Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML20209E3711999-07-0202 July 1999 Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML20196G2581999-06-23023 June 1999 Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20196G2211999-06-21021 June 1999 Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML20195J1391999-06-11011 June 1999 Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML20195C6601999-06-0101 June 1999 Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program ML20207C9851999-05-28028 May 1999 Requests Regrading of Rt Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML20206U7441999-05-20020 May 1999 Informs That NRC Unable to Conclude That NAPS Has Met Intent of Supplement 4 to GL 88-20.RAI Re Fire Area of IPEEE Encl. Response Requested within 90 Days of Submittal Date ML20207A8541999-05-20020 May 1999 Forwards RAI Re Licensee Listed Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 90 Days of Submittal Date ML20195B5381999-05-14014 May 1999 Forwards Rev 8,Change 2 to North Anna Units 1 & 2 IST Programs for Pumps & Valves. Summaries of Program Changes Provided for Each Unit IST Program.Relief Requests Have Been Removed from IST Programs ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML20206L4661999-05-10010 May 1999 Forwards SE Accepting Request to Delay Submitting Plant, Unit 1 Class Piping ISI Program for Third Insp Interval Until 010430,to Permit Development of Risk Informed ISI Program for Class 1 Piping 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML20195C6601999-06-0101 June 1999 Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML20207C9851999-05-28028 May 1999 Requests Regrading of Rt Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML20195B5381999-05-14014 May 1999 Forwards Rev 8,Change 2 to North Anna Units 1 & 2 IST Programs for Pumps & Valves. Summaries of Program Changes Provided for Each Unit IST Program.Relief Requests Have Been Removed from IST Programs ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML20206H0221999-05-0303 May 1999 Informs That Licensee Changes Bases for TS 3/4.6.1.2, Containment Leakage. Changes Allow Use of Other NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing.Ts Bases Page,Encl ML20206G9481999-05-0303 May 1999 Informs NRC That Insp of 58 Accessible safety-related Pipe Supports Completed in Response to NOV from Insp Rept 50-338/98-05 & 50-339/98-05.Commitments Made Include Plans to Perform Assessment of Welding & Welding Insp ML20205T1181999-04-16016 April 1999 Requests NRC Approval Prior to Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit.Nrc Concurrence with Irradiation Program Requested by End of June 1999 ML20205P1891999-04-0808 April 1999 Forwards ISI Program for Third ten-yr ISI Interval for North Anna Unit 1 for Class 1,2 & 3 Components & Component Support.Third ten-yr Insp Interval for North Anna Unit 1 Begins on 990501.Page 2-26 of Encl Not Included ML20205K3631999-04-0505 April 1999 Requests That Relief Request IWE-3 Be Removed from 980804 Relief Requests Submitted to Nrc.Subject Relief Request Was Inadvertently Retained in Attachment 1 for Unit 1 ML20205K2191999-04-0101 April 1999 Forwards Response to NRC 990106 RAI Re Util Summary Rept on USI A-46 Program,Submitted 970527.Calculations & Corrected Table 11.1-1,encl ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML20204H0331999-03-17017 March 1999 Forwards Rev 5 to PSP for Surry & North Anna Power Stations & Associated Isfsis.Description & Justification for Changes Included with Plan Rev.Rev 5 to PSP Withheld Per 10CFR73.21 ML20205E2701999-02-25025 February 1999 Forwards Rept on Status of Decommissioning Funding for North Anna Power Station,Units 1 & 2.Trust Agreement Between Old Dominion & Bankers Trust Co,Effective 990301,attached ML20207A8741999-02-25025 February 1999 