Category:Meeting Agenda
MONTHYEARPMNS20241399, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant2024-11-0505 November 2024 Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant PMNS20231415, Notice of Meeting for the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application2023-12-22022 December 2023 Notice of Meeting for the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application ML23345A2122023-12-11011 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23340A2282023-12-0606 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23340A0902023-12-0606 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23313A0622023-11-0909 November 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23296A1232023-10-23023 October 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23215A1922023-08-0707 August 2023 – August 7, 2023 Presubmittal Meeting Presentation - Relocation of Technical Specification 3.9.3 Nuclear Instrumentation to a Licensee Controlled Document (EPID: L?2023?LRM-0052) PMNS20230863, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Relocate Refueling Operations Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual2023-07-26026 July 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Relocate Refueling Operations Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual PMNS20230867, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Extend the Diesel Generator Allowed Outage Time from 3 Days to 14 Days at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22023-07-26026 July 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Extend the Diesel Generator Allowed Outage Time from 3 Days to 14 Days at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20230624, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant, Units 1 and 22023-05-12012 May 2023 Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant, Units 1 and 2 ML23094A2722023-04-0606 April 2023 – April 6, 2023 Presubmittal Meeting Presentation - Extension Request for Thermal Relief Valves (EPID: L?2023?LRM-0023) PMNS20230363, Meeting with Vistra Operations Company LLC Proposed Alternative for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, for Inservice Testing of Component Cooling Water Heat Exchanger Relief Valves2023-04-0606 April 2023 Meeting with Vistra Operations Company LLC Proposed Alternative for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, for Inservice Testing of Component Cooling Water Heat Exchanger Relief Valves PMNS20230232, Meeting with Vistra Operations Company LLC Proposed License Amendment Request for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, to Take Exception to Regulatory Guide 1.81, Revision 1, Position C.32023-03-0909 March 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, to Take Exception to Regulatory Guide 1.81, Revision 1, Position C.3 PMNS20230133, Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application2023-02-15015 February 2023 Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application PMNS20221254, Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application2023-01-0909 January 2023 Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application ML22140A1082022-05-31031 May 2022 (CPNPP) First License Renewal (60 Years) Application Pre-Application Submittal Meeting 2, Meeting Slides PMNS20220522, Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety2022-05-23023 May 2022 Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants ML21259A0312021-09-30030 September 2021 Initial License Renewal Pre-Application Submittal Meeting Sept 2021 - Safety ML21259A0352021-09-16016 September 2021 License Renewal Pre-Application Submittal Meeting Sept 2021 Environmental Report PMNS20211050, Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Environmental2021-08-13013 August 2021 Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Environmental PMNS20211053, Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety2021-08-0909 August 2021 Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210373, Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-25025 March 2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20210370, Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-25025 March 2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML21068A0292021-03-0909 March 2021 Presentation - 3/24/2021 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20210249, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-0909 March 2021 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20201387, Initial License Renewal pre-application Meeting2020-12-16016 December 2020 Initial License Renewal pre-application Meeting ML20314A3422020-11-12012 November 2020 NRC Teleconference with Comanche Peak Regarding a Proposed Exigent License Amendment Request (LAR) 20-007 TS 3.7.8 Station Service Water System TS 3.8.1 AC Sources - Operating ML20302A2692020-10-28028 October 2020 Teleconference with Vistra Operations Company LLC Regarding a Proposed License Amendment Request to Make a One-Time TS Change to Replace a Station Service Water Pump at Comanche Peak Nuclear Power Plant, Unit No. 2 ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML15191A2512015-07-0909 July 2015 July 9, 2015 Public Meeting: Comanch Peak Pre- Application Meeting, Emergency Diesel Generator Voltage and Frequency Technical Specification Changes ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13045A4102013-02-15015 February 2013 2/28/13 Notice of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 ML12328A1252012-11-20020 November 2012 Licensee Slides from 11/20/12 Pre-Submittal Meeting to Discuss LAR for Spent Fuel Criticality ML12306A3242012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12299A4102012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company, LLC, to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12286A2792012-10-18018 October 2012 Notice of Meeting with Luminant Generating Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12216A2992012-08-27027 August 2012 9/13/12 Notice of Meeting with Luminant Generation Company LLC to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12191A1472012-07-11011 July 2012 8/6/12 Notice of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8615-ME8616) ML12159A1182012-06-11011 June 2012 Notice of 6/26/12 Meeting with Luminant Generation Company LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME86 ML12171A1842012-06-11011 June 2012 6/26/12 Revised Notice of Meeting with Luminant Generation Company, LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML1125702582011-09-13013 September 2011 Licensee Slides from 9/13/11 Meeting with Luminant Generation Company, LLC Regarding Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative... ML1122119682011-08-26026 August 2011 Notice of Meeting with Luminant Generation Company LLC to Discuss Comanche Peak, Units 1 and 2, Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative 8a ML1107401282011-03-15015 March 2011 3/17/11 Notice of Forthcoming Closed Meeting with Luminant Generation Company Via Conference Call to Discuss Generic Request for Additional Information Pertaining to Its Cyber Security Submittal ML0921000502009-07-31031 July 2009 Notice of Pre-Application Meeting with Luminant Generation Company LLC to Discuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0920203432009-07-22022 July 2009 Revised Conference Call with Luminant Generation Company, LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 ML0918207102009-07-0202 July 2009 Revised Notice of Meeting with Representatives of Luminant Generation Co., LLC, Comanche Peak to Discuss Draft Request for Information for Generic Letter 2004-02 Response ML0814400962008-05-23023 May 2008 Meeting Agenda for Closed Security Meeting with Luminant Generating Corporation, LLC to Discuss Security Related Issues and Inspection Results at Comanche Peak Steam Electric Station, Units 1 and 2 2024-11-05
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML23215A1922023-08-0707 August 2023 – August 7, 2023 Presubmittal Meeting Presentation - Relocation of Technical Specification 3.9.3 Nuclear Instrumentation to a Licensee Controlled Document (EPID: L?2023?LRM-0052) ML23215A1652023-08-0404 August 2023 – August 8, 2023 Presubmittal Meeting Presentation - Technical Specification 3.8.1 AC Sources - Operating Required Action B.4, 14-hour Completion Time (EPID: L?2023?LRM-0053) ML23094A2722023-04-0606 April 2023 – April 6, 2023 Presubmittal Meeting Presentation - Extension Request for Thermal Relief Valves (EPID: L?2023?LRM-0023) ML23081A0252023-03-22022 