VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Oct.
YEAR 1978 (Revised 11-05-79)
SUBMITTED:
Y N9 L %a___
SUPERINTENDENT - OPERATIONS APPROVED:
MANAGER Q 1367 T00 7911200 5 6 7
m m.
o OPERATING DATA REPORT DOCKET NO.
50-338 bs j_,
j o
DATE 11-5-79 C05!PLETED itY __R R Ndison TELEPHONE (703) E94-5151 OPERATING STATUS florth Anna Notes
- 1. Unit Name:
- 2. Reportin3 Period:
Oc.tcher_._lS77,__{.Reyc;s,ed )
- 3. Licensed Thermal Power (31Wt):
2.775
~
- 4. Namephte Rating (Gross SIWE):
947'
- 5. Design Electrical Rating (Net SiW ):
907
- 6. Sf aximum Dependable Capacity (Grou 31We):
920 090
- 7. Slaxi:nu:n Dependable Capacity (Net SIWE):
- 8. If Chanps Occur in Capadty Ratin;s (Items Number 3 Throu;h 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which RestrictW,1f Any(N-t 31We):
N/A
- 10. Reasons For Re>trictions,If Any:
N/A This 5fonth Yr..to.Date Cumulative
- 11. IIours in deporting Period 745 3,553 3,553
- 12. Number Of Hours Re:ictor Was Critical 679.4 3,242.1 3,242.l_
- 13. Reactor ite>erve Shutdown Hours 54.1
'77.5_-
7 7. 5_.
- 14. Ilours Generator On Line 657.2 3.211.4 3.21L/L.
- 15. Unit Reserve Shutdown I!ours 0
0 0
- 16. Gross The-mal Energy Generated (31WH) 1 750.627
_8.379.826
__8.379.826 2
- 17. Grow Electrical Energy Generated (31WH) 560,197 2,684,107 2,694.107 IS. Net Electrical Energy Generateil(5thH) 528,766 2,517,863 2,517,863
- 19. Unit Service Factor 88.2 90.4 90.4
- 20. Unit Avai!.*ility Factor 88.2 90.4 90.4
- 21. Un:t Capacity Factor (Usin351DC Net) 79.0 78.9 78.9
- 12. Unit Capacity Factor (Using DER Net) 78.3 78.1 78.l_
- 23. Unit Forced Outage Rate 5.7 1.5 1,_5._
- 24. Shutdowns Scheduled Over Next 6 31onths (Type.Date,and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Unit > In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COM3!ERCIA L OPER ATION 1367 501 r,y,