Draft Response to NRC Telcon Re Licensee Request for Approval of LBB Evaluation in Support of Elimination of Augmented Insp Program on RCS Loop Bypass Lines.Response Justifies Use of Less than One Gpm Detectable Leakage Rate ML18152B5401999-02-11011 February 1999 Requests Relief from Specific Requirements of Subsection Iwl of 1992 Edition with 1992 Addenda of ASME Section Xi,Per 10CFR50.55a(a)(3) ML20203C8181999-02-0505 February 1999 Forwards Response to NRC 981217 Telcon RAI Re risk-basis of Nitrogen Accumulator Action Statement to Complete NRC Review of 951025 Proposed TS Changes 1999-09-27
[Table view] Category:UTILITY TO NRC
MONTHYEARML20065D5671990-09-20020 September 1990 Forwards Rev 15 to Security Personnel Training & Qualification Plan.Rev Withheld ML18153C3661990-09-20020 September 1990 Forwards Topical Rept VEP-NE-3-A, Qualification of WRB-1 CHF Correlation in VEPCO Cobra Code. ML20059H7391990-09-10010 September 1990 Forwards Rev 15 to ISFSI Nuclear Security Personnel Training & Qualification Plan.Rev Withheld ML20064A5201990-09-0707 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-15 & 50-339/90-15.Corrective Actions:Procedures Revised to Include Tolerance Bands for Temp Control Switch Setpoints & Involved Personnel Counseled ML20059H2931990-09-0707 September 1990 Advises of Review & Approval of ASME Section XI Inservice Insp Program Interval 1 Repair & Replacement Program Change to Applicable Code Edition & Addenda ML20059E5481990-08-31031 August 1990 Forwards Supplemental Info Re Deletion of Pressurizer Safety Valve Requirement During Mode 5.Current Tech Spec Requiring One Operable Safety Valve in Mode 5 Unnecessary & May Be Deleted ML18153C3451990-08-29029 August 1990 Forwards Proprietary Semiannual Fitness for Duty Program Performance Data Rept for 900103-0630.Rept Includes Summaries of Mgt Sanctions Imposed,Actions Taken to Correct Program Weaknesses & Events Reported to Nrc.Encl Withheld ML18153C3391990-08-22022 August 1990 Requests Approval for Use of Plugs Fabricated of nickel- chromium-iron Uns N-06690 Matl (Alloy 690) to Plug Tubes in Steam Generators for Mechanical & Welded Applications ML20063Q1241990-08-15015 August 1990 Provides Supplemental Info for 900115 Tech Spec Change Request Re Max Allowable Control Rod Drop Time.Retained DNBR Margin Tracked & Documented by Calculational Note ML20058N5941990-08-0808 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-11 & 50-339/90-11.Corrective Actions:Procedure Revised to Limit Applicablity to Small Refueling Cavity Leaks & Listed Evaluations & Revs Will Be Made to EOP ML18153C3171990-08-0101 August 1990 Resubmits Synopsis of Changes to Updated Operational QA Program Topical Rept Vep 1-5A ML18153C3101990-07-26026 July 1990 Forwards Decommissioning Financial Assurance Certification Rept..., Nuclear Decommissioning Trust Agreement & Nonqualified Nuclear Decommissioning Trust Amended & Restated Trust Agreement, Per 10CFR50.75 ML20055H5651990-07-20020 July 1990 Requests for Temporary Waiver of Compliance from Requirement of Tech Spec 3.3.1.1,Table 2.3-2 Re Response Time Testing. Request Does Not Pose Significant Hazards Consideration ML18153C2901990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Listed Transmitters Compiled.Transmitters Found Installed within Reactor Protection or ESFAS Have Been Replaced ML20055F9361990-07-16016 July 1990 Advises That No 30-day Rept Will Be Made Re Degradation of Seismic Support Bolts of post-accident Hydrogen Recombiners 1-HC-HC-1 & 2-HC-HC-1 ML20044B3501990-07-13013 July 1990 Forwards Monthly Operating Repts for June 1990 & Corrected May 1990 Rept Pages for North Anna Power Station ML20055E8121990-07-0909 July 1990 Requests Cancellation of Licenses Listed ML18153C2851990-07-0606 July 1990 Forwards Response to Generic Ltr 90-04 Re Status of