ML15191A251
Letter Sequence Meeting | |
---|---|
MONTHYEARML15191A2512015-07-0909 July 2015
[Table View]July 9, 2015 Public Meeting: Comanch Peak Pre- Application Meeting, Emergency Diesel Generator Voltage and Frequency Technical Specification Changes Project stage: Meeting ML15191A2282015-07-27027 July 2015 7/9/2015 Summary of Pre-submittal Meeting with Luminant Generation Company LLC to Discuss Submittal for License Amendment Request to Revise Technical Specification 3.8.1 for Comanche Peak Nuclear Power Plant, Units 1 and 2 (TACs MF6311 and Project stage: Meeting 2015-07-27 |
ML15191A251 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 07/09/2015 |
From: | Lisa Regner Plant Licensing Branch IV |
To: | Flores R Luminant Generation Co |
Singal B | |
References | |
TAC MF6311, TAC MF6312 | |
Download: ML15191A251 (10) | |
Similar Documents at Comanche Peak | |
---|---|
Category:Meeting Agenda
MONTHYEARPMNS20241399, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant2024-11-0505 November 2024
[Table view]Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant PMNS20231415, Notice of Meeting for the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application2023-12-22022 December 2023 Notice of Meeting for the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application ML23345A2122023-12-11011 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23340A2282023-12-0606 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23340A0902023-12-0606 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23313A0622023-11-0909 November 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23296A1232023-10-23023 October 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23215A1922023-08-0707 August 2023 – August 7, 2023 Presubmittal Meeting Presentation - Relocation of Technical Specification 3.9.3 Nuclear Instrumentation to a Licensee Controlled Document (EPID: L?2023?LRM-0052) PMNS20230863, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Relocate Refueling Operations Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual2023-07-26026 July 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Relocate Refueling Operations Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual PMNS20230867, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Extend the Diesel Generator Allowed Outage Time from 3 Days to 14 Days at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22023-07-26026 July 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Extend the Diesel Generator Allowed Outage Time from 3 Days to 14 Days at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20230624, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant, Units 1 and 22023-05-12012 May 2023 Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant, Units 1 and 2 ML23094A2722023-04-0606 April 2023 – April 6, 2023 Presubmittal Meeting Presentation - Extension Request for Thermal Relief Valves (EPID: L?2023?LRM-0023) PMNS20230363, Meeting with Vistra Operations Company LLC Proposed Alternative for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, for Inservice Testing of Component Cooling Water Heat Exchanger Relief Valves2023-04-0606 April 2023 Meeting with Vistra Operations Company LLC Proposed Alternative for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, for Inservice Testing of Component Cooling Water Heat Exchanger Relief Valves PMNS20230232, Meeting with Vistra Operations Company LLC Proposed License Amendment Request for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, to Take Exception to Regulatory Guide 1.81, Revision 1, Position C.32023-03-0909 March 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, to Take Exception to Regulatory Guide 1.81, Revision 1, Position C.3 PMNS20230133, Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application2023-02-15015 February 2023 Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application PMNS20221254, Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application2023-01-0909 January 2023 Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application ML22140A1082022-05-31031 May 2022 (CPNPP) First License Renewal (60 Years) Application Pre-Application Submittal Meeting 2, Meeting Slides PMNS20220522, Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety2022-05-23023 May 2022 Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants ML21259A0312021-09-30030 September 2021 Initial License Renewal Pre-Application Submittal Meeting Sept 2021 - Safety ML21259A0352021-09-16016 September 2021 License Renewal Pre-Application Submittal Meeting Sept 2021 Environmental Report PMNS20211050, Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Environmental2021-08-13013 August 2021 Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Environmental PMNS20211053, Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety2021-08-0909 August 2021 Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210373, Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-25025 March 2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20210370, Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-25025 March 2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML21068A0292021-03-0909 March 2021 Presentation - 3/24/2021 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20210249, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-0909 