ML13182A443: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:t.,,11 UNITED STATES ",v'-' "'I" NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:t.,,11 REGUl                                    UNITED STATES
! WASHINGTON, D.C. 20555-0001  
    ",v'-'           "'I"
<{ 0 :;; : July 12, 2013 V';. l' ***i<'"
    ~                    o~                  NUCLEAR REGULATORY COMMISSION
FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station
!                         ~0                        WASHINGTON, D.C. 20555-0001
 
<{
==SUMMARY==
~V';.
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 11,2013, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC. NO. ME4640) The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on April 11, 2013, to discuss and clarify the staff's requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station license renewal application.
l'~                                July 12, 2013
Enclosure 1 provides a listing of the participants and Enclosure 2 contains a summary of the staff discussion with FENOC. A brief description on the status of the items is also included.
    ~"              ~o
FENOC had an opportunity to comment on this summary. Sincerely, uel rojects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346
          ***i<'"
 
LICENSEE:       FirstEnergy Nuclear Operating Company FACILITY:       Davis-Besse Nuclear Power Station
==Enclosures:==
: 1. List of Participants List of Requests for cc w/encls: Listserv July 12, 2013 LICENSEE:
FirstEnergy Nuclear Operating Company FACILITY:
Davis-Besse Nuclear Power Station  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 11, 2013, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC. NO. ME4640) The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on April 11, 2013, to discuss and clarify the staff's requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station license renewal application.
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 11,2013, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)
The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on April 11, 2013, to discuss and clarify the staff's requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station license renewal application.
Enclosure 1 provides a listing of the participants and Enclosure 2 contains a summary of the staff discussion with FENOC. A brief description on the status of the items is also included.
Enclosure 1 provides a listing of the participants and Enclosure 2 contains a summary of the staff discussion with FENOC. A brief description on the status of the items is also included.
FENOC had an opportunity to comment on this summary. Sincerely, IRA! Samuel Cuadrado de Jesus, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346  
FENOC had an opportunity to comment on this summary.
Sincerely, uel  uadr~~2::ager rojects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346


==Enclosures:==
==Enclosures:==
: 1. List of Participants List of Requests for Additional Information cc w/encls: Listserv DISTRIBUTION:
: 1. List of Participants
See next page ADAMS Accession No . ML13182A443
: 2. List of Requests for Additional Information cc w/encls: Listserv
.. OFFICE LA:DLR/RPB1 PM:RPB1 :DLR IBC:RPB1 :DLR NAME IKing SCuadrado de az DATE 07/5/2013 07/9/2013 07/12/2013 OFFICIAL RECORD 
 
... ML13182A443 OFFICE       LA:DLR/RPB1         PM:RPB1 :DLR             IBC:RPB1 :DLR NAME       IKing               SCuadrado de                   az DATE       07/5/2013           07/9/2013                 07/12/2013


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE DAVIS-BESSE NUCLEAR POWER LICENSE RENEWAL LIST OF April 11, PARTICI PANTS Samuel Cuadrado de Jesus William (Bill) Holston Angela Buford Cliff Custer Steven Dort Trent Henline Don Kosloff Jake Hofelich Larry Hinkle Joseph Brunkhorst Thomas Henry Allen McAllister AFFILIATIONS U.S. Nuclear Regulatory Commission (NRC) NRC NRC FirstEnergy Nuclear Operating Company (FENOC) FENOC FENOC FENOC FENOC FENOC FENOC FENOC FENOC ENCLOSURE
OF TELEPHONE CONFERENCE CALL DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS April 11, 2013 PARTICI PANTS                       AFFILIATIONS Samuel Cuadrado de Jesus           U.S. Nuclear Regulatory Commission (NRC)
William (Bill) Holston              NRC Angela Buford                      NRC Cliff Custer                        FirstEnergy Nuclear Operating Company (FENOC)
Steven Dort                        FENOC Trent Henline                      FENOC Don Kosloff                        FENOC Jake Hofelich                      FENOC Larry Hinkle                        FENOC Joseph Brunkhorst                  FENOC Thomas Henry                        FENOC Allen McAllister                    FENOC ENCLOSURE 1


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE NUCLEAR POWER LICENSE RENEWAL April 11, The U.S. Nuclear Regulatory Commission staff and representatives of FirstEnergy Operating Company (FENOC or the applicant) held a telephone conference call April 11, 2013, to discuss and clarify the following requests for additional information concerning the Davis-Besse Nuclear Power Station license renewal Response to RAI B.2.4-1 b dated March 14, Discussion:
OF TELEPHONE CONFERENCE CALL DAVIS~BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION April 11, 2013 The U.S. Nuclear Regulatory Commission staff and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on April 11, 2013, to discuss and clarify the following requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station license renewal application.
The staff stated that while reviewing FENOCs RAI response it had identified a between the response and NUREG-1801, "Generic Aging Lessons Learned (GALL)
Response to RAI B.2.4-1 b dated March 14, 2013 Discussion: The staff stated that while reviewing FENOCs RAI response it had identified a gap between the response and NUREG-1801, "Generic Aging Lessons Learned (GALL) Report."
The staff stated that the GALL Report requires monitoring of A325 and A490 high-strength measured yield strength greater than 150 ksi) bolting in American Society of Engineers (ASME) Section XI, Subsection IWF applications for stress corrosion cracking using volumetric examination.
The staff stated that the GALL Report requires monitoring of A325 and A490 high-strength (I.e.,
The staff stated that the IWF Program requirement for A325 A490 bolting is different than the requirements for A325 and A490 high-strength bolting addressed in the Structures Monitoring Program, because there is an exemption high-strength A325 and A490 bolting in the Structures Monitoring Program that does not exist the IWF Program. The staff stated that the process for monitoring high-strength A325 and IWF bolting could follow the same process as that proposed by FENOC for A540 bolting in the response to the FENOC stated that plant-specific operating experience from the IWF Program inspections not shown any evidence of bolting SCC. FENOC also stated that it needs to review the further and requested a follow-up telephone conference call on this topic to obtain clarification from the staff. The staff stated that it can support an additional conference call the There was no further discussion, and the call was Action: The staff will support a follow-up telephone conference ENCLOSURE
measured yield strength greater than 150 ksi) bolting in American Society of Mechanical Engineers (ASME) Section XI, Subsection IWF applications for stress corrosion cracking (SCC) using volumetric examination. The staff stated that the IWF Program requirement for A325 and A490 bolting is different than the requirements for A325 and A490 high-strength structural bolting addressed in the Structures Monitoring Program, because there is an exemption for high-strength A325 and A490 bolting in the Structures Monitoring Program that does not exist in the IWF Program. The staff stated that the process for monitoring high-strength A325 and A490 IWF bolting could follow the same process as that proposed by FENOC for A540 structural bolting in the response to the RAI.
FENOC stated that plant-specific operating experience from the IWF Program inspections has not shown any evidence of bolting SCC. FENOC also stated that it needs to review the issue further and requested a follow-up telephone conference call on this topic to obtain additional clarification from the staff. The staff stated that it can support an additional conference call on the issues.
There was no further discussion, and the call was concluded.
Action: The staff will support a follow-up telephone conference call.
ENCLOSURE 2