Generic Safety Issues ML20055D4841990-07-0303 July 1990 Requests That Operator Licenses for Listed Individuals Be Cancelled.Licenses No Longer Required ML20055D4831990-07-0303 July 1990 Requests That Operator License for Bl Shriver Be Cancelled. License No Longer Required ML20055D7701990-06-29029 June 1990 Submits Supplemental Response to Violations Noted in Insp Repts 50-338/90-04 & 50-339/90-04 Re Failure to Take Timely Corrective Action for Repair of B Low Head Safety Injection Pump (1-SI-P-1B).No Addl Purchasing Procedure Required ML20043H9421990-06-21021 June 1990 Forwards Proprietary WCAP-12351, North Anna Unit 1 Evaluation for Tube Vibration Induced Fatigue, Per Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Rept Withheld (Ref 10CFR2.790) ML20043G5711990-06-15015 June 1990 Forwards Response to Request for Addl Info Re Insp Rept 50-339/89-20 Concerning Plant Safety Sys Outage Mod Insp. Response Withheld (Ref 10CFR73.21) ML20055C8661990-06-15015 June 1990 Forwards Application for Reissuance of NPDES Permit ML20043H1131990-06-15015 June 1990 Concludes That Removal of Temporary Loose Parts Monitoring Sys Does Not Increase Probability of Acccident,Create Possibility of New Kind of Accident & Does Not Reduce Margin of Safety ML20043G8731990-06-14014 June 1990 Discusses Evaluation of ASME Section XI Testing for Outside Recirculation Spray Pumps ML20043H2091990-06-13013 June 1990 Forwards List of Corrective Actions & Current Status in Response to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. ML20043F4531990-06-0808 June 1990 Forwards, Core Surveillance Rept for North Anna 2,Cycle 7 W/Extended License Burnup Limit. Rept Contains Specific Power Distribution Limits Applicable for Cycle 7 Operation W/Burnup Limit Extension ML18153C2501990-06-0808 June 1990 Confirms That Primary Policy Re Onsite Property Damage Insurance,Provided by Nuclear Mutual Limited ML20043D1661990-05-30030 May 1990 Requests Withdrawal of 860321 Request for NRC Review & Approval of Engineering Evaluations 7 & 8 Re App R Fire Protection Features at Plant,Based on Establishing 60-minute Interval Prior to Requiring Reentry Into Fire Area ML20042H0571990-05-11011 May 1990 Responds to NRC 900413 Ltr Re Violations Noted in Insp Repts 50-338/90-04 & 50-339/90-04.Corrective Actions:Leak Test Procedures Will Be Reviewed & Revised to Specify Appropriate Test Boundaries & O-ring Obtained ML20042G2081990-05-0808 May 1990 Forwards List of Issues Requiring NRC Review & Approval to Support Upcoming Plant Refueling Outages.Issues Include Tech Spec Change Request to Increase Fuel Enrichment to 4.3% & Use of Improved Westinghouse Fuel Assembly Design ML18153C1971990-04-24024 April 1990 Responds to Unresolved Items Noted in Insp Repts 50-338/89-12,50-339/89-12,50-280/88-19 & 50-281/88-19 Re Secondary Sys Containment Leakage & Concludes Leakage Need Not Be Quantified & Not Included in as-found Leakage ML18153C1671990-03-30030 March 1990 Submits Supplemental Response to 10CFR50.63, Loss of All AC Power. Understands That Load Mgt Schemes for Both Blackout & Nonblackout Units Allowed by Station Blackout Rule ML18151A2551990-03-30030 March 1990 Forwards Rev to, Corporate Emergency Response Plan & Rev to, Corporate Plan Implementing Procedures. ML20012E5331990-03-29029 March 1990 Requests That Operator License for Listed Individuals Be Cancelled Due to Termination of Employment ML18151A4941990-03-29029 March 1990 Forwards Listed Info Re Licensee Guarantees of Payment of Deferred Premiums,Per 10CFR140.21(e) ML20012D7551990-03-20020 March 1990 Forwards Nonproprietary WCAP-12266 & Proprietary WCAP-12265, North Anna Unit 2 Evaluation for Tube Vibration Induced Fatigue. Deferral of Potential Sentinel Plug Removal Workscope Requested.Proprietary Rept Withheld ML18153C1511990-03-19019 March 