March 2021 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20201387, Initial License Renewal pre-application Meeting2020-12-16016 December 2020 Initial License Renewal pre-application Meeting ML20314A3422020-11-12012 November 2020 NRC Teleconference with Comanche Peak Regarding a Proposed Exigent License Amendment Request (LAR) 20-007 TS 3.7.8 Station Service Water System TS 3.8.1 AC Sources - Operating ML20302A2692020-10-28028 October 2020 Teleconference with Vistra Operations Company LLC Regarding a Proposed License Amendment Request to Make a One-Time TS Change to Replace a Station Service Water Pump at Comanche Peak Nuclear Power Plant, Unit No. 2 ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML15191A2512015-07-0909 July 2015 July 9, 2015 Public Meeting: Comanch Peak Pre- Application Meeting, Emergency Diesel Generator Voltage and Frequency Technical Specification Changes ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13045A4102013-02-15015 February 2013 2/28/13 Notice of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 ML12328A1252012-11-20020 November 2012 Licensee Slides from 11/20/12 Pre-Submittal Meeting to Discuss LAR for Spent Fuel Criticality ML12306A3242012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12299A4102012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company, LLC, to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12286A2792012-10-18018 October 2012 Notice of Meeting with Luminant Generating Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12216A2992012-08-27027 August 2012 9/13/12 Notice of Meeting with Luminant Generation Company LLC to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12191A1472012-07-11011 July 2012 8/6/12 Notice of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8615-ME8616) ML12159A1182012-06-11011 June 2012 Notice of 6/26/12 Meeting with Luminant Generation Company LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME86 ML12171A1842012-06-11011 June 2012 6/26/12 Revised Notice of Meeting with Luminant Generation Company, LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML1125702582011-09-13013 September 2011 Licensee Slides from 9/13/11 Meeting with Luminant Generation Company, LLC Regarding Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative... ML1122119682011-08-26026 August 2011 Notice of Meeting with Luminant Generation Company LLC to Discuss Comanche Peak, Units 1 and 2, Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative 8a ML1107401282011-03-15015 March 2011 3/17/11 Notice of Forthcoming Closed Meeting with Luminant Generation Company Via Conference Call to Discuss Generic Request for Additional Information Pertaining to Its Cyber Security Submittal ML0921000502009-07-31031 July 2009 Notice of Pre-Application Meeting with Luminant Generation Company LLC to Discuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0920203432009-07-22022 July 2009 Revised Conference Call with Luminant Generation Company, LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 ML0918207102009-07-0202 July 2009 Revised Notice of Meeting with Representatives of Luminant Generation Co., LLC, Comanche Peak to Discuss Draft Request for Information for Generic Letter 2004-02 Response ML0814400962008-05-23023 May 2008 Meeting Agenda for Closed Security Meeting with Luminant Generating Corporation, LLC to Discuss Security Related Issues and Inspection Results at Comanche Peak Steam Electric Station, Units 1 and 2 2024-11-05 Category:Meeting Notice MONTHYEARPMNS20241399, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant2024-11-0505 November 2024
[Table view]Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant PMNS20231415, Notice of Meeting for the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application2023-12-22022 December 2023 Notice of Meeting for the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application ML23345A2122023-12-11011 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23340A0902023-12-0606 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23340A2282023-12-0606 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23313A0622023-11-0909 November 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23296A1232023-10-23023 October 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23215A1652023-08-0404 August 2023 – August 8, 2023 Presubmittal Meeting Presentation - Technical Specification 3.8.1 AC Sources - Operating Required Action B.4, 14-hour Completion Time (EPID: L?2023?LRM-0053) PMNS20230867, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Extend the Diesel Generator Allowed Outage Time from 3 Days to 14 Days at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22023-07-26026 July 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Extend the Diesel Generator Allowed Outage Time from 3 Days to 14 Days at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20230863, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Relocate Refueling Operations Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual2023-07-26026 July 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Relocate Refueling Operations Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual PMNS20230624, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant, Units 1 and 22023-05-12012 May 2023 Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant, Units 1 and 2 PMNS20230363, Meeting with Vistra Operations Company LLC Proposed Alternative for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, for Inservice Testing of Component Cooling Water Heat Exchanger Relief Valves2023-04-0606 April 2023 Meeting with Vistra Operations Company LLC Proposed Alternative for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, for Inservice Testing of Component Cooling Water Heat Exchanger Relief Valves PMNS20230232, Meeting with Vistra Operations Company LLC Proposed License Amendment Request for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, to Take Exception to Regulatory Guide 1.81, Revision 1, Position C.32023-03-0909 March 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, to Take Exception to Regulatory Guide 1.81, Revision 1, Position C.3 PMNS20230133, Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application2023-02-15015 February 2023 Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application PMNS20221254, Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application2023-01-0909 January 2023 Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application PMNS20220522, Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety2022-05-23023 May 2022 Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20211050, Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Environmental2021-08-13013 August 2021 Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Environmental PMNS20211053, Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety2021-08-0909 August 2021 Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210370, Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-25025 March 2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20210373, Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-25025 March 2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20210249, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-0909 March 2021 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20201387, Initial License Renewal pre-application Meeting2020-12-16016 December 2020 Initial License Renewal pre-application Meeting ML20302A2692020-10-28028 October 2020 Teleconference with Vistra Operations Company LLC Regarding a Proposed License Amendment Request to Make a One-Time TS Change to Replace a Station Service Water Pump at Comanche Peak Nuclear Power Plant, Unit No. 2 ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML15191A2512015-07-0909 July 2015 July 9, 2015 Public Meeting: Comanch Peak Pre- Application Meeting, Emergency Diesel Generator Voltage and Frequency Technical Specification Changes ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13045A4102013-02-15015 February 2013 2/28/13 Notice of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 ML12306A3242012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12299A4102012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company, LLC, to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12286A2792012-10-18018 October 2012 Notice of Meeting with Luminant Generating Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12216A2992012-08-27027 August 2012 9/13/12 Notice of Meeting with Luminant Generation Company LLC to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12191A1472012-07-11011 July 2012 8/6/12 Notice of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8615-ME8616) ML12171A1842012-06-11011 June 2012 6/26/12 Revised Notice of Meeting with Luminant Generation Company, LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML12159A1182012-06-11011 June 2012 Notice of 6/26/12 Meeting with Luminant Generation Company LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME86 ML12048A8612012-02-17017 February 2012 Notice of Meeting to Discuss the Scope of Plant Modifications Being Implemented for Comanche Peak Nuclear Power Plant - Fire Protection Modifications ML1122119682011-08-26026 August 2011 Notice of Meeting with Luminant Generation Company LLC to Discuss Comanche Peak, Units 1 and 2, Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative 8a ML1112406132011-05-0404 May 2011 Notice of *Errata* Public Meeting with Luminant Generation Company, LLC, to Discuss Performance Results for the Period of 01/01/10 - 12/31/10 ML1107401282011-03-15015 March 2011 3/17/11 Notice of Forthcoming Closed Meeting with Luminant Generation Company Via Conference Call to Discuss Generic Request for Additional Information Pertaining to Its Cyber Security Submittal ML1035702882010-12-23023 December 2010 Notice of Regulatory Conference with Luminant Generation Company, LLC ML1011210342010-04-22022 April 2010 Notice of Meeting with Luminant Generation Company, LLC to Discuss Issues Related to Comanche Peak Nuclear Power Plant ML0921000502009-07-31031 July 2009 Notice of Pre-Application Meeting with Luminant Generation Company LLC to Discuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0920203432009-07-22022 July 2009 Revised Conference Call with Luminant Generation Company, LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 ML0918207102009-07-0202 July 2009 Revised Notice of Meeting with Representatives of Luminant Generation Co., LLC, Comanche Peak to Discuss Draft Request for Information for Generic Letter 2004-02 Response ML0915905632009-06-0808 