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON APRIL BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC. NO. ME4640) DISTRIBUTION:
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 11,2013, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)
DISTRIBUTION:
HARDCOPY:
HARDCOPY:
DLRRF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource SCuadrado EKeegan EMiller MMahoney DMclntyre, OPA TRiley,OCA BHarris, OGC ENCLOSURE}}
DLRRF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource SCuadrado EKeegan EMiller MMahoney DMclntyre, OPA TRiley,OCA BHarris, OGC ENCLOSURE 2}}

Latest revision as of 21:09, 25 February 2020

Summary of Telephone Conference Call Held on April 11, 2013, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Powe
ML13182A443
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/12/2013
From: Cuadradodejesus S
License Renewal Projects Branch 1
To:
FirstEnergy Nuclear Operating Co
Cuadrado S 415-2948
References
TAC ME4640
Download: ML13182A443 (5)


Text

t.,,11 REGUl UNITED STATES

",v'-' "'I"

~ o~ NUCLEAR REGULATORY COMMISSION

! ~0 WASHINGTON, D.C. 20555-0001

<{

~V';.

l'~ July 12, 2013

~" ~o

      • i<'"

LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON APRIL 11,2013, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)

The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on April 11, 2013, to discuss and clarify the staff's requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station license renewal application.

Enclosure 1 provides a listing of the participants and Enclosure 2 contains a summary of the staff discussion with FENOC. A brief description on the status of the items is also included.

FENOC had an opportunity to comment on this summary.

Sincerely, uel uadr~~2::ager rojects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosures:

1. List of Participants
2. List of Requests for Additional Information cc w/encls: Listserv

... ML13182A443 OFFICE LA:DLR/RPB1 PM:RPB1 :DLR IBC:RPB1 :DLR NAME IKing SCuadrado de az DATE 07/5/2013 07/9/2013 07/12/2013

SUMMARY

OF TELEPHONE CONFERENCE CALL DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS April 11, 2013 PARTICI PANTS AFFILIATIONS Samuel Cuadrado de Jesus U.S. Nuclear Regulatory Commission (NRC)

William (Bill) Holston NRC Angela Buford NRC Cliff Custer FirstEnergy Nuclear Operating Company (FENOC)

Steven Dort FENOC Trent Henline FENOC Don Kosloff FENOC Jake Hofelich FENOC Larry Hinkle FENOC Joseph Brunkhorst FENOC Thomas Henry FENOC Allen McAllister FENOC ENCLOSURE 1

SUMMARY

OF TELEPHONE CONFERENCE CALL DAVIS~BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION April 11, 2013 The U.S. Nuclear Regulatory Commission staff and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on April 11, 2013, to discuss and clarify the following requests for additional information (RAls) concerning the Davis-Besse Nuclear Power Station license renewal application.

Response to RAI B.2.4-1 b dated March 14, 2013 Discussion: The staff stated that while reviewing FENOCs RAI response it had identified a gap between the response and NUREG-1801, "Generic Aging Lessons Learned (GALL) Report."

The staff stated that the GALL Report requires monitoring of A325 and A490 high-strength (I.e.,

measured yield strength greater than 150 ksi) bolting in American Society of Mechanical Engineers (ASME)Section XI, Subsection IWF applications for stress corrosion cracking (SCC) using volumetric examination. The staff stated that the IWF Program requirement for A325 and A490 bolting is different than the requirements for A325 and A490 high-strength structural bolting addressed in the Structures Monitoring Program, because there is an exemption for high-strength A325 and A490 bolting in the Structures Monitoring Program that does not exist in the IWF Program. The staff stated that the process for monitoring high-strength A325 and A490 IWF bolting could follow the same process as that proposed by FENOC for A540 structural bolting in the response to the RAI.

FENOC stated that plant-specific operating experience from the IWF Program inspections has not shown any evidence of bolting SCC. FENOC also stated that it needs to review the issue further and requested a follow-up telephone conference call on this topic to obtain additional clarification from the staff. The staff stated that it can support an additional conference call on the issues.

There was no further discussion, and the call was concluded.

Action: The staff will support a follow-up telephone conference call.

ENCLOSURE 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON APRIL 11,2013, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)