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47. Operability & Surveillance Requirements for Steam Generator Overfill Protection Sys Will Be Incorporated in Tech Spec Change ML20012B8171990-03-0909 March 1990 Advises That Util Plans to Simplify Plant Liquid Radioactive Effluent Sampling Sys to Increase Reliability & Reduce Exposure.Mods Expected to Occur by Apr 1990 ML20012C0091990-03-0808 March 1990 Forwards Topical Rept WCAP-12497, Analysis of Capsule U from VEPCO North Anna Unit 2 Reactor Vessel Radiation Surveillance Program. ML20012A0581990-03-0202 March 1990 Advises That Util Intends to Revise Emergency Diesel Generator Bushing Gap Measurement Insp Frequency to Each Refueling Outage in Order to Detect Extruded Bushings & Prevent Generator Failure ML18153C1261990-03-0101 March 1990 Responds to Generic Ltr 90-01 Re NRC Regulatory Impact Survey.Survey Covers Type of Insp,Audit or Evaluation by NRC Resident,Nrc Regional Ofc,Nrc Teams & INPO ML20011F6191990-02-26026 February 1990 Forwards Analysis of Small Steamline Break Performance W/O Low Pressurizer Pressure Safety Injection North Anna Units 1 & 2 & Proposed Amends to Licenses NPF-4 & NPF-7 Re Rupture of Main Steam Pipe Analysis ML20011F7451990-02-26026 February 1990 Forwards 1989 Annual Steam Generator Inservice Insp Rept,Per Tech Specs 4.4.5.5.b & 6.9.1.4 ML20006E5991990-02-19019 February 1990 Forwards Rev 3 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) ML20006E5971990-02-19019 February 1990 Forwards Rev 24 to Physical Security Program.Rev Withheld (Ref 10CFR73.21) ML20006E8141990-02-13013 February 1990 Requests Cancellation of Operator License OP-20521-1 for Jd Whitworth Due to Termination of Employment ML20011F5581990-02-0909 February 1990 Responds to NRC 900112 Ltr Re Violations Noted in Insp Repts 50-338/89-33 & 50-339/89-33 on 891211-15.Corrective Actions: Radiological Incident Rept Prepared to Document Release of Contaminated Equipment from Restricted Area ML20006D7021990-01-31031 January 1990 Suppls Response to 891211 & 22 Special Repts Re Inoperable Kaman Process Vent Radiation Monitors R1-GW-178 & R1-VG-179.Monitor R1-GW-178 Failed to Pass post-maint Calibr for Sample Flow & Will Not Be Returned to Svc by 900131 1990-09-07
[Table view] |
Text
{{#Wiki_filter:._. . _ _,
VIRGINIA ELECTRIC AND power COMPANY RICHMOND, VIRGINIA 23261 ,
May 11, 1990 ,
U.S. Nuclear Regulatory Commission Serial No. 00 226 Attn: Document Control Desk NAPS /JHL/TAH >
Washington, D.C. 20555 Docket Nos. 50-338 '
50 339 ,
License Nos. NPF 4 NPF 7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 '
INSPECTION REPORT NOS. 50 338/90 04 AND 50 339/90 04 '
RESPONSE TO THE NOTICES OF VIOLATION ;
We have reviewed your letter of April 13,1990 which refers to the inspection conducted at '
North Anna from February 17,1990 through March 16,1990 and reported in inspection Report Nos. 50 338 & 339/90-04. Our response to the Notices of Violation is attached. >
Also, we reviewed and concur with the discussion in the inspection Report pertaining to q the interpretation of the Technical Specifications on A. C. Electrical Distribution. We are currently processing a license amendment changing Technical Specifications 3.8.2.1.
This change willincrease the allowable time for an inverter to be out of service and will more closely conform to Standard Technical Specifications for Westinghouse Pressurized ;
Water Reactors. ;
We have no objection to this correspondence being made a matter of public record. If you have any further questions, please contact us.
Very truly yours, ,
W. L. Stewart Senior Vice President - Nuclear ,
Attachment i
cc: U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323 ;
Mr. M. S. Lesser NRC Senior Resident inspe.Jor North Anna Power Station
;8P 48aa 8888 & s a
PDC
. ~ _ . _ _ . _ _ . . - _
8]9/ :
( . . .
