Revised Monthly Operating Rept for Dec 1978
ML19210D134
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200571
Download: ML19210D134 (2)


Text

.

VIRGINIA ELECTRIC AND POWER COMPANY tiORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Dec. YEAR 1978 (Revised 11-05-79)

SUBMITTED:

ND WuA SUPERINTEliDEtiT - OPERATIONS APPROVED:

/

/

MANAGE!U 1367 104 7 911200 f'7/

OPERATING DATA REPORT DOCKET NO.

50-338 DATE -/9 D

0'NN h C SIPLETE BY 11. R. thr!ison TELEPl!ONE -903-)-4'44-5151 OPERATING STATUS flort'n Anna Unit 1 Nees

1. Unit Narne:
2. Reportin; Period: December 1978 Revised) 277b
3. Licenwd Thermal Power (51Wt): .
4. Nameplate Rating (Gross NWe): 947 * '
5. Design Electrical Rating (Net StWe): 907
6. .\!aximum Dependable Capacity (Grou StWe): 928
7. Sfaximum Dependable Capacity (Net 31We): 090
8. If Chan3es Occur in Capacity Ratings (items Number 3 Throust 7) Since Last Report. Give Reasons:

tl/A t1/A

9. Powee Level To Which Restricted if Any (Net 51We):
10. Reawns For Restrictions. If Any: il/A This 31onth Yr..to.Date Cumulative
11. ifours in Reporting Period 744 52 017 5.017
12. Nu:nber Of Ilours Reactor Was Critical 727.9 4,686.8 4,686.8_
13. Reactor Reserve Shutdown flours 16.1 96.8 96.8
14. IIours Generator On.Line 725.4 4,651.7 4,651 .7 IS. Unit Rewrve Shutdown 11ours 0 0 0~
16. Gross The mal Ener.;y Generated (51WH) _1,922,519 _1_P 2 1961 795 12,196.795 _
17. Gross Electric.il Energy Generated (51Wil) 609,555 ~

3,900,437 3,900,437 IS. Net Electrical Energy Generated (51Wil) 7 74 467 _, _ 3,664,580 3,664,580

19. Unit Service Factor 97.5 92.7 92.7
20. Unit Availability Factor 97.5 92.7 9 2_.[
21. Unit Ca; acity Factor (Using >lDC Net) 86.0 81.3 811 3
22. Unit Capacity Factor (Using DER Net) 85.1 80.5 80.5_
23. Unit Forced Outage Rate 2.5 1.5 1.5
24. Shutdowns Scheduled Over Next 6 Slonths (Type. Date,and Duration of Each):

Snubber Inspection April 1979, I week

25. If Shur Down At End Of Report Period. Estimated Date of Startup: tUA
26. Units in Test Status (Prior to Conunercial Operation): Force.nr Achieved INITIAL CRITICALITY INITIA L ELECTRICITY CO.\lNtERCIAL OPERATION 1367 505 rim