ML19210D130

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Sept 1978
ML19210D130
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200565
Download: ML19210D130 (2)


Text

.

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Sept.

YEAR 1978 (Revised 11-05-79)

SUBMITTED:

\\D

_d1.,,.L SUPERINTENDENT - OrtRATIONS APPROVED:

MANAGER "

1367 298 2911s0054 6

OPERATLNG DATA REPORT DOCKET NO.

DATE 11 W COMPLETED fly W. R. idadison TELEPliONE (703) 894-5151 OPERATING STATUS

? orth Anna Notes.

1. Unit Name:
2. Reportin3 eriod:

Septeraber 19/8 (iMvised)

P

3. Licenxd Thermal Power (5tWr):

2775

4. Nameplate Rating (Gross SIWE):

947

5. Design Electrical Rating (Net 51We):

907

6. Slaximum Dependable Capacity (Gross SlWe):

928 098

7. Slaximtun Dependable Capacity (Net SIWE):
8. If Changs Occur in Capacity Ratings (Items Number 3 Thmny.h 7) Since Last Report, Give Reasons:

fl/A

9. Power Level To Which Restricted,If Any (Net SIW-):

U/A

10. Reasons For Restrictions.lf Any:

b/b This 5fonth

._ Yr.-to-Date Cumulative

11. Hours in Reporting Period 720 2,808 2,808
12. Number Of Hours Reactor Was Criticaj 526.7 2,562.7 2,562.7
13. Reactor Reserve Shutdown Hours 1

23.4 23.4

14. Hours Generator On Line 526.4 2,554.2 2,554.2
15. Unit Rurve Shutdowrt Hours 0

0 0

16. Gron Thermal Energy Generated (MWH)

'1,436,384 6,629,199 6,629,199

17. Gr<ns Electrical Energy Generated (SiwH) 462.507
18. Net Electrical Energy Generated (MWH) 436,174 2.123.910 2.191_. 91L_

1.989.097

1. 0R 0. 091_
19. Unit Service Factor 73.1 91.0 91.. Q,
20. Unit Avaibbility Factor 73.1 91.0~

78.9 91.0

21. Unit Capacity F2ctor (Using MDC Net) 67.5 78.9
22. Unit Capadcy Factor (Using DER Net) 66.8 78.'l 78.1 0

0.4 0.4

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period Estimated Date of Startup:

Oct. 3, 1978

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICA LITY INIIIAL ELECTRICITY CO3tM ERCIAL OPERATION 1367 299

("/77)

.. -.