March 2023 – March 28, 2023 Pre-submittal Meeting Presentation - LAR for Exception to RG 1.81 (EPID L?2023?LRM-0015) ML23045A1552023-02-14014 February 2023 Public Meeting February 23, 2023 - Presentation Slides ML23011A0872023-01-10010 January 2023 License Renewal Scoping Meeting, Comanche Peak Nuclear Power Plant, Units 1 and 2 - Meeting Slides ML22140A1082022-05-31031 May 2022 (CPNPP) First License Renewal (60 Years) Application Pre-Application Submittal Meeting 2, Meeting Slides ML21259A0312021-09-30030 September 2021 Initial License Renewal Pre-Application Submittal Meeting Sept 2021 - Safety ML21259A0292021-09-16016 September 2021 Initial License Renewal - NRC Presubmittal Meeting Slides - Safety ML21259A0352021-09-16016 September 2021 License Renewal Pre-Application Submittal Meeting Sept 2021 Environmental Report ML21259A0332021-09-16016 September 2021 Initial License Renewal Application - NRC Presubmittal Meeting Slides - Environmental ML21097A0522021-04-0707 April 2021 NRC Talking Points - 4/7/2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for Comanche Peak ML21068A0292021-03-0909 March 2021 Presentation - 3/24/2021 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML21007A2562021-01-12012 January 2021 Luminant-CPNPP License Renewal SAMA January 12 2021 Public Mtg ML20314A3422020-11-12012 November 2020 NRC Teleconference with Comanche Peak Regarding a Proposed Exigent License Amendment Request (LAR) 20-007 TS 3.7.8 Station Service Water System TS 3.8.1 AC Sources - Operating ML20097B2852020-04-0606 April 2020 April 7, 2020, Presubmittal Teleconference Discussion Topics - Proposed Relief Requests for Deferral of Several Inspections and Tests from 2RF18 (Spring 2020) to 2RF19 (Fall 2021) ML20097C2662020-04-0606 April 2020 April 6, 2020, Presubmittal Teleconference Presentation - License Amendment Request Revise Technical Specification 5.5.9 ML20036D4102020-02-12012 February 2020 Pre-Submittal Meeting for: Comanche Peak Nuclear Power Plant Docket Nos. 50-445 and 50-446 February 12, 2020 - License Amendment Request for Changes to Certain Emergency Action Levels ML19296D5592019-10-24024 October 2019 Pre-Submittal Meeting with NRC for Proposed License Amendment Request (LAR) 15-001 TS 3.8.1, AC Sources - Operating, Presentation ML14077A2872014-03-18018 March 2014 Transcript of the 612th ACRS Meeting, March 6, 2014 (Open) Pages 1-317 ML13059A1812013-02-28028 February 2013 Licensee Slides for 2/28/13 Meeting Via Conference Call with Luminant Generation Company, LLC, ML12328A1252012-11-20020 November 2012 Licensee Slides from 11/20/12 Pre-Submittal Meeting to Discuss LAR for Spent Fuel Criticality ML12229A5042012-09-19019 September 2012 8/6/2012 Summary of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML12236A3322012-08-23023 August 2012 Non-proprietary - Presentation for September 13, 2012, Proposed License Amendment Request for Spend Fuel Pool Criticality Analysis ML12188A6972012-07-18018 July 2012 6/26/12 Summary of Meeting with Luminant Generation Company LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8 ML12156A2052012-05-31031 May 2012 Presentation to NRC for LAR 12 ML1125702582011-09-13013 September 2011 Licensee Slides from 9/13/11 Meeting with Luminant Generation Company, LLC Regarding Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative... ML1114003142011-05-19019 May 2011 Summary of Public Meeting with Luminant Generation Company on Comanche Peak Nuclear Power Plant, Units 1 and 2, to Discuss 2010 End of Cycle Performance Assessment ML0924401642009-09-14014 September 2009 Meeting Summary, Pre-Application Meeting on with Luminant Generation Company LLC to Dicuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0919400842009-07-0909 July 2009 Luminant RAI 22 and 23 SBLOCA, Vortex, Air Ingestion, Void Fraction and Flashing Issues ML0919402772009-07-0909 July 2009 Luminant Holistic Overview: Presentation Will Cover Information Related to RAIs 1 - 5, 7, 12 - 14,16 - 19, 21, 25 - 36 and Overall Response to GL 2004-02 ML0919400832009-07-0909 July 2009 Pci RAI 8, Test Protocol, Erosion Issue, RAI 15, Test Protocol, Latent Fiber Issue, Areva RAI 20, Test Flume, Fiberglass Larges Question ML0919400852009-07-0909 July 2009 Luminant RAI 24 and 37, Secondary Line Breaks, Debris Load and