VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Jan.
YEAR 1979 (Revised 11-05-79)
SUBMITTED:
\\%
J'A cxA SUPERIflTENDENT - OPERATIONS APPROVED:
MANAGER ()
1367 7,06 7 911200 f7I
OPERATING DATA REPORT DOCKET NO. 50-338 DATE 11-5-79 D**D D
' 3
~
] (1, Co3!PLETED 11Y W. R. Madison
,J,}
TELEPflONE 703_ 894-5151 gj OPERATING STATUS Morth Anna Notes.
- 1. Unit Name:
nuaq Im WenseQ
- 2. Reporting Period:
- 3. Licenwd Thermal Power (51Wt):
2775
- 4. Nameplate Rating (Grod51We):
947 907
- 5. Design Electrical Rating (Net 51We):
- 6. 51aximum Dependable Capacity (Gross 51We):
090
- 7. Sf aximum Dependable Capacity (Net SIWE):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Though 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net 51We):
N/A
- 10. Reasons For Restrictions,if Any:
N/A This 51onth._ _ Yr..to.Date Cumulative
- 11. ilours In Reporting Period 744 744 5,761
- 12. Number of Flours Reac:or Was Critical 640.7 640.7 ~
5,327.5 0
0 96.8
- 13. Reactor Reserve Shutdown IIours 640./
640.7 5,292.4
- 14. Ilours Generator On-Line
- 15. Unit Reserve Shutdown flours 0
0 0
- 16. Grms Thermal Energy Gener::ed (31Wil) 1,710,165 1,710,165 13,906 960 2
- 17. Cross Elec:rical Ener;y Generated (SiWFI) 544,465 544,465 4,444,902 Sl 3,4TO 513,410 4.177,990
- 18. Net Electrical Energy Generated (51WH) 80.I 86.I 92.5
- 19. Unit Service Factor
- 20. Unit Availability Factor 86.1 86.1 92.5
- 21. Unit Capacity Factor (Using 51DC Net) 76.8 80Tti 76.8
- 22. Unit Capacity Factor (Using DER Net) 76.I 76.1 80.0 13.9 13.9 3.2
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Slonths(Type.Date.and Duration of Each):
Snubber Inspection April 1979, I week
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
February 3,1979
- 26. Units In Test Status (Prior to Commercial Operation):
Foreca>t Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY C05151ERCI AL OPERATION 1367
?)D7 ml
50-333 UNIT SHUTDOWNS AND POWER REDUCTIONS y
o
_ borth Anna ~
t DATE Il-S-79 REPORT MONT11 January 1979 (Revised)
COMPLETED BY __lL_R._Ea discn TELEPl!CNE (703) 894-5151
- =
No.
Date
._5 y
} h[f Licernee 5-r,
~
Cause & Corrective
,=
c Event u7 c2 Action to S
j@
-N 3 -j ]
Report :
A0
,! C Present Re.mtrence c
5 i
i I
79-01 790127 F
103.3 A*
1 LER/R0 79-012 CF VALVEX Manual reactor, turbine generator shutdown due to excessive unidenti-fied primary plant leakage.
Repacked MOV-1700 residual heat removal systun isolation valve, also outage was extended for other primary and secondary maintenance.
g GED E@
t b
2@
EB C::ta ul 3
4
& F: Forced Reason:
Method:
Exhibit G - Instructions N S: Scheduled A-Eqmpment Fai!ure (Explain) 1 -Manual for Preparation of Data B Maintenance of Test 2-Manual Seram.
Entry Sheets for Liecmee C Refueling 3-Automatic Seram.
Event Repo.t (LER) Fi!c lNUREG-so D Regulatory Restriction 4-Other ( Explain )
0161) g E-Operator Training & License Examination F-Administotive 5
G-Operational Error (Explain)
Exhibit I - Same Source
- Se/77) Attached Sheet !!-Other ( E xplain)
N e
NOTE:
Outage 79 01
Page 1
of 1
UflIT SHUTDOWil AtlD P0'.!ER REDi]CTIOllS EXPLAllATI0tl SHEET DOCKET i;0.
50-333_
REPORT !!OllTil Janirary
__UllIT FLAME florth Anna YEAR 1979 DATE 11-5-79 COMPLETED BY W. R. f4ADIS0tl 79-01 (A)
Excessive packing gland leakage from fl0V-1700, the residual heat removal system suction valve, of greater than 1 gallon per minute.
Technical specifications permit primary plant unidentified leakage of 1 gpm or less. The unit was rer.oved from service and the reactor shutdown at 1641. The plant was then cooled down and depressurized.
The maintenance was completed on 1-28-79 at 1940. The plant was heated to 547 F on 1-29-79 at 1245 and a leakrate calculation was performed.
Agairi leakage was excessive.
It was determined that the pressurizer spray valves were leaking between their bodies and bonnets. The plant was then cooled down and depressurized to allow maintenance. January shutdovin 78-33 continued into February 1979.
1d7309