{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2013 Mr. Terry D. Hobbs Decommissioning Director Crystal River Nuclear Plant (NA2C)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2013 Mr. Terry D. Hobbs Decommissioning Director Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708
 
15760 W. Power Line Street Crystal River, FL 34428-6708  


==SUBJECT:==
==SUBJECT:==
Line 23: Line 21:


==SUMMARY==
==SUMMARY==
  - CATEGORY 3 - ANNUAL ASSESSMENT MEETING - CRYSTAL RIVER UNIT 3 NUCLEAR PLANT, DOCKET NO. 50-302  
  - CATEGORY 3 - ANNUAL ASSESSMENT MEETING - CRYSTAL RIVER UNIT 3 NUCLEAR PLANT, DOCKET NO. 50-302


==Dear Mr. Hobbs:==
==Dear Mr. Hobbs:==


This refers to the meeting conducted on May 1, 2013, at the Crystal River Nuclear Plant Training Center/Emergency Operations Facility located in Crystal River, Florida. The purpose of  
This refers to the meeting conducted on May 1, 2013, at the Crystal River Nuclear Plant Training Center/Emergency Operations Facility located in Crystal River, Florida. The purpose of the meeting was to discuss the NRC Reactor Oversight Process Annual Assessment of your Crystal River Unit 3 Nuclear Plant. Enclosed is a list of attendees and the Crystal River annual assessment meeting presentation.
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
the meeting was to discuss the NRC Reactor Oversight Process Annual Assessment of your Crystal River Unit 3 Nuclear Plant. Enclosed is a list of attendees and the Crystal River annual assessment meeting presentation.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Should you have any questions concerning this meeting, please contact me at (404) 997- 4721.
Should you have any questions concerning this meeting, please contact me at (404) 997- 4721.
Sincerely,
Sincerely,
      /RA/
                                              /RA/
Daniel W. Rich, Chief       Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72  
Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. NRC Presentation  
: 2. NRC Presentation
 
_________________________  X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP      SIGNATURE MJR:/RA/ DWR:/RA/      NAME MRiches DRich      DATE 5/3/2013 5/13/2013      E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO T. Hobbs 2 cc w/encls: Kelvin Henderson, General Manager Nuclear Fleet Operations Progress Energy Electronic Mail Distribution
 
Robert J. Duncan II, Vice President Nuclear Operations Progress Energy Electronic Mail Distribution
 
Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution
 
Terry Hobbs, Plant General Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
 
Stephen J. Cahill Director - Engineering Nuclear Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
 
R. Alexander Glenn, General Counsel
 
Progress Energy Electronic Mail Distribution Jeffrey R. Swartz
 
Director Site Operations Crystal River Nuclear Plant Electronic Mail Distribution
 
Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim)
 
Progress Energy Electronic Mail Distribution Thomas Sapporito, Consulting Associate Post Office Box 8413 Jupiter, FL  33468 Bryan Koon, Director Florida Division of Emergency Management Electronic Mail Distribution
 
William A. Passetti, Chief
 
Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution
 
Daniel R. Westcott, Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B) Electronic Mail Distribution
 
Joseph W. Donahue, Vice President Nuclear Oversight
 
Progress Energy Electronic Mail Distribution
 
Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution David T. Conley, Senior Counsel
 
Legal Department
 
Progress Energy Electronic Mail Distribution Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution
 
Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL  32399-1050
 
Chairman Board of County Commissioners
 
Citrus County


110 N. Apopka Avenue  
_________________________            X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE            RII:DRP      RII:DRP SIGNATURE          MJR:/RA/      DWR:/RA/
NAME              MRiches      DRich DATE                  5/3/2013      5/13/2013 E-MAIL COPY?        YES    NO  YES      NO  YES    NO    YES    NO      YES    NO    YES    NO    YES    NO T. Hobbs                              2 cc w/encls:
Kelvin Henderson, General Manager        Bryan Koon, Director Nuclear Fleet Operations                Florida Division of Emergency Management Progress Energy                          Electronic Mail Distribution Electronic Mail Distribution William A. Passetti, Chief Robert J. Duncan II, Vice President      Florida Bureau of Radiation Control Nuclear Operations                      Department of Health Progress Energy                          Electronic Mail Distribution Electronic Mail Distribution Daniel R. Westcott, Supervisor Brian C. McCabe                          Licensing & Regulatory Programs Manager, Nuclear Oversight              Crystal River Nuclear Plant (NA1B)
Shearon Harris Nuclear Power Plant      Electronic Mail Distribution Progress Energy Electronic Mail Distribution            Joseph W. Donahue, Vice President Nuclear Oversight Terry Hobbs, Plant General Manager      Progress Energy Crystal River Nuclear Plant (NA2C)      Electronic Mail Distribution Electronic Mail Distribution Jack E. Huegel Stephen J. Cahill                        Manager, Nuclear Oversight Director - Engineering Nuclear          Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C)      Electronic Mail Distribution Electronic Mail Distribution David T. Conley, Senior Counsel R. Alexander Glenn, General Counsel      Legal Department Progress Energy                          Progress Energy Electronic Mail Distribution            Electronic Mail Distribution Jeffrey R. Swartz                        Mark Rigsby Director Site Operations                Manager, Support Services - Nuclear Crystal River Nuclear Plant              Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution            Electronic Mail Distribution Donna B. Alexander                      Attorney General Manager, Nuclear Regulatory Affairs      Department of Legal Affairs (interim)                                The Capitol PL-01 Progress Energy                          Tallahassee, FL 32399-1050 Electronic Mail Distribution Chairman Thomas Sapporito, Consulting Associate  Board of County Commissioners Post Office Box 8413                    Citrus County Jupiter, FL 33468                        110 N. Apopka Avenue Inverness, FL 36250


