustment and realignment of supports, cleanup of corrosion on components from leakage, etc. It is our intent to use the same clarification proposed and accepted for Wolf Creek Generating Station, that is, the above first use of the term "corrective measures," and not the second. Code required activities such as repair and replacement would be applicable to Code Case N-532 paragraph 2(c).
IV. Alternative Proposed Apply Code Case N-532 with the corrective measure clarification to the North Anna Unit 1 second and third inspection intervals, the North Anna Unit 2 second inspection interval, the Surry Units 1 and 2 third inspection intervals and the Surry Unit 1 risk informed inservice inspection program for piping.
ATTACHMENT 2 REQUEST TO USE CODE CASE N-619 NORTH ANNA AND SURRY POWER STATIONS UNITS 1 AND 2 I. Identification of Components Class 1 nozzle inside radius sections for the pressurizer and the steam generators.
II. Current Code Requirements North Anna Unit 1 has started the third interval using the 1989 Edition of ASME Section XI. North Anna Unit 2 is currently completing the second inspection interval using the 1986 Edition of ASME Section XI. Surry Units 1 and 2 are currently in the second period of the third inspection interval and both use the 1989 Edition of ASME Section XI. The Code requires a volumetric examination each interval of each nozzle inside radius section (Category B-0, item numbers B3.120 and B3.140 Inspection Program B).
The Code requirements have been previously modified as follows:
North Anna Unit 1 Relief Request NDE-6 addressed the nozzle to vessel weld and the nozzle inside radius section of the pressurizer in the surge line area. It substituted a VT-2 examination during the normal system leakage test each refueling. Additionally, it noted the
- 1eakage monitoring and containment particulate radia.tion monitoring required by Technical Specifications. The relief request is still under NRG review for the third inspection interval, but a similar relief request was approved for the second interval by the NRG without conditions in a letter dated April 7, 1992. Note the code case only affects the nozzle inside radius section portion of the relief request.
North Anna Unit 2 Relief Request NDE-16 addressed the nozzle to vessel weld and the nozzle inside radius section of the pressurizer in the surge line area. It substituted a VT-2 examination during the normal system leakage test each refueling. Additionally, it noted the leakage monitoring and containment particulate radiation monitoring required by Technical Specifications. The NRG approved the relief request in a letter dated November 5, 1992 with the condition that a remote visual examination of the inner radius section (interior surface) be conducted in the same period that the ultrasonic inspection would be scheduled by the Code. Note the code case only affects the nozzle inside radius section portion of the relief request.
Surry Unit 1 Relief Request SR-002 addressed the nozzle inside radius section of the steam generators. It substituted the required volumetric examination with a VT-1 examination of the ID surface of the nozzle inside radius sections. The relief request was approved by the NRC in a letter dated July 19, 1995 with the condition that if a remote device is used that it have color capability. Relief Request SR-003 addressed the pressurizer nozzle inside radius section associated with the surge line area. It substituted the required volumetric examination with a VT-2 examination during the normally scheduled pressure test (Class 1) each refueling.
Surry Unit 2 Relief Request SR-002 addressed the nozzle inside radius sections of the steam generators. It substituted the required volumetric examination with a VT-1 examination of the ID surface of the nozzle inside radius sections. The relief request was approved by the NRC in a letter dated August 30, 1995 with the condition that if a remote device is used that it have color capability. Relief Request SR-003 addressed the pressurizer nozzle inside radius section associated with the surge line area. It substituted the required volumetric examination with a VT-2 examination during the normally scheduled pressure test (Class 1) each refueling.
111. Basis for Request V
A technical white paper supporting the Code Case approval at ASME has been prepared and is attached herein. Inspection data from Surry and North Anna were used in the development of the technical paper. The paper notes the following points in support of the code case:
- 1) After 25 years of industry operation no cracking incidents of any kind in the steam generator and pressurizer nozzle inne~ radius regions have been found.
- 2) Industry inspections to date have not revealed any indications.
- 3) Deterministic and probabilistic calculations performed supported the conclusion that it was highly unlikely that failure would occur under any anticipated service conditions.
- 4) The inspection is very difficult to perform due to access constraints.
- 5) Many of the affected nozzles are in a high radiation environment.
- 6) Elimination of the inservice inspections of the PWR pressurizer and steam generator nozzle inside radius sections were recommended for economic and health reasons, without any risk to structural integrity.
e A radiation exposure estimate was developed at North Anna Power Station for a ten-year interval requirement. The estimate assumes the current relief requests discussed above are in place and assumes the associated visual examinations result in negligible dose (remote device used). The estimate follows:
NORTH ANNA UNIT 2 MAN-REM ESTIMATE FOR ONE STEAM GENERA TOR NOZZLE INNER RADIUS EXAMINATIONS Work Task Man- Dose Man-Rem Hours Rate (hrs) (R/hr)
Insulation Remove/Install 20 0.017 0.340 Weld Prep. 0.5 0.150 0.075 HP Coverage 2.5 0.008 0.020 Nozzle Inner Radius 2.0 0.085 0.170 Inspection (UT)
(Welds 11 NIR and 12NIR)
Total Estimate = 0.605 NORTH ANNA UNIT 1 MAN-REM ESTIMATE FOR PRESSURIZER UPPER NOZZLE INNER RADIUS EXAMINATIONS Work Task Man- Dose Man-Rem Hours Rate (hrs) (R/hr)
Insulation Remove/Install 24 0.009 0.224 Weld Prep. 1.0 0.050 0.050 HP Coverage 2.5 0.004 0.010 Nozzle Inner Radius 4.0 0.022 0.090 Inspection (UT)
(Welds 10NIR, 11NIR, 12NIR, 13NIR, 14NIR)
Total Estimate = 0.374 Over ten years the North Anna steam generator exposure estimate would be multiplied by (3) generators and (2) units or 3.63 man-rem. The pressurizer exposure estimate would be multiplied by (2) units or 0.748 man-rem. The total exposure estimate at North Anna (both units) would then be 4.378 man-rem in ten
years. The Surry estimated dose savings would be lower due to their plant specific steam generator relief requests.
Considering the resultant exposure* in performing the examinations and the technical justification supporting the Code Case approval by ASME, .performing the required Code inspections would be considered a hardship without a compensating increase in the level of quality or safety.
IV. Alternative Proposed Apply Code Case N-619 for the North Anna and Surry steam generators and pressurizers. Approval of the code case would supercede previous relief requests substituting visual examinations for the nozzle inside radius sections. It would not affect Code required pressure testing and VT-2 examinations.