June 2009 Notice of Public Meeting with Luminant Generation to Discuss Performance Results of the Comanche Peak Steam Electric Station for the Period of January 1 Through December 31, 2008 ML0814400882008-05-23023 May 2008 Notice of Closed Meeting with Luminant Generating Corporation, LLC to Discuss Security Related Issues and Inspection Results at Comanche Peak Steam Electric Station, Units 1 and 2 ML0814106622008-05-20020 May 2008 Notice of Meeting to Discuss End-of-cycle Public Meeting Between the NRC & Luminant Generation Company, LLC to Present & Discuss Performance Results of the Comanche, Units 1 & 2, Facility for the Period of January 1 Though December 31, 200 ML0813001312008-05-0909 May 2008 Notice of Significant Licensee Meeting with Luminant Generating Corporation, LLC to Discuss Security Related Issues and Inspection Results at Comanche Peak Steam Electric Station, Units 1 & 2 ML0812800772008-05-0606 May 2008 Notice of Meeting with Luminant Generating Corporation, LLC to Discuss Security Related Issues and Inspection Results at Comanche Peak Steam Electric Station, Units 1 and 2 2024-11-05 Category:Meeting Summary MONTHYEARML24029A0022024-03-13013 March 2024
[Table view]Dseis Meeting Summary 120723 ML24019A0342024-01-30030 January 2024 Public Meeting Summary - 01-04-2024 - Comanche Peak LRA - Structures Monitoring Program ML23255A0622023-09-18018 September 2023 Summary of August 7, 2023, Presubmittal Meeting with Vistra Operations Company LLC to Discuss the Proposed LAR to Relocate Refueling Operations TS 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual ML23132A1572023-05-18018 May 2023 Summary of the License Renewal Environmental Audit (EPID Number: L-2022-LNE-004) (Docket Numbers 50-445 and 50-446) ML23103A3002023-04-14014 April 2023 Summary of March 28, 2023, Presubmittal Meeting with Vistra Operations Company LLC to Discuss Proposed LAR to Take Exception to RG 1.81, Rev. 1, Shared Emergency and Shutdown Electric Systems for Multi-Unit Nuclear Power Plants, ML23081A5232023-04-12012 April 2023 Public Scoping Meeting for Environmental Review of Comanche Peak Nuclear Power Plant (Cpnpp), Unit Nos. 1 and 2 License Renewal Application ML23101A0432023-04-12012 April 2023 April 6, 2023, Summary of Meeting with Vistra Operations Company LLC to Discuss Proposed Alternative Regarding Inservice Testing of Various Thermal Relief Valves for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML22151A1842022-06-22022 June 2022 License Renewal Application May 26, 2022 Pre-submittal Public Meeting Summary ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22020A1782022-01-31031 January 2022 Summary of Conference Call Regarding the Fall 2021 Steam Generator Tube Inspections ML21259A1492021-10-26026 October 2021 CPNPP, Unit Nos. 1 and 2 - Meeting Summary for Environmental Pre Submittal Meeting for Initial License Renewal Application on September 21, 2021 ML21259A1402021-10-0505 October 2021 Meeting Summary for Safety Pre Submittal Meeting for Initial License Renewal Application on September 21, 2021 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21130A6832021-05-20020 May 2021 Summary of April 7, 2021, Presubmittal Meeting with Vistra Operations Company LLC Regarding the Proposed Exemption Request to Defer the Annual Force-On-Force Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML21124A0072021-05-10010 May 2021 Meeting Summary for Environmental Pre-Submittal Meeting for Initial License Renewal Application ML21110A0602021-05-0707 May 2021 Summary of April 6, 2021, Meeting with Vistra Operations Company LLC to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML21099A2752021-04-15015 April 2021 Summary of Teleconference with Vistra Operations Company LLC to Discuss Proposed LAR to Adopt TSTF-505, Rev. 2, to Provide Risk-Informed Extended Completion Times for Comanche Peak, Units 1 and 2 ML20351A2592021-01-0505 January 2021 Summary of November 12, 2020, Teleconference with Vistra Operations Company LLC Proposed License Amendment Request for One-Time TS Revision to Replace Station Service Water Pump ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20115E3932020-04-30030 April 2020 Summary of April 6 and 7, 2020, COVID-19 Related Presubmittal Teleconferences with Vistra Operations Company LLC to Discuss Licensing Actions Supporting the Comanche Peak Unit No. 2 Spring 2020 Refueling Outage ML20044D3052020-02-26026 February 2020 Summary of Teleconference with Vistra Operations Company, LLC to Discuss a Proposed License Amendment Request for Changes to Certain Emergency Action Levels for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (EPID L-2020-LRM-000 ML19352E3172020-01-0808 January 2020 Summary of Teleconference with Vistra Operations Company LLC to Discuss a Proposed License Amendment Request to Change TS 3.8.1, AC Sources - Operating for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML19311C2122019-11-13013 November 2019 Summary of November 5, 2019, Teleconference with Vistra Operations Company LLC to Discuss a Proposed License Amendment Request to Change TS 3.8.1, Ac Sources - Operating for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML18275A3142018-10-16016 October 2018 Summary of September 17, 2018, Public Teleconference with Vistra Operations Company, LLC, on Proposed Changes to the Emergency Plan