Revised Monthly Operating Rept for Nov 1978
ML19210D132
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200569
Download: ML19210D132 (2)


Text

,

s VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Nov.

YEAR 1978 (Revised 11-05-79)

SUBMITTED:

N D)

Ec,A N

SUPERINTENDENT - OPERATIONS APPROVED:

k V

MANAGd()

1367 502 7911200 66f

OPERATING DATA REPORT DOCKET NO.

DATE 11-6-79 COSIPLETED BY F 4 i D

{,

TELEPHONE 703 8 -

1 OPERATING STATUS fiorth Anna Unit 1 Notes

1. Unit h.ame:

el.G l W W 1 %

2. Reporting Period:
3. Licensed Thermal Power (SIWr):

2,7 75 947

4. Nameplate Rating (Grou 51We):
5. Desipt Electrical Rating (Net SIWE):

907

6. 51aximum Dependable Capacity (Gross 51We):

928

7. 51aximu:n Dependable Capacity (Net SIWE):

898

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reucas:

ft/A

9. Power Level To Which Restricted,If Any (Net 3:We):

II/8._

10. Reasons For Restrictions,if Any:

II/A

~

This blonth

_ ___ Yr.-to Date Cumulative

11. Hours In Reporting Per od
12. Number Of Hours Reactor Was Critical 716.8 3,958.9 L958.9
13. Reactor Reserve Shutdown !!ours 3.2 80.7 80.7
14. Hours Generator On Line 714.9 3,926.3 3.925
15. Unit Reserve Shutdown I!ours 0

0 0

16. Grou Therrnal Ener;y Generated (51WH)

'l,894,450 j 0 274,276 10.274,2.7J5.

2

17. Gross E!ectrical Energy Generated (5tWH) 606,775 3,090,113 3,090,113__

3,290,882 3,290.882_

18. Net Electrical Ener;;y Generated (SIWH) 572,250
19. Unit Service Factor 99.3 91.9 91 3
20. Unit Asailability Factor 99.3 91,9_

91 3

21. Unit Capacity Factor (Usin3 51DC Net) 88.5 80.5_

80 5.

22. Unit Capacity Factor (Using DER Net) 87.6 79.7 73 J
23. Unit Forced Outap Rate 0.7 1.4 1,4
24. Shutdowns Scheduled Over Next 6 5!onths(Type.Date,and Duration of Each):

Snubber Inspection April 1979, 1 week

25. If Saut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C05151ERCIAL OPERATION I367 303 mn

... -