Testing ML0919604492009-07-0808 July 2009 Alion Meeting Presentations on RAI 9 - Pool Fill Transport, & RAI 6 - Fiber Erosion Testing ML0828204232008-10-0707 October 2008 Meeting Handout - Comanche Peak Col Application Public Orientation Meeting ML0817100272008-06-12012 June 2008 Second Handout for Comanche Peak Public Outreach Meeting on June 12, 2008 ML0816201432008-06-10010 June 2008 End-of-Cycle Meeting Summary 6/5/08 ML0729204682007-10-29029 October 2007 09/25/2007, Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Strategic Teaming and Resource Sharing Representatives to Discuss License Renewal Activities ML0717200702007-06-20020 June 2007 Summary of Meeting with Txu Power Regarding Comanche Peak Steam Electric Stations End-of-Cycle Assessment for 2006 ML0720101702007-05-23023 May 2007 Enclosure 3 - 5/23/07 P.M. Meeting Slides - Comanche Peak Steam Electric Station, Units 1 and 2 - Summary of Meeting Held on 5/23/07 with Txu Generation Company LP to Discuss the Plans for Methodology Transition and Power Uprate ML0720101742007-05-23023 May 2007 Enclosure 2 - 5/23/07 A.M. Meeting Slides - Comanche Peak Steam Electric Station, Units 1 and 2 - Summary of Meeting Held on 5/23/07 with Txu Generation Company LP to Discuss the Plans for Methodology Transition and Power Uprate ML0707202502006-12-12012 December 2006 12/12-13/2006 Slides, Txu Power Comanche Peak Site, NRC Onsite Review, Site Geotechnical Investigation Activities. ML0435101002004-11-10010 November 2004 Meeting Slides - Nrc/Stars Plant Aging Management Center of Business Meeting ML0330402882003-10-30030 October 2003 Meeting Handout Materials Regarding STARS-IRAG/NRC Meeting to Discuss Topics Taken from the June 10.11, 2003, Workshop ML0324812782003-09-10010 September 2003 Agenda and Handout for Public Meeting Between NRC and Firstenergy Nuclear Operating Company Davis-Besse Nuclear Power Station ML0319206482003-06-10010 June 2003 Meeting Handouts for STARS-IRAG/NRC Workshop to Discuss Selected Topics Listed in the Agenda Attached to Meeting Notice ML0234504632002-12-10010 December 2002 05000445; Txu Energy, Comanche Peak, Public Exit Meeting - December 10, 2002-Licensee Handouts ML0231200242002-11-0707 November 2002 Meeting Handouts - Meeting with Strategic Teaming and Resources Sharing - Integrated Regulatory Affairs Group ML0208705662002-04-15015 April 2002 Meetingsummary with Stars and the NRC to Inform the NRC About Current Stars Activities ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary 2023-08-07
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23332A2772023-11-0707 November 2023 CPNPP Dseis Slide for 12/7/23 Public Meetings_112223 ML23215A1922023-08-0707 August 2023 – August 7, 2023 Presubmittal Meeting Presentation - Relocation of Technical Specification 3.9.3 Nuclear Instrumentation to a Licensee Controlled Document (EPID: L?2023?LRM-0052) ML23215A1652023-08-0404 August 2023 – August 8, 2023 Presubmittal Meeting Presentation - Technical Specification 3.8.1 AC Sources - Operating Required Action B.4, 14-hour Completion Time (EPID: L?2023?LRM-0053) ML23094A2722023-04-0606 April 2023 – April 6, 2023 Presubmittal Meeting Presentation - Extension Request for Thermal Relief Valves (EPID: L?2023?LRM-0023) ML23081A0252023-03-22022 March 2023 – March 28, 2023 Pre-submittal Meeting Presentation - LAR for Exception to RG 1.81 (EPID L?2023?LRM-0015) ML23045A1552023-02-14014 February 2023 Public Meeting February 23, 2023 - Presentation Slides ML23011A0872023-01-10010 January 2023 License Renewal Scoping Meeting, Comanche Peak Nuclear Power Plant, Units 1 and 2 - Meeting Slides ML22140A1082022-05-31031 May 2022 (CPNPP) First License Renewal (60 Years) Application Pre-Application Submittal Meeting 2, Meeting Slides ML21259A0312021-09-30030 September 2021 Initial License Renewal Pre-Application Submittal Meeting Sept 2021 - Safety ML21259A0292021-09-16016 September 2021 Initial License Renewal - NRC Presubmittal Meeting Slides - Safety ML21259A0332021-09-16016 September 2021 Initial License Renewal Application - NRC Presubmittal Meeting Slides - Environmental ML21259A0352021-09-16016 September 2021 License Renewal Pre-Application Submittal Meeting Sept 2021 Environmental Report ML21095A3052021-04-0707 April 2021 4/7/2021 Presubmittal Meeting Presentation - Comanche Peak, Units 1 and 2 - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 and Subsection C.3(l)(1) (L-2021-LRM-0039) ML21097A0522021-04-0707 April 2021 NRC Talking Points - 4/7/2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for Comanche Peak ML21068A0292021-03-0909 March 2021 Presentation - 3/24/2021 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML21007A2562021-01-12012 January 2021 Luminant-CPNPP License Renewal SAMA January 12 2021 Public Mtg ML20314A3422020-11-12012 November 2020 NRC Teleconference with Comanche Peak Regarding a Proposed Exigent License Amendment Request (LAR) 20-007 TS 3.7.8 Station Service Water System TS 3.8.1 AC Sources - Operating ML20036D4102020-02-12012 February 2020 Pre-Submittal Meeting for: Comanche Peak Nuclear Power Plant Docket Nos. 50-445 and 50-446 February 12, 2020 - License Amendment Request for Changes to Certain Emergency Action Levels ML19337A6622019-12-0303 December 2019 Revised Comanche Peak Pre-Submittal Meeting with NRC for Proposed License Amendment Request (LAR) 15-001 TS 3.8.1, AC Sources -- Operating ML19324D3482019-11-0505 November 2019 December 3, 2019 Pre-Submittal Meeting Presentation - Proposed License Amendment Request (LAR) 15-001 TS 3.8.1, AC Sources - Operating (L-2019-LRM-0072) ML14077A2872014-03-18018 March 2014 Transcript of the 612th ACRS Meeting, March 6, 2014 (Open) Pages 1-317 ML13059A1812013-02-28028 February 2013 Licensee Slides for 2/28/13 Meeting Via Conference Call with Luminant Generation Company, LLC, ML12229A5042012-09-19019 September 2012 8/6/2012 Summary of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML12236A3322012-08-23023 August 2012 Non-proprietary - Presentation for September 13, 2012, Proposed License Amendment Request for Spend Fuel Pool Criticality Analysis ML12188A6972012-07-18018 July 2012 6/26/12 Summary of Meeting with Luminant Generation Company LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8 ML1125702582011-09-13013 September 2011 Licensee Slides from 9/13/11 Meeting with Luminant Generation Company, LLC Regarding Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative... ML1114003142011-05-19019 May 2011 Summary of Public Meeting with Luminant Generation Company on Comanche Peak Nuclear Power Plant, Units 1 and 2, to Discuss 2010 End of Cycle Performance Assessment ML1101908002011-01-18018 January 2011 Summary of Meeting with Luminant Generation Company LLC Regarding a Preliminary Finding with Moderate Safety Significance ML11161A1552009-11-30030 November 2009 Enclosure 4 to TXX-11056, Jp Morgan'S Long-Term Capital Market Returns ML0924401642009-09-14014 September 2009 Meeting Summary, Pre-Application Meeting on with Luminant Generation Company LLC to Dicuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0919402762009-07-0909 July 2009 NRC Opening Remarks Discuss the Draft Us Nuclear Regulatory Commission Request for Additional Information for Generic Letter GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressur ML0919604492009-07-0808 July 2009 Alion Meeting Presentations on RAI 9 - Pool Fill Transport, & RAI 6 - Fiber Erosion Testing ML0918303012009-07-0202 July 2009 Summary of Annual Performance Assessment Meeting for Comanche Peak Steam Electric Stations ML0828204232008-10-0707 October 2008 Meeting Handout - Comanche Peak Col Application Public Orientation Meeting ML0720101742007-05-23023 May 2007 Enclosure 2 - 5/23/07 A.M. Meeting Slides - Comanche Peak Steam Electric Station, Units 1 and 2 - Summary of Meeting Held on 5/23/07 with Txu Generation Company LP to Discuss the Plans for Methodology Transition and Power Uprate ML0720101702007-05-23023 May 2007 Enclosure 3 - 5/23/07 P.M. Meeting Slides - Comanche Peak Steam Electric Station, Units 1 and 2 - Summary of Meeting Held on 5/23/07 with Txu Generation Company LP to Discuss the Plans for Methodology Transition and Power Uprate ML0707202502006-12-12012 December 2006 12/12-13/2006 Slides, Txu Power Comanche Peak Site, NRC Onsite Review, Site Geotechnical Investigation Activities. ML0702304012006-10-20020 October 2006 Pre-DBA and Post DBA Pictures ML0530801972005-10-18018 October 2005 Slides 46 Pages - Comanche Peak -Summary of Meeting with Txu Generation Company, LP, to Discuss Application of Accident Analysis Methodologies