Revised Monthly Operating Rept for Sept 1978
ML19210D130
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200565
Download: ML19210D130 (2)


Text

.

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Sept. YEAR 1978 (Revised 11-05-79)

SUBMITTED:

\D _d1. ,,.L SUPERINTENDENT - OrtRATIONS APPROVED:

MANAGER "

1367 298 2911s0054 6

OPERATLNG DATA REPORT DOCKET NO.

DATE 11 W COMPLETED fly W. R. idadison TELEPliONE (703) 894-5151 OPERATING STATUS

1. Unit Name:  ? orth Anna Notes . .
2. Reportin3 Period: Septeraber 19/8 (iMvised)
3. Licenxd Thermal Power (5tWr): 2775
4. Nameplate Rating (Gross SIWE): 947 ' '
5. Design Electrical Rating (Net 51We): 907
6. Slaximum Dependable Capacity (Gross SlWe): 928
7. Slaximtun Dependable Capacity (Net SIWE): 098
8. If Changs Occur in Capacity Ratings (Items Number 3 Thmny.h 7) Since Last Report, Give Reasons:

fl/A

9. Power Level To Which Restricted,If Any (Net SIW-): U/A
10. Reasons For Restrictions.lf Any: b/b This 5fonth ._ Yr.-to-Date Cumulative
11. Hours in Reporting Period 720 2,808 2,808
12. Number Of Hours Reactor Was Criticaj 526.7 2,562.7 2,562.7
13. Reactor Reserve Shutdown Hours 1 23.4 23.4
14. Hours Generator On Line 526.4 2,554.2 2,554.2
15. Unit Rurve Shutdowrt Hours 0 0 0
16. Gron Thermal Energy Generated (MWH) '1,436,384 6,629,199 6,629,199
17. Gr<ns Electrical Energy Generated (SiwH) 462.507 _ _ . 2.123.910 2.191_. 91L_
18. Net Electrical Energy Generated (MWH) 436,174 1.989.097 1. 0R 0 . 091_
19. Unit Service Factor 73.1 91.0 91.. Q,
20. Unit Avaibbility Factor 73.1 91.0~ 91.0
21. Unit Capacity F2ctor (Using MDC Net) 67.5 78.9 78.9
22. Unit Capadcy Factor (Using DER Net) 66.8 78.'l 78.1
23. Unit Forced Outage Rate 0 0.4 0.4
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each): -
25. If Shut Down At End Of Report Period Estimated Date of Startup: Oct. 3, 1978
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INIIIAL ELECTRICITY CO3tM ERCIAL OPERATION 1367 299

("/77)

.. -. . . - .