Inverness, FL  36250
T. Hobbs                                   3 Letter to Terry D. Hobbs from Daniel W. Rich dated May 13, 2013
 
T. Hobbs 3 Letter to Terry D. Hobbs from Daniel W. Rich dated May 13, 2013  


==SUBJECT:==
==SUBJECT:==
Line 94: Line 48:


==SUMMARY==
==SUMMARY==
  - CATEGORY 3- ANNUAL ASSESSMENT MEETING - CRYSTAL RIVER UNIT 3 NUCLEAR PLANT, DOCKET NO. 50-302  
  - CATEGORY 3- ANNUAL ASSESSMENT MEETING - CRYSTAL RIVER UNIT 3 NUCLEAR PLANT, DOCKET NO. 50-302 Distribution w/encls:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCrystalRiver Resource


Distribution w/encls
LIST OF ATTENDEES Nuclear Regulatory Commission (NRC)
: C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCrystalRiver Resource Enclosure 1 LIST OF ATTENDEES
D. Rich, Chief, Reactor Projects Branch 3 (RPB3), Region II (RII)
T. Morrissey, Senior Resident Inspector, St. Lucie, RII S. Vias, Chief, Engineering Branch 3 (EB3), RII M. Ferdas, Chief, Decommissioning Branch, Division of Nuclear Material Safety Management and Support (NMSS), Region I Bruce Watson, Chief, Reactor Decommissioning Branch, Office of Federal and State Materials and Environmental Management Programs (FSME)
J. Hickman, Reactor Decommissioning Branch, FSME Duke Energy T. Hobbs, Decommissioning Director - Crystal River 3 Nuclear Plant B. Wunderly, Plant Manager - Crystal River 3 Nuclear Plant P. Dixon, Decommissioning Support Manager - Crystal River 3 Nuclear Plant K. Meyers, Emergency Planning - Crystal River 3 Nuclear Plant H. Danenhower M. DeLowery Public Attendance R. Bright B. Bright P. Rowe B. Jordan D.M. Clark J. Keenum D. Kraut J. Thomas A. Cooke A. Sadiq Enclosure 1 2
Enclosure 2


Nuclear Regulatory Commission (NRC)
3 Enclosure 2


D. Rich, Chief, Reactor Projects Branch 3 (RPB3), Region II (RII)
4 Enclosure 2
T. Morrissey, Senior Resident Inspector, St. Lucie, RII S. Vias, Chief, Engineering Branch 3 (EB3), RII M. Ferdas, Chief, Decommissioning Branch, Division of Nuclear Material Safety Management and Support (NMSS), Region I Bruce Watson, Chief, Reactor Decommissioning Branch, Office of Federal and State Materials and Environmental Management Programs (FSME) J. Hickman, Reactor Decommissioning Branch, FSME
 
5 Enclosure 2


Duke Energy
6 Enclosure 2


T. Hobbs, Decommissioning Director - Crystal River 3 Nuclear Plant B. Wunderly, Plant Manager - Crystal River 3 Nuclear Plant P. Dixon, Decommissioning Support Manager - Crystal River 3 Nuclear Plant K. Meyers, Emergency Planning - Crystal River 3 Nuclear Plant
7 Enclosure 2


H. Danenhower
8 Enclosure 2


M. DeLowery
9 Enclosure 2


Public Attendance
10 Enclosure 2


R. Bright
11 Enclosure 2


B. Bright P. Rowe B. Jordan D.M. Clark
12 Enclosure 2


J. Keenum
13 Enclosure 2


D. Kraut J. Thomas
14 Enclosure 2


A. Cooke A. Sadiq
15 Enclosure 2


Enclosure 2 2 Enclosure 2 3 Enclosure 2 4 Enclosure 2 5 Enclosure 2 6 Enclosure 2 7 Enclosure 2 8 Enclosure 2 9 Enclosure 2 10 Enclosure 2 11 Enclosure 2 12 Enclosure 2 13 Enclosure 2 14 Enclosure 2 15 Enclosure 2 16 Enclosure 2}}
16 Enclosure 2}}

Latest revision as of 05:46, 6 February 2020

Public Meeting Summary - Category 3 - Annual Assessment Meeting - Crystal River Unit 3 Nuclear Plant
ML13134A173
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/13/2013
From: Rich D
NRC/RGN-II/DRP/RPB3
To: Hobbs T
Progress Energy Florida
References
Download: ML13134A173 (21)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2013 Mr. Terry D. Hobbs Decommissioning Director Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATEGORY 3 - ANNUAL ASSESSMENT MEETING - CRYSTAL RIVER UNIT 3 NUCLEAR PLANT, DOCKET NO. 50-302

Dear Mr. Hobbs:

This refers to the meeting conducted on May 1, 2013, at the Crystal River Nuclear Plant Training Center/Emergency Operations Facility located in Crystal River, Florida. The purpose of the meeting was to discuss the NRC Reactor Oversight Process Annual Assessment of your Crystal River Unit 3 Nuclear Plant. Enclosed is a list of attendees and the Crystal River annual assessment meeting presentation.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997- 4721.

Sincerely,

/RA/

Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72

Enclosures:

1. List of Attendees
2. NRC Presentation

_________________________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE MJR:/RA/ DWR:/RA/

NAME MRiches DRich DATE 5/3/2013 5/13/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO T. Hobbs 2 cc w/encls:

Kelvin Henderson, General Manager Bryan Koon, Director Nuclear Fleet Operations Florida Division of Emergency Management Progress Energy Electronic Mail Distribution Electronic Mail Distribution William A. Passetti, Chief Robert J. Duncan II, Vice President Florida Bureau of Radiation Control Nuclear Operations Department of Health Progress Energy Electronic Mail Distribution Electronic Mail Distribution Daniel R. Westcott, Supervisor Brian C. McCabe Licensing & Regulatory Programs Manager, Nuclear Oversight Crystal River Nuclear Plant (NA1B)

Shearon Harris Nuclear Power Plant Electronic Mail Distribution Progress Energy Electronic Mail Distribution Joseph W. Donahue, Vice President Nuclear Oversight Terry Hobbs, Plant General Manager Progress Energy Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Electronic Mail Distribution Jack E. Huegel Stephen J. Cahill Manager, Nuclear Oversight Director - Engineering Nuclear Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Electronic Mail Distribution David T. Conley, Senior Counsel R. Alexander Glenn, General Counsel Legal Department Progress Energy Progress Energy Electronic Mail Distribution Electronic Mail Distribution Jeffrey R. Swartz Mark Rigsby Director Site Operations Manager, Support Services - Nuclear Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Electronic Mail Distribution Donna B. Alexander Attorney General Manager, Nuclear Regulatory Affairs Department of Legal Affairs (interim) The Capitol PL-01 Progress Energy Tallahassee, FL 32399-1050 Electronic Mail Distribution Chairman Thomas Sapporito, Consulting Associate Board of County Commissioners Post Office Box 8413 Citrus County Jupiter, FL 33468 110 N. Apopka Avenue Inverness, FL 36250

T. Hobbs 3 Letter to Terry D. Hobbs from Daniel W. Rich dated May 13, 2013

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATEGORY 3- ANNUAL ASSESSMENT MEETING - CRYSTAL RIVER UNIT 3 NUCLEAR PLANT, DOCKET NO. 50-302 Distribution w/encls:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCrystalRiver Resource

LIST OF ATTENDEES Nuclear Regulatory Commission (NRC)

D. Rich, Chief, Reactor Projects Branch 3 (RPB3), Region II (RII)

T. Morrissey, Senior Resident Inspector, St. Lucie, RII S. Vias, Chief, Engineering Branch 3 (EB3), RII M. Ferdas, Chief, Decommissioning Branch, Division of Nuclear Material Safety Management and Support (NMSS), Region I Bruce Watson, Chief, Reactor Decommissioning Branch, Office of Federal and State Materials and Environmental Management Programs (FSME)

J. Hickman, Reactor Decommissioning Branch, FSME Duke Energy T. Hobbs, Decommissioning Director - Crystal River 3 Nuclear Plant B. Wunderly, Plant Manager - Crystal River 3 Nuclear Plant P. Dixon, Decommissioning Support Manager - Crystal River 3 Nuclear Plant K. Meyers, Emergency Planning - Crystal River 3 Nuclear Plant H. Danenhower M. DeLowery Public Attendance R. Bright B. Bright P. Rowe B. Jordan D.M. Clark J. Keenum D. Kraut J. Thomas A. Cooke A. Sadiq Enclosure 1 2

Enclosure 2

3 Enclosure 2

4 Enclosure 2

5 Enclosure 2

6 Enclosure 2

7 Enclosure 2

8 Enclosure 2

9 Enclosure 2

10 Enclosure 2

11 Enclosure 2

12 Enclosure 2

13 Enclosure 2

14 Enclosure 2

15 Enclosure 2

16 Enclosure 2