ML0435101002004-11-10010 November 2004 Meeting Slides - Nrc/Stars Plant Aging Management Center of Business Meeting ML0429905152004-10-19019 October 2004 Presentation by Txu on 10/19/04 - Comanche Peak Steam Electric Station, Unit 1 - Steam Generator Replacement Project ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0404104602004-02-10010 February 2004 2/4/2004 Meeting Summary with Txu for Comanche Peak, Units 1 and 2 to Discuss Plans for Digital Modifications ML0316806212003-07-17017 July 2003 Licensee'S Handouts, Slides and Viewgraphs, 53 Pages, S107210 ML0316806062003-07-17017 July 2003 NRC Handout, Slides and Viewgraphs, 103 Pages, S107211 ML0234504632002-12-10010 December 2002 05000445; Txu Energy, Comanche Peak, Public Exit Meeting - December 10, 2002-Licensee Handouts ML0234504962002-12-10010 December 2002 05000445-TXU Energy-Comanche Peak; Public Exit Meeting Slides (Nrc); December 10, 2002 ML0211400792002-04-22022 April 2002 Attachment 15, E-Mailed on April 22, 2002 (Docket Nos. 50-445 and 50-446). Slides for Zirlo Meeting ML0210801292002-03-0505 March 2002 March 5, 2002 - RIC 2002 Presentation - T3 Lance Terry - Policy Focus Safeguards/Security Issues ML0204200522002-02-0505 February 2002 Regulatory Conference - January 23 2002 2023-08-07
[Table view] |
Text
Comanche Peak Nuclear Power Plant (CPNPP)
First License Renewal (60 years) Application:
Pre-Application Submittal Meeting #2
May 2022 Opening Remarks and Introductions
Speakers Steven Sewell (Luminant)
Todd Evans (Luminant)
Taylor Smith (Luminant)
Amit Kalia (Luminant)
Participants Ramiz Gilada (Luminant)
Burns Cunningham (ENERCON)
Mitch McFarland (ENERCON)
Gary Adkins (ENERCON)
Tyler Bro (Westinghouse)
Jen Meneely (Westinghouse)
2 CPNPP Site
3 Agenda
Update of Information Provided September 2021 Aging Management Programs (AMPs)
Ti m e-Limited Aging Analysis (TLAA)
Use of SLR Operating Experience for First LR General Topics and Future Activities
4 Aging Management Programs - Overview
Total Existing AMPs AMPs New AMPs 43 32 11
Consistent with Includes Includes Includes GALL (no Exception(s) Exception(s) and Enhancement(s) exceptions or Only Enhancement(s) Only enhancements) 5 1 10 16
Plant-Specific AMPs None
5 Aging Management Programs - Exceptions
Water Chemistry, Flow-Accelerated Corrosion, and Closed Treated Water - Exceptions to use later revisions of standards which have been included in GALL-SLR Steam Generators Exception for Unit 2 model D5 tube-to -tube sheet weld inspections, NRC approved TS Amendment which exempted welds from inspection and monitoring due to design (welds are not pressure boundary). Rolled tubes are the pressure boundary.
Exceptions to use later revisions of EPRI standards Fire Water - Exception to not perform trip testing on specific deluge valves in order to protect the charcoal filter units; instead, perform periodic visual inspection Buried Piping and Tanks - Exception to continue Emergency Diesel Generator Fuel Oil Storage Tank inspections at a 20-yr frequency as opposed to the GALL 10-yr frequency. Inspection frequency evaluations have been implemented based on internal operating experience.
Fuel Oil Chemistry Exception to perform bottom-level sampling instead of multi -level sampling in the horizontal EDG fuel oil storage tanks.
The exception above for the Buried Piping and Tanks AMP is also within the Fuel Oil Chemistry AMP.
6 Aging Management Programs - Exceptions (cont )
Reactor Vessel Surveillance - Exception to not submit the U1 and U2 capsule schedule changes with LRA. Appropriate outage has not been determined. Schedule will be submitted in accordance with 10 CFR Part 50 Appendix H at least 6 months prior to PEO, or no later than the last refueling outage prior to the PEO.
Reactor Head Closure Stud Bolting - Exception to allow high strength closure studs to remain in service and spares already acquired to be placed in service.
ASME Section XI, Subsection IWF - IWF AMP requirements for examination and testing of ASME Class CC and MC components and Class MC component supports are included in separate AMPs (IWE, Overhead Heavy Load, and Structures Monitoring).
Internal Coatings - Exceptions are to:
Perform opportunistic inspections of buried cement-lined fire protection piping consistent with SLR-ISG -2021-02