ML20217K439 | 18 October 1999 | Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl | Safe Shutdown Earthquake Design basis earthquake |
ML20217H330 | 14 October 1999 | Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr | |
ML18152B354 | 12 October 1999 | Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info | VT-2 |
ML20216K168 | 1 October 1999 | Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein | |
ML18152B339 | 27 September 1999 | Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC | Nondestructive Examination VT-2 |
ML20212G509 | 22 September 1999 | Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) | |
ML18152B333 | 17 September 1999 | Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. | Grace period |
ML18152B667 | 17 September 1999 | Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 | Generic Fundamentals Examination |
ML18152B334 | 16 September 1999 | Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations | Nondestructive Examination VT-2 |
ML18152B447 | 1 September 1999 | Requests That NRC Remove Listed Labels from Distribution | |
ML20211L915 | 1 September 1999 | Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity | |
ML20211H413 | 27 August 1999 | Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint | |
ML20138B324 | 23 August 1999 | Forwards Draft Response to Question 1 Re NAPS USI A-46 | Earthquake |
ML20211D904 | 20 August 1999 | Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal | High Radiation Area Hydrostatic VT-2 |
ML20210Q984 | 12 August 1999 | Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 | |
ML20210Q766 | 6 August 1999 | Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas | |
ML18152B408 | 6 August 1999 | Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. | Loop seal Stroke time |
ML18152B409 | 5 August 1999 | Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) | Fitness for Duty |
ML20210J886 | 2 August 1999 | Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate | |
ML20210F612 | 28 July 1999 | Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal | |
ML18152B397 | 26 July 1999 | Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 | |
ML20209E762 | 9 July 1999 | Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines | Packing leak Pressure Boundary Leakage |
05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl | 8 July 1999 | Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl | |
ML18152B440 | 1 July 1999 | Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co | |
ML18152B437 | 24 June 1999 | Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections | High Radiation Area Hydrostatic VT-2 |
ML18152B436 | 22 June 1999 | Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 | Design basis earthquake |
ML20196F115 | 22 June 1999 | Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program | |
ML20212J295 | 22 June 1999 | Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS | |
ML20195J701 | 15 June 1999 | Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP | |
ML18152B430 | 3 June 1999 | Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 | |
ML20195C660 | 1 June 1999 | Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program | Safe Shutdown Boric Acid High winds Safe Shutdown Earthquake Seismically rugged Design basis earthquake Earthquake |
ML18152B426 | 28 May 1999 | Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request | |
ML20207C985 | 28 May 1999 | Requests Regrading of Rt Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted | |
ML18152B422 | 27 May 1999 | Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 | Loop seal |
ML18152B423 | 26 May 1999 | Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable | |
ML20195B538 | 14 May 1999 | Forwards Rev 8,Change 2 to North Anna Units 1 & 2 IST Programs for Pumps & Valves. Summaries of Program Changes Provided for Each Unit IST Program.Relief Requests Have Been Removed from IST Programs | |
ML18152A370 | 13 May 1999 | Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion | Through-Wall Leakage |
ML20206H022 | 3 May 1999 | Informs That Licensee Changes Bases for TS 3/4.6.1.2, Containment Leakage. Changes Allow Use of Other NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing.Ts Bases Page,Encl | |
ML20206G948 | 3 May 1999 | Informs NRC That Insp of 58 Accessible safety-related Pipe Supports Completed in Response to NOV from Insp Rept 50-338/98-05 & 50-339/98-05.Commitments Made Include Plans to Perform Assessment of Welding & Welding Insp | |
ML20205T118 | 16 April 1999 | Requests NRC Approval Prior to Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit.Nrc Concurrence with Irradiation Program Requested by End of June 1999 | Exemption Request Fuel cladding |
ML20205P189 | 8 April 1999 | Forwards ISI Program for Third ten-yr ISI Interval for North Anna Unit 1 for Class 1,2 & 3 Components & Component Support.Third ten-yr Insp Interval for North Anna Unit 1 Begins on 990501.Page 2-26 of Encl Not Included | |
ML20205K363 | 5 April 1999 | Requests That Relief Request IWE-3 Be Removed from 980804 Relief Requests Submitted to Nrc.Subject Relief Request Was Inadvertently Retained in Attachment 1 for Unit 1 | |
ML20205K219 | 1 April 1999 | Forwards Response to NRC 990106 RAI Re Util Summary Rept on USI A-46 Program,Submitted 970527.Calculations & Corrected Table 11.1-1,encl | |
ML18151A585 | 31 March 1999 | Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) | |
ML18152A280 | 30 March 1999 | Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl | Earthquake |
ML20204H033 | 17 March 1999 | Forwards Rev 5 to PSP for Surry & North Anna Power Stations & Associated Isfsis.Description & Justification for Changes Included with Plan Rev.Rev 5 to PSP Withheld Per 10CFR73.21 | |
ML20205E270 | 25 February 1999 | Forwards Rept on Status of Decommissioning Funding for North Anna Power Station,Units 1 & 2.Trust Agreement Between Old Dominion & Bankers Trust Co,Effective 990301,attached | |
ML20207A874 | 25 February 1999 | Draft Response to NRC Telcon Re Licensee Request for Approval of LBB Evaluation in Support of Elimination of Augmented Insp Program on RCS Loop Bypass Lines.Response Justifies Use of Less than One Gpm Detectable Leakage Rate | Packing leak |
ML18152B540 | 11 February 1999 | Requests Relief from Specific Requirements of Subsection Iwl of 1992 Edition with 1992 Addenda of ASME Section Xi,Per 10CFR50.55a(a)(3) | |
ML20203C818 | 5 February 1999 | Forwards Response to NRC 981217 Telcon RAI Re risk-basis of Nitrogen Accumulator Action Statement to Complete NRC Review of 951025 Proposed TS Changes | Large early release frequency Maintenance Rule Program |