VIRGINIA ELECTRIC AND POWER COMPANY tiORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Dec.

YEAR 1978 (Revised 11-05-79)

SUBMITTED:

ND WuA SUPERINTEliDEtiT - OPERATIONS APPROVED:

/

/

MANAGE!U 1367 104 7 911200 f'7/

OPERATING DATA REPORT 50-338 DOCKET NO.

DATE

-/9 0'NN h C SIPLETE BY 11. R. thr!ison D

TELEPl!ONE -903-)-4'44-5151 OPERATING STATUS

1. Unit Narne:

flort'n Anna Unit 1 Nees

2. Reportin; Period:

December 1978 Revised) 277b

3. Licenwd Thermal Power (51Wt):
4. Nameplate Rating (Gross NWe):

947 907

5. Design Electrical Rating (Net StWe):
6..\\!aximum Dependable Capacity (Grou StWe):

928 090

7. Sfaximum Dependable Capacity (Net 31We):
8. If Chan3es Occur in Capacity Ratings (items Number 3 Throust 7) Since Last Report. Give Reasons:

tl/A t1/A

9. Powee Level To Which Restricted if Any (Net 51We):
10. Reawns For Restrictions. If Any:

il/A This 31onth Yr..to.Date Cumulative

11. ifours in Reporting Period 744 5 017 5.017 2
12. Nu:nber Of Ilours Reactor Was Critical 727.9 4,686.8 4,686.8_
13. Reactor Reserve Shutdown flours 16.1 96.8 96.8
14. IIours Generator On.Line 725.4 4,651.7 4,651.7 IS. Unit Rewrve Shutdown 11ours 0

0 0~

16. Gross The mal Ener.;y Generated (51WH)

_1,922,519

_1_P 196 795 12,196.795 _

2 1

17. Gross Electric.il Energy Generated (51Wil) 609,555

_, _ 3,664,580 3,664,580

~

3,900,437 3,900,437 7 74 467 IS. Net Electrical Energy Generated (51Wil) 97.5 92.7 92.7

19. Unit Service Factor
20. Unit Availability Factor 97.5 92.7 9 2_.[
21. Unit Ca; acity Factor (Using >lDC Net) 86.0 81.3 811 3
22. Unit Capacity Factor (Using DER Net) 85.1 80.5 80.5_

2.5 1.5 1.5

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Slonths (Type. Date,and Duration of Each):

Snubber Inspection April 1979, I week

25. If Shur Down At End Of Report Period. Estimated Date of Startup:

tUA

26. Units in Test Status (Prior to Conunercial Operation):

Force.nr Achieved INITIAL CRITICALITY INITIA L ELECTRICITY CO.\\lNtERCIAL OPERATION 1367 505 rim