ML19296A192: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 24: Line 24:
MONTICELID NUCLEAR GENERATING PLANT Docket No. 50-263                License No. DFR-2 2 Failure to Perform Surveillance Test on Schedule The Licensee Event Report for this - 'tr re nce is reproduced on the back of this letter. Enclosed 1. _ three co p ies .
MONTICELID NUCLEAR GENERATING PLANT Docket No. 50-263                License No. DFR-2 2 Failure to Perform Surveillance Test on Schedule The Licensee Event Report for this - 'tr re nce is reproduced on the back of this letter. Enclosed 1. _ three co p ies .
This event is reported in compliance with Technical Specification 6.7.B.2.c since the weekly APRM functional scram test was not com-pleted within the time period allowed for weekly tests.
This event is reported in compliance with Technical Specification 6.7.B.2.c since the weekly APRM functional scram test was not com-pleted within the time period allowed for weekly tests.
Yours very truly,
Yours very truly, L 0 !ayer, b ~
              .
L 0 !ayer, b ~
Mi q-  er of Nuclear Support Services LO!!/J AC /deh cc:    Director, IE, USNRC ( 30)
Mi q-  er of Nuclear Support Services LO!!/J AC /deh cc:    Director, IE, USNRC ( 30)
Director, MIPC, USNRC (3)
Director, MIPC, USNRC (3)

Latest revision as of 15:17, 1 February 2020

Forwards LER 79-002/03L-0
ML19296A192
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/09/1979
From: Mayer L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML112760149 List:
References
NUDOCS 7902130175
Download: ML19296A192 (1)


Text

NSP NORTHERN STATES POWER COMPANY M I N N E A P* O L 8 5. MIN N E SOTA 855401 Februa ry 9, 1979

!!r J G Keppler Of fice of Inspection & Enforcement U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr Keppler:

MONTICELID NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DFR-2 2 Failure to Perform Surveillance Test on Schedule The Licensee Event Report for this - 'tr re nce is reproduced on the back of this letter. Enclosed 1. _ three co p ies .

This event is reported in compliance with Technical Specification 6.7.B.2.c since the weekly APRM functional scram test was not com-pleted within the time period allowed for weekly tests.

Yours very truly, L 0 !ayer, b ~

Mi q- er of Nuclear Support Services LO!!/J AC /deh cc: Director, IE, USNRC ( 30)

Director, MIPC, USNRC (3)

MPCA Attn: J W Fernan

- """~

790213a / 75 S