for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML17137A1742017-05-22022 May 2017 Summary of Conference Call Regarding the Spring 2017 Steam Generator Tube Inspections ML16194A4962016-07-12012 July 2016 Summary of Annual Performance Assessment Meeting and Public Open House Regarding Comanche Peak Nuclear Power Plant 2015 Performance ML15191A2282015-07-27027 July 2015 7/9/2015 Summary of Pre-submittal Meeting with Luminant Generation Company LLC to Discuss Submittal for License Amendment Request to Revise Technical Specification 3.8.1 for Comanche Peak Nuclear Power Plant, Units 1 and 2 (TACs MF6311 and ML15191A2512015-07-0909 July 2015 July 9, 2015 Public Meeting: Comanch Peak Pre- Application Meeting, Emergency Diesel Generator Voltage and Frequency Technical Specification Changes ML14188C4402014-07-22022 July 2014 6/3/2014 Summary of Meeting with Luminant Generation Company LLC to Discuss Proposed Modifications to Technical Specifications to Install Backup Transformer XST1A for Comanche Peak, Units 1 and 2 ML13067A0292013-03-15015 March 2013 2/28/13 - Summary of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 ML12341A0812012-12-18018 December 2012 Summary of 11/15/12 Meeting with Luminant Generation Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12332A3652012-12-18018 December 2012 Summary of Meeting with Luminant Generation Company LLC, to Discuss License Amendment Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications (TAC Nos. ME8896-ME8897) ML12283A3502012-10-25025 October 2012 Summary of 9/13/12 Meeting with Luminant Generation Company LLC to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12229A5042012-09-19019 September 2012 8/6/2012 Summary of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML12188A6972012-07-18018 July 2012 6/26/12 Summary of Meeting with Luminant Generation Company LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8 ML12072A3432012-03-12012 March 2012 3/6/2012 Summary of Meeting with Luminant Generation Company, LLC Regarding Planned Modifications to Resolve Fire Protection Circuit Interactions ML1125904822011-10-14014 October 2011 Summary of Meeting with Luminant to Discuss Comanche Peak, Units 1 and 2, Proposed Request to Adopt Risk-Informed Technical Specification Task Force Initiative 8a, Relocate LCOs for RPS and ESFAS Instrumentation to Licensee Control ML1114001482011-05-23023 May 2011 Summary of Conference Call on 4/14/2011 with Nrr/Dci/Csgb Regarding the Spring 2011 Steam Generator Tube Inspections ML1114003142011-05-19019 May 2011 Summary of Public Meeting with Luminant Generation Company on Comanche Peak Nuclear Power Plant, Units 1 and 2, to Discuss 2010 End of Cycle Performance Assessment ML1108004622011-03-28028 March 2011 3/17/11 Summary of Closed Meeting with Luminant Generation Company Via Conference Call to Discuss Generic Request for Additional Information Pertaining to Its Cyber Security Submittal ML1101908002011-01-18018 January 2011 Summary of Meeting with Luminant Generation Company LLC Regarding a Preliminary Finding with Moderate Safety Significance ML1034205662010-12-22022 December 2010 Memo Summary of the November 3, 2010, Public Meeting with the United States - Advanced Pressurized Water Reactor Design Centered Working Group to Discuss Inspections, Test, Analyses, and Acceptance Criteria, Conceptual Design Information. ML1016501752010-06-21021 June 2010 6/10/10 Summary of Closed Meeting with Luminant Generation Company, LLC to Discuss Comanche Peak Nuclear Power Plant, Units 1 and 2 Implementation Plan/Information Pertaining to Defensive Strategy for Cyber Security Submittal ML1013906402010-05-19019 May 2010 Summary of Public Meeting with Luminant Generation Company on Comanche Peak Nuclear Power Plant, Units 1 and 2, 2009 Performance ML0924401642009-09-14014 September 2009 Meeting Summary, Pre-Application Meeting on with Luminant Generation Company LLC to Dicuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0919705782009-07-31031 July 2009 Summary of Category 1 Meeting with Luminant Generation Company LLC, Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML0918303012009-07-0202 July 2009 Summary of Annual Performance Assessment Meeting for Comanche Peak Steam Electric Stations ML0729204682007-10-29029 October 2007 09/25/2007, Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Strategic Teaming and Resource Sharing Representatives to Discuss License Renewal Activities ML0720005052007-07-31031 July 2007 Summary of Meeting with Txu Generation Company LP to Discussed Regarding the Plans for Methodology Transition and Power Uprate ML0717200702007-06-20020 June 2007 Summary of Meeting with Txu Power Regarding Comanche Peak Steam Electric Stations End-of-Cycle Assessment for 2006 2024-03-13 |
Text
Luminant Pre-Application Meeting Agenda Tim Hope, Mgr, Nuclear Licensing Introductions Rob Slough, Consulting Licensing Analyst Current TS 3.8.1 and Proposed SR Changes Jim Andrachek, Westinghouse Evaluation Methodology NRC Staff Questions/Feedback Tim Hope, Mgr, Nuclear Licensing Closing remarks/summary
Need for the Proposed Changes
- During several Component Design Basis Inspections (CDBIs),
NRC Inspectors have questioned whether the impacts of the allowable tolerances in DG frequency and voltage have been evaluated with respect to ECCS performance.
