Forwards ISI Program for Third ten-yr ISI Interval for North Anna Unit 1 for Class 1,2 & 3 Components & Component Support.Third ten-yr Insp Interval for North Anna Unit 1 Begins on 990501.Page 2-26 of Encl Not Included
ML20205P189
Person / Time
Site: North Anna Dominion icon.png
Issue date: 04/08/1999
From: Hartz L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205P192 List:
References
99-169, NUDOCS 9904200065
Download: ML20205P189 (2)


Text

,, u u

e VIRGINI A El.EcTaic ANI) POW E R CO%11% N Y Ramissosis, VIRGINI A 2.U61 April 8, 1999 U.S. Nuclear Regulatory Commission Serial No.99-169 Attention: Document Control Desk NL&OS/ETS R0 Washington, D.C. 20555 Docket No.

50-338 License No.

NPF-4 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 1 THIRD TEN YEAR INSERVICE INSPECTION PROGRAM in accordance with 10 CFR 50.55a(g), Virginia Elearic and Power Company Mmits the inservice inspection (ISI) program for the third ten-year inservice inspection interval for North Anna Unit 1 for Class 1,2 and 3 components and component supports. The program, included as Attachment 1 to this letter, describes the programmatic aspects of inservice examinations of components and component supports and system pressure tests. Consistent with NRC guidance, on December 21,1998 (Serial No.98-696), we requested a two year delay in the submittal of our third interval ISI Program for Class 1 piping (B-F and B-J) in order to develop a risk-informed ISI program. Therefore, the third interval ISI Program for Class 1 piping is not included in this submittal.

This program has been written in accordance with the requirements of the 1989 Edition of Section XI of the ASME Boiler and Pressure Vessel Code. However, the unit was not designed to completely meet the detailed inservice inspection requirements of Section XI. Therefore, we are requesting relief from certain inspection and testing requirements, which have been determined to be impractical.

Relief requests previously submitted in interval 2 are identified along with the NRC approval date. In accordance to 50.55a(g)(5), our requests for specific relief from the Code requirements are included in the attached program.

The North Anna Unit 1 inservice inspection program plan identifying the specific l

components and component supports selected for examination during the third interval is included as Attachment 2.

The system pressure test plan is also included as.

The third ten-year inspection interval for North Anna Unit 1 begins on May 1,1999. It is ng/

our intent to implement this revised inspection program for Class 1, 2 and 3

(

components and component supports at that time. To facilitate your review of our program, we will provide one set of reference drawings under separate cover to the NRC Project Manager.

I

, c a t) 99042oo065 99o400 PDR ADOCK 0500o338 em qt O. - -n

t The North Anna Unit 1 third intervalinservice inspection program and the relief requests have been reviewed and approved by the Station Nuclear Safety and Operation Committee.

l l

If you need any additional information, please contact us.

J Very truly yours, l

L. N. Hartz Vice President - Nuclear Engineering and Services i

Commitments made in this letter:

1.

There are no new commitments in this letter.

l Attachments cc:

U.S. Nuclear Regulatory Commission (w/out drawings) l Region 11 Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 l

Atlanta, Georgia 30303 i

Mr. M. J. Morgan (w/out drawings)

NRC Senior Resident inspector North Anna Power Station l