RESPONSE TO THE NOTICES OF VIOLATION fLEPORTED DURING THE NRC INSPECTION CONDUCTED BETWEEN FEBRUARY 17. 1990 AND MARCH 16. 1990 W INSPECTION REPORT NOS 50-338/90-04 AND- 50-339/90-04 NRC COMMENT Dunng the Nuclear Regulatory Commission (NRC) inspection conducted on February 17 -
March 16,1990,_ violations of NRC requirements were identified. In accordance with the
" General Statement of Policy and Procedure for NRC Enforcement Aci!ons," 10 CFR Part ,
2, Appendix C, (1990), the violations are listed below: j A. Technical Specification 6.8.4.a requires that a program be established, implemented and maintained to reduce leakage from those portions of systems outside v
containment that could contain highly radioactive fluids during a serious transient or '!
accident to as low as practical levels. The systems include the recirculation spray, safety injection, chemical and volume . control, gas stripper, and -hydrogen recombiners. The program shallinclude the following:- ,
p (i) Preventive maintenance and periodic visualinspection requirements,land (ii) Integrated leak test requirements for each shutdown at refueling cycle intervals or less.
Contrary to the above, the program required by Technical Specification 6.8.4.a was not established, in that the following:
- 1. An adequate preventive maintenance program has not been developed for those Grinnell valves located in radioactive fluid systems outside containment.
- 2. Adequate _ testing has not been conducted to identify and reduce leakage trom !
radioactive fluid systems outside containment, resulting in several personnel gas contaminations. ,_
This is a Severity Level IV violation (Supplement I)..
B. 10 CFR 50 Appr,ndix B Criterion XVI requires that measures shall be established to assure that conditions adverce to quality are promptly identified and corrected and '
that tile cause of significant conditions adverse to quality be determined and corrective action taken to preclude repetition.
Contrary to the above, a condition adverse to quality was not adequately corrected, and corredve action to preclude repetition and determination of the cause were not <
conducted in that, from June 1989 through March 1990,'several seal leaks continued l to be identified on the Unit 1 low head safety injection pump,1-SI P-18, without ,
satisfactory pennanent iesolution of the problem. In addition, with this history of seal problems, seal packages have not been maintained in. parts storage.
This is a Severity Level IV violation (Supplement I and applies to Unit 1.)
Page 1 of 6 i
- - - - __ - --. --.-.-.. e, , J
_g - -. --
4 l' .. ~w V {, .?' '
'NOV 50 338&339/90 04 ' -{
C. ' Technical' Specification 6.8.1.a requires written procedures : be established, implemented and maintained covering those activities contained in Appendix A:of Regulatory Guide 1,33; Revision 2,- February 1978.' This document addresses 1 j
radiation protection procedures. ;
1 c
l Mechanical maintenance procedure MMP-C-FL-5," Removal and Reinstallation of the - !
Reactor Coolant Filter", Revision 7, requires: (1) In a note in' step 5.1, that "Do not ;'
completely drain and vent the filter vessel until immediately prior to filter cover.
removal" and l2) In step 7.1.5, that the protection cask be positioned over the filter access hole before the cover is removed.
Contrary to the above, procedure MMP C-FL 5 was not implemented in that the following:
- 1. The filter was isolated at-1100 hours on Febtuary 26,1990, dralned and'ventsd at !
0730 hours and again at 1100 hours on February 27 -1990, but the filter removal process did not begin until approximately 1120 houtc cn Februar/ 27,1990. <
- 2. On February 27,1990, the protection cask was not place'd over the access hole until after the cover was removed.
These actions resulted in me contamination of seven personnel.
This is a Severity Level IV violation (Supplement I) and applies.to Unit 2.
BES,PONSE TO VIOLATION A
- 1. ADMISSION OR DENIAL OF_ THE ALLEGED VIOLATION-The violation is correct as stated. 1
- 2. REASON FOR THE VIOLATION The violation for an inadequate preventive maintenance program fo'r' Grinnell valves -
was caused by Maintenance Department Administrative Procedure (MD-ADM) 12.0-improperly requiring the replacement .of all Grinnell valve diaphragms and 0; rings at !
5 year intervals. The actual qualified lifetime of the valve ~ diaphragms and 0-rings is every 10 years but for conservatisrn the lifetime was shortened to every 5 years. - The remaining time incorporated-a :5 year shelf life for the materials. The procedural requirement to replace all Grinnell valve diaphragms and 0 rings was unachievable- J due to the large quantity of valves in the program and.the fact that a significant number of the valves are unaccessible during plant operations. ;
t e
3 t
Pago 2of 6
~
NOV 50 338&339/90 04 E
The violation for inadequate leak testing of systems _ outside containment that could contain radioactive fluids was caused by, inadequate-procedures and procedural control. Leak testing procedures did not adequately specify test boundaries and provide a mechanism to prevent changing . test boundaries without first obtaining the appropriate approvals.
r -
- 3. CORRECTIVE STEPS WHICH HAVE BEEN - TAKEN AND THE RESULTS' ACHIEVED
( l
, MD-ADM-12.0 was revised to establish the applicable criteria for including a Grinnell-
- - valve in the program. As a result, there has been a significant reduction in the
{ number of valves in the program.
