ML032481278

From kanterella
Jump to navigation Jump to search
Agenda and Handout for Public Meeting Between NRC and Firstenergy Nuclear Operating Company Davis-Besse Nuclear Power Station
ML032481278
Person / Time
Site: Beaver Valley, Davis Besse, Perry, Comanche Peak
Issue date: 09/10/2003
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
References
Download: ML032481278 (9)


Text

Public Meeting Between USNRC Oversight Panel and FirstEnergy Nuclear Operating Company September 10, 2003

Davis-Besse Oversight Panel - Public Meeting September 2003 PURPOSES OF THIS MEETING

  • Discuss Licensees Progress on Implementing the Return to Service Plan
  • Inform the Public of the NRCs Oversight Panel Activities 2

Davis-Besse Oversight Panel - Public Meeting September 2003 AGENDA

  • Introduction and Opening Remarks
  • Summary of August 12th Public Meetings
  • Discussion of Significant NRC Activities Since August 12th Public Meeting
  • Licensee Presentation on the Status of Their Return to Service Plan
  • Adjourn NRC meeting with FENOC

<break>

  • Public Comments and Questions of NRC
  • Adjourn Meeting 3

Davis-Besse Oversight Panel - Public Meeting September 2003

SUMMARY

OF AUGUST 12, 2003 PUBLIC MEETING

  • Topics Discussed

- High Pressure Injection Pumps

- Electrical Distribution System

- Plant Readiness for Mode 4

- Operations Start-Up Plan

- Restart Milestones/Actions

- Safety Culture Assessments Results and Readiness for Mode 4/3

- Quality Assurance Oversight

  • Transcripts of the August 12, 2003 meetings are available on our web site.

http://www.nrc.gov/

4

Davis-Besse Oversight Panel - Public Meeting September 2003 SIGNIFICANT NRC ACTIVITIES SINCE AUGUST 12 PUBLIC MEETING

  • Closed Restart Checklist Item 6g - License Amendment Request for High and Low Pressure Injection Systems
  • Confirmatory Action Letter Update 5

Davis-Besse Oversight Panel - Public Meeting September 2003 CONTINUING NRC ACTIVITIES

  • System Health Reviews / Design Issues Inspection
  • Corrective Action Team Inspection
  • Safety Culture / Safety Conscious Work Environment Inspection
  • Resident Inspection 6

Davis-Besse Oversight Panel - Public Meeting September 2003 UPCOMING NRC ACTIVITIES

  • Under-Vessel Head Inspection
  • Public Meeting to Discuss Licensee Assessment and Ongoing Improvement Initiatives to Address Safety Culture
  • Review of Inaccurate / Incomplete Required Records and Submittals Inspection
  • Follow up on Potentially Risk-Significant Issues (Containment Emergency Sump and High Pressure Injection Pumps)
  • Restart Assessment Team Inspection 7

Davis-Besse Oversight Panel - Public Meeting September 2003 PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION PORT CLINTON, OHIO September 10th, 2003, 7:00 pm EDT Purpose of Meeting:

Inform the Public of the NRCs Oversight Panel Activities 8

Davis-Besse Oversight Panel - Public Meeting September 2003 GOALS

  • Brief Public With Results of Afternoon Meeting with FENOC
  • Receive Comments and Questions From Public To ensure we hear all comments, please limit comments or questions to 5 minutes each. We will follow the format from previous meetings where we start with local members of the public.

9