ML20069A023

From kanterella
Jump to navigation Jump to search

Order Approving Transfer of Licensed Authority from Duke Energy Florida, LLC, to ADP CR3, LLC, and Draft Conforming Administrative License Amendment
ML20069A023
Person / Time
Site: Crystal River  Duke Energy icon.png
Issue date: 04/01/2020
From: John Hickman
Division of Decommissioning, Uranium Recovery and Waste Programs
To: Hobbs T
Crystal River, FL
Hickman J
References
EA-20-045, EPID L-2019-LLA-0135
Download: ML20069A023 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 1, 2020 EA-20-045 Mr. Terry D. Hobbs General Manager, Decommissioning Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - ORDER APPROVING TRANSFER OF LICENSED AUTHORITY FROM DUKE ENERGY FLORIDA, LLC TO ADP CR3, LLC AND DRAFT CONFORMING ADMINISTRATIVE LICENSE AMENDMENT (EPID L-2019-LLA-0135)

Dear Mr. Hobbs:

By letter dated June 14, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19170A209), as supplemented by letters dated January 17, 2020 (ADAMS Accession No. ML20017A216), and March 5, 2020 (ADAMS Accession No. ML20065K737), Duke Energy Florida, LLC (DEF) and ADP CR3, LLC (ADP CR3) (collectively, the Applicants) requested, pursuant to Section 184 of the Atomic Energy Act of 1954, as amended, and Sections 50.80, Transfer of licenses, and 72.50, Transfer of license, of Title 10 of the Code of Federal Regulations (10 CFR), that the U.S. Nuclear Regulatory Commission (NRC, the Commission) consent to the transfer to ADP CR3 of DEFs licensed authority under Facility Operating License No. DPR-72 for the Crystal River Unit 3 Nuclear Generating Plant (CR-3) and the general license for the CR-3 independent spent fuel storage installation (ISFSI) to possess, maintain, and decommission CR-3 and its ISFSI. The Applicants also requested NRC approval of a draft conforming administrative license amendment pursuant to 10 CFR 50.80 and 10 CFR 50.90, Application for amendment of license, construction permit, or early site permit.

Notice of the application was published in the Federal Register (FR) on October 11, 2019 (84 FR 54932). The supplemental letters dated January 17, 2020, and March 5, 2020, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staffs no significant hazards consideration determination.

The NRC staff has completed its review of the application. The Order in Enclosure 1 approves the proposed transfer, subject to the condition described therein. The Order also approves the draft conforming administrative license amendment in Enclosure 2, which will be issued and made effective at the time the transfer actions are completed. Enclosure 3 is the NRC staffs safety evaluation related to the application.

The Order has been forwarded to the Office of the Federal Register for publication.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. The ADAMS is accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html.

Should you have any questions regarding this action, please contact me at 301-415-3017 or via e-mail at John.Hickman@nrc.gov.

Sincerely, John B. Hickman, Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-302 and 72-1035

Enclosures:

1. Order
2. Draft Conforming Amendment to DPR-72
3. Safety Evaluation cc w/enclosures: Crystal River ListServ

Package:ML20069A028 *via Email OFFICE NMSS/RDB/PM NMSS/RDB/BC NRR/IFIB/BC OE OGC NAME JHickman BWatson*

FMiller*

JPeralta*

JWachutka*

DATE 3 / 06 / 2020 3 / 09 / 2020 3 / 10 / 2020 3 / 16 / 2020 3 / 16 / 2020 OFFICE NMSS/DUWP/D Tech Editor NMSS/D NMSS/RDB/PM NAME PHolahan*

CGoode JLubinski JHickman DATE 3/18 / 2020 3/23/2020 04/01/2020 04/01/ 2020