ML21012A314

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation Security Inspection Plan
ML21012A314
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/13/2021
From: Fred Bower
Plant Support Branch 1
To: Hager J
ADP CR3
Bower F
References
Download: ML21012A314 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 January 13, 2021 Mr. John Hager Site Vice President ADP CR3, LLC 2760 South Falkenburg Rd Riverview FL, 33578

SUBJECT:

CRYSTAL RIVER UNIT 3 - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION PLAN

Dear Mr. Hager:

The enclosed inspection plan lists the security inspection scheduled through December 31, 2022. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well before our inspectors arrive on site.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5200 with any questions you may have regarding the inspection plan.

Sincerely, 1/12/2021 X /RA/

Fred L. Bower, Chief Signed by: Fred L. Bower Fred L. Bower III, Chief Plant Support Branch Division of Reactor Safety Docket No. 07201035 License No. DPR-72

Enclosure:

Crystal River Unit 3 - Independant Spent Fuel Storage Installation Inspection Plan cc w/encl; M. Widener, Manager, Nuclear Security

ML21012A314 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DNMS RI/DRS NAME JRey/JR

  • ADimitriadis/AD
  • FBower/FB
  • DATE 01/06/2021 01/11/2021 01/13/2021
  • - concur via email IP 22 Inspection Activity Plan Report Crystal River (ISFSI) 01/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count CR-ISFSI Security Inspection 1 1 01/10/2022 01/14/2022 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations This report does not include INPO and OUTAGE activities. Page 1 of 1 This report shows only on-site and announced inspection procedures.

1/4/2021 6:06:02 AM