Revised Monthly Operating Rept for Oct 1978
ML19210D131
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200567
Download: ML19210D131 (2)


Text

.

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Oct. YEAR 1978 (Revised 11-05-79)

SUBMITTED:

N9 L Y%a___

SUPERINTENDENT - OPERATIONS APPROVED:

MANAGER Q 1367 T00 7911200 5 6 7

m m. o .

. . OPERATING DATA REPORT bs o j_, j DOCKET NO. 50-338 11-5-79 DATE C05!PLETED itY __R R Ndison TELEPHONE (703) E94-5151 OPERATING STATUS

1. Unit Name: florth Anna Notes
2. Reportin3 Period: Oc.tcher_._lS77,__{.Reyc;s,ed )
3. Licensed Thermal Power (31Wt): 2.775 ~
4. Namephte Rating (Gross SIWE): 947' '
5. Design Electrical Rating (Net SiW ): 907
6. Sf aximum Dependable Capacity (Grou 31We): 920
7. Slaxi:nu:n Dependable Capacity (Net SIWE): 090
8. If Chanps Occur in Capadty Ratin;s (Items Number 3 Throu;h 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which RestrictW,1f Any(N-t 31We): N/A
10. Reasons For Re>trictions,If Any: N/A This 5fonth Yr..to.Date Cumulative
11. IIours in deporting Period 745 3,553 3,553
12. Number Of Hours Re:ictor Was Critical 679.4 3,242.1 3,242.l_
13. Reactor ite>erve Shutdown Hours 54.1 '77.5_- 7 7 . 5_.
14. Ilours Generator On Line 657.2 3.211.4 3.21L/L.
15. Unit Reserve Shutdown I!ours 0 0 0
16. Gross The-mal Energy Generated (31WH) 12 750.627 _8.379.826 __8.379.826
17. Grow Electrical Energy Generated (31WH) 560,197 _ _ ,

2,684,107 2,694.107 IS. Net Electrical Energy Generateil(5thH) 528,766 2,517,863 2,517,863

19. Unit Service Factor 88.2 90.4 90.4
20. Unit Avai!.*ility Factor 88.2 90.4 90.4
21. Un:t Capacity Factor (Usin351DC Net) 79.0 78.9 78.9
12. Unit Capacity Factor (Using DER Net) 78.3 78.1 78.l_
23. Unit Forced Outage Rate 5.7 1.5 1 ,_5._
24. Shutdowns Scheduled Over Next 6 31onths (Type.Date,and Duration of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Unit > In Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COM3!ERCIA L OPER ATION 1367 501 r,y ,