- Issue raised at Comanche Peak during CDBIs in 2010 and 2013, documented in Inspection Reports 2010-006 and 2013-007.
- The PWROG developed a methodology to generically address the issue and requested that the NRC recognize that a licensee awaiting NRC approval of the methodology is taking timely corrective action. NRC stated that they do not agree, and that licensees should not wait for approval to take corrective action.
Summary of Proposed Changes
- 1. The proposed changes would revise Technical Specifications (TS) 3.8.1, "AC Sources - Operating," Surveillance Requirements (SRs) related to Diesel Generator (DG) voltage (V), and frequency (Hz) to:
- Specify a nominal voltage and frequency in SR 3.8.1.2
- Increase the steady state lower voltage limit and narrow (i.e.,
reduce) the steady state frequency range specified in SRs:
3.8.1.7 3.8.1.15 3.8.1.11 3.8.1.19 3.8.1.12 3.8.1.20
- 2. The note in SR 3.8.1.13 will be deleted as it contains out-of-date information for Unit 2 that no longer applies to the SR.
Proposed SR Changes Current Limits Proposed Limits Voltage > 6480 - < 7150 V > 6555 - < 7150 V Frequency > 58.8 - < 61.2 Hz > 59.4 - < 60.6 Hz
Benefit of Proposed Changes The proposed changes will ensure that the effect of variations in EDG steady state voltage and frequency, associated with the EDG voltage regulator and governor, on the equipment powered by the EDGs has been evaluated to ensure that the equipment will continue to perform their specified safety functions.
Precedents
- On April 11, 2013, the NRC issued Amendment No. 224, Docket No.
50-361, to Wolf Creek Generating Station Unit No. 1. The amendment revised the TS 3.8.1, "AC Sources -Operating, Surveillance Requirements related to diesel generator test loads, voltage, and frequency. (ML13077A147)
- On October 21, 2014, the NRC issued Amendment No. 307, Docket Nos. 50-317 and 50-318, to Calvert Cliffs Nuclear Power Plant Unit Nos. 1 and 2. The amendment revised the TS 3.8.1, "AC Sources -
Operating, Surveillance Requirement (SR) 3.8.1.17 and modified SRS 3.8.1.8, 3.8.1.11, and 3.8.2.1. The revisions were related to diesel generator (DG) testing duration, loading requirements, and frequency of DG sequencer testing. (ML14280A522)
Schedule Luminant Power expects to submit LAR 15-001 for Staff review by August 31, 2015, to be implemented no later than 120 days after issuance of the License Amendment.
Description of Methodology
- 1. Determine the affect of EDG steady-state frequency and voltage tolerances associated with the governor and voltage regulator on:
- Essential motor loads such as:
- Emergency Core Cooling System (ECCS) pumps,
- Motor-operated valves (MOVs),
- Fans and blowers credited in the dose consequence analyses, consistent with the Ventilation Filter Testing Program.
- EDG loading calculations
- EDG fuel oil consumption calculations
- 2. Combine the frequency and voltage tolerances with other uncertainties to revise the pump inservice test (IST) curves to account for these tolerances.
- 3. Revise the affected SRs to include the frequency and voltage tolerances and ensure that the EDG operates within the specified tolerance bands.
Example of the Methodology to Adjust the Pump IST Curves Figure 5 4000 3500 3000 Minimum Curve TDH (Feet)
Vendor Curve Measurment Unc Total Unc 2500 2000 1500 0 100 200 300 400 500 600 Flow (GPM)
Questions? Feedback?