ML111400314: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML111400314
| number = ML111400314
| issue date = 05/19/2011
| issue date = 05/19/2011
| title = 05/12/2011 Summary of Public Meeting with Luminant Generation Company on Comanche Peak Nuclear Power Plant, Units 1 and 2, to Discuss 2010 End of Cycle Performance Assessment
| title = Summary of Public Meeting with Luminant Generation Company on Comanche Peak Nuclear Power Plant, Units 1 and 2, to Discuss 2010 End of Cycle Performance Assessment
| author name = Walker W C
| author name = Walker W
| author affiliation = NRC/RGN-IV/DRP/RPB-A
| author affiliation = NRC/RGN-IV/DRP/RPB-A
| addressee name = Flores R
| addressee name = Flores R
Line 13: Line 13:
| page count = 6
| page count = 6
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 May 19, 2011 Rafael Flores, Senior Vice President and Chief Nuclear Officer Luminant Generation Company, LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043
==Subject:==
MEETING
==SUMMARY==
FOR PUBLIC MEETING WITH LUMINANT GENERATION COMPANY ON COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2, 2010 PERFORMANCE
==Dear Mr. Flores:==
On May 12, 2011, representatives of Luminant met with NRC personnel at the Somervell County Expo Center-Exhibit Hall in Glen Rose, Texas, to discuss the NRCs 2010 end of cycle performance assessment. This Category 1 public meeting was held at the request of the NRC to present information regarding plant performance for the 2010 calendar year. The list of attendees is included as Enclosure 1, and the meeting slides are included as Enclosure 2.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely, D. Proulx for Wayne C. Walker Chief, Projects Branch A Division of Reactor Projects Docket: 50-445, 50-446 License: NPF-87, NPF-89
==Enclosures:==
: 1. Attendance List
: 2. Meeting Slides
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
Senior Resident Inspector (John.Kramer@nrc.gov)
Resident Inspector (Brian.Tindell@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker.nrc.gov)
Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)
Project Engineer, DRP/A (Jason.Dykert@nrc.gov)
CPNPP Administrative Assistant (Sue.Sanner@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV OEDO/ETA (Stephanie.Goddard-Bush)
File located R:\_Reactors\EOC2010\CP EOC MS 05122011.pdf ADAMS:  No          Yes          SUNSI Review Complete      Reviewer Initials:
Publicly Available          Non-Sensitive Non-publicly Available      Sensitive PE:DRP/PBA          SPE:DRP/PBA        C:DRP/PBA JDykert              DProulx            WWalker
/RA/                /RA/              /RA/
05/19/2011          05/19/2011        05/19/2011 OFFICIAL RECORD COPY                                    T=Telephone      E=E-mail  F=Fax
    }}

Latest revision as of 04:46, 6 December 2019

Summary of Public Meeting with Luminant Generation Company on Comanche Peak Nuclear Power Plant, Units 1 and 2, to Discuss 2010 End of Cycle Performance Assessment
ML111400314
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/19/2011
From: Webb Patricia Walker
NRC/RGN-IV/DRP/RPB-A
To: Flores R
Luminant Generation Co
References
Download: ML111400314 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 May 19, 2011 Rafael Flores, Senior Vice President and Chief Nuclear Officer Luminant Generation Company, LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043

Subject:

MEETING

SUMMARY

FOR PUBLIC MEETING WITH LUMINANT GENERATION COMPANY ON COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2, 2010 PERFORMANCE

Dear Mr. Flores:

On May 12, 2011, representatives of Luminant met with NRC personnel at the Somervell County Expo Center-Exhibit Hall in Glen Rose, Texas, to discuss the NRCs 2010 end of cycle performance assessment. This Category 1 public meeting was held at the request of the NRC to present information regarding plant performance for the 2010 calendar year. The list of attendees is included as Enclosure 1, and the meeting slides are included as Enclosure 2.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, D. Proulx for Wayne C. Walker Chief, Projects Branch A Division of Reactor Projects Docket: 50-445, 50-446 License: NPF-87, NPF-89

Enclosures:

1. Attendance List
2. Meeting Slides

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

Senior Resident Inspector (John.Kramer@nrc.gov)

Resident Inspector (Brian.Tindell@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker.nrc.gov)

Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)

Project Engineer, DRP/A (Jason.Dykert@nrc.gov)

CPNPP Administrative Assistant (Sue.Sanner@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV OEDO/ETA (Stephanie.Goddard-Bush)

File located R:\_Reactors\EOC2010\CP EOC MS 05122011.pdf ADAMS: No Yes SUNSI Review Complete Reviewer Initials:

Publicly Available Non-Sensitive Non-publicly Available Sensitive PE:DRP/PBA SPE:DRP/PBA C:DRP/PBA JDykert DProulx WWalker

/RA/ /RA/ /RA/

05/19/2011 05/19/2011 05/19/2011 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax