VIRGINIA ELECTRIC AND POWER COMPANY tiORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Dec.
YEAR 1978 (Revised 11-05-79)
SUBMITTED:
ND WuA SUPERINTEliDEtiT - OPERATIONS APPROVED:
/
/
MANAGE!U 1367 104 7 911200 f'7/
OPERATING DATA REPORT 50-338 DOCKET NO.
DATE
-/9 0'NN h C SIPLETE BY 11. R. thr!ison D
TELEPl!ONE -903-)-4'44-5151 OPERATING STATUS
- 1. Unit Narne:
flort'n Anna Unit 1 Nees
- 2. Reportin; Period:
December 1978 Revised) 277b
- 3. Licenwd Thermal Power (51Wt):
- 4. Nameplate Rating (Gross NWe):
947 907
- 5. Design Electrical Rating (Net StWe):
- 6..\\!aximum Dependable Capacity (Grou StWe):
928 090
- 7. Sfaximum Dependable Capacity (Net 31We):
- 8. If Chan3es Occur in Capacity Ratings (items Number 3 Throust 7) Since Last Report. Give Reasons:
tl/A t1/A
- 9. Powee Level To Which Restricted if Any (Net 51We):
- 10. Reawns For Restrictions. If Any:
il/A This 31onth Yr..to.Date Cumulative
- 11. ifours in Reporting Period 744 5 017 5.017 2
- 12. Nu:nber Of Ilours Reactor Was Critical 727.9 4,686.8 4,686.8_
- 13. Reactor Reserve Shutdown flours 16.1 96.8 96.8
- 14. IIours Generator On.Line 725.4 4,651.7 4,651.7 IS. Unit Rewrve Shutdown 11ours 0
0 0~
- 16. Gross The mal Ener.;y Generated (51WH)
_1,922,519
_1_P 196 795 12,196.795 _
2 1
- 17. Gross Electric.il Energy Generated (51Wil) 609,555
_, _ 3,664,580 3,664,580
~
3,900,437 3,900,437 7 74 467 IS. Net Electrical Energy Generated (51Wil) 97.5 92.7 92.7
- 19. Unit Service Factor
- 20. Unit Availability Factor 97.5 92.7 9 2_.[
- 21. Unit Ca; acity Factor (Using >lDC Net) 86.0 81.3 811 3
- 22. Unit Capacity Factor (Using DER Net) 85.1 80.5 80.5_
2.5 1.5 1.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Slonths (Type. Date,and Duration of Each):
Snubber Inspection April 1979, I week
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
tUA
- 26. Units in Test Status (Prior to Conunercial Operation):
Force.nr Achieved INITIAL CRITICALITY INITIA L ELECTRICITY CO.\\lNtERCIAL OPERATION 1367 505 rim