T Since the revision of MD-ADM-12.0, the entire Grinnell valve diaphragm and 0-ring replacement program has been placed on . hold. The program hold is based on a t
recent report published by EPRI (NClG-13, Guidelines for Establishing, Maintaining 3 and Extendin0 the Shelf Life Capability of Limited Life items) that qualified the lifetime of the Grinnell valve diaphragms and O rings for at least 60 years.
i y Radioactive gas leaks in the auxiliary building have been repaired thus reducing the ;
number of personnel contamination events. Specifically, l
( - The gas leaks on the flow path from the level instrumentation for the Unit 1 and 2 Volume Control Tank have been repaired.
j i
g j
1
- Leaks on the Jow level waste tank vent into the auxiliary building have been i stoppcd. j
- Leaktesting of the gas stripper was performed and identified leaks were repaired. "
1 PT-57.8 was revised by procedure deviation to require that the primary grade water supply be isolated following gas stripper system pressurization so the pressure 1 7 decrease could be monitored. !
k 4
- CORRECTIVE STEPS WHICH WILL BE TAKEN1TO AVOID FURTHER VIOLATIDNS .
1 The vendor (Grinnell) was contacted to determine the qualified life of their valve i diaphragms and 0-rings. As a result, Grinnell stated that their valve ~ diaphragms and r O-rings have at least a 10 year lifetime, in addition, a report published by EPRI !
(NCIG-13, Guidelines for Establishing, Maintaining and Extending the' Shelf Life H Capability of Limited Life items) qualified the lifetime of the Grinnell valve diaphragms L
- and 0 rings for at least 60 years. The results of the EPRI report are being confirmed 1 by testing at Wyle Laboratories. Resumption-or permanent removal of the Grinnell Li E- ?
valve diaphragm and 0 ring replacement program will be contingent _upon the b
ongoing testing.
y Leak test procedures will_ be reviewed and revised, as necessary, to specify appropriate test boundartes. j
_ Page 3 of 6
. _ _ _ _ . _ . _ _ _ _ _ . _ _ . . . _ _ _. . .. .. ..~
NOV 50-338&339/90 d Appropriate precautions will be placed in leak test procedures to ensure the test- l boundaries are not changed without prior to use approval.
]
An evaluation ~ will be-- performed to establish criteria for performing' additional:
Inspections and testing when auxiliary building radioactive gas levels reach a pre-established value. g(
i
- 5. THE DATE WHEN FULL COMPLIANCE W1LL BE ACHIEVED ~l Testing to confirm the results of the EPRI report will be completed by August 1990. 3 The decision to resume or permanently delete the Grinnell valve diaphragm and O- ~
ring replacement program will be contingent upon the test results.
Leak test procedures will be reviewed and revised prior to their next scheduled a performance.
l 1
. The evaluation for estab"shing criteria for performing additional inspections and l testing when auxiliary building radioactive gas levels reach a pre-established 'v6!ue :l will be completed by August 1990. -
1 RESPONSE 'TO VIOLATION B ,
1
- 1. ADMISSION OR DENIAL OF THE ALLEGED VIOLATION The violation is correct as stated.
- 2. REASON FOR THE VIOLATION The violation was caused by a purchasing error. An 0-ring was the only part needed.
to perform the required maintenance on the Unit 1 B Low Head Safety-Injection Pump (1-SI-P-1B). Due to the purchasing error, the O-ring was oroere'd but the purchase >
order was cancelled by the vendor because the purchase order did not meet the minimum billing requirement of $100. The Purchasing Department failed to notify ,
management of the purchase order cancellation. '
A root cause evaluation was not previously performed because the leakage from the:
pump seal was believed to be insufficient to- affect pump operability. 1 -SI-P-1 B continued to meet the operability requirements of Technical Specification 4.6.2.2.1.b. Ei
- 3. CORRECTIVE STEPS : WHICH HAVE ' BEEN TAKEN A'ND THE -RESULTS ')
ACHIEVED 1 The O-ring to repair the 1-SI P-1B seal was obtained and maintenance on.the pump sealwas completed.1-SI P-1B was tested and returned to service on April 23,1990.
Page 4 of 6 i 1i
_ --. . . . . . . . ..m.
#* NOV 50 338&339/90-04 e A detailed failure analysis was performed on the 1-SI-P 1B. The failure analysis '
could not ' conclusively determine the cause of the seal leakage. A copy of the'
- detailed failure analysis report was provided to the NRC Resident inspector.
. An adequate supply of seal packages for future repair of the low head safety injection . ;
pumps are being maintained in storage.
- 4. CORRECTIVE STEPS ~ WHICH WILL BE . TAKEN :,TO AVOID FURTHER -
-VIOLATIONS
- A purchasing procedure will be developed to ' preclude the error of not-meeting the
- minimum requirements for t illing. In the interim, temporary corrective measures have been put in place to preclude the error of not meeting the minimum requirements for billing.
- 5. THE DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED
.i The purchasing procedure will be developed by June 1990.
+
RESPOl19E TO VIOLAT.IO. R_.Q d
- 1. ADMISSION OR DENIAL OF THE ALLEGED VIOLATION The violation is correct as stated. I
- 2. REASON FOR THE VIOLATION ,
The violation was due to personnel falling to follow the requirements of Mechanical Maintenance Procedure MMP-C-FL-5. The causeLof venting and draining the filter ,
-vessel prior to filter removal was the lack of communications between the Operations Department and the Maintenance and Radiation Protection Departments. Operations
, had vented and drained the filter vessel on the premise that maintenarme was ready to be performed in ac..a v, the radiation work permit had not. been prepared and-
! the pre-job briefing had n.x . '<en place. The cause of not placing the protection cask over the access hole ! the cover was removed was due to failure to follow-k procedure. Personnel failed to follow procedure because of the unavailability of tool extensions which would allow detensioning via the top of the cask.
.A contributing cause was that a reduced micron filter (2 microns) was being changed-due to a high pressure drop across the filter. Previous filter changeouts were on either 6 micron filters or 2 micron filters (due to radiation levels)._ MMP-C-FL-5 was not "
specific to a reduced micron filter changeout due to a high differential pressure across the filter. MMP-C-FL-5 did not establish appropriate radiological controls to change a reduced micron filter since additional radiological hazards would be introduced.- ,
4 Page 5 of 6 i a
+.
, ,. ..- NOV 50-3388339/90'-04 A possible cause for personnel getting contaminated during the filter changeout was p due to inadequate radiological surveys. Health Physics personnel obtained an air.
sample to assess the radiological conditions but did not field analyze the sample.
The _ air sample was analyzed after work activities were completed. Hot particle controls were not implemented during the filter changeout because of the anticipated damp condition of the filter, i
- 3. CORRECTIVE STEPS WHICH:HAVE BEEN TAKEN - AND THE RESULTS }
ACHIEVED #
Notifications of the personnel contamination event were voluntarily made to the State i of Virginia and subse'quently to the NRC in accordance with 10CFR50.72.
Personnel involved in the personnel contamination event met'with the Station Manager to. discuss the event and; establish appropriate: corrective actions. y Emphasis was placed on the importance of following procedures, p A Radiological incident Report on the personnel contaminations resulting from_the filter changeout was completed and approved by station management. As a result, .,
the following corrective actions have been implemented. :
1
- The potential impact of reduced micron filters on the job scope and radiologic'al i controls has been included in job planning,- RWP preparation / review and pre-job briefings. '
- Health Physics Technicians have been reinstructed to field analyze all air samples !
during filter changeouts, i 4
- MMP-C-FL 5 and other filter replacement procedures. have been revised to provide sufficient controls for filter replacement.
- 4. CORRECTIVE STEPS WHICH WILL BE TAKEN TO - AVOID FURTHER VIOLATIONS No further corrective actions are required.
u
- 5. THE DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED q l
Full compliance has been achieved. ~i q
l 1
Page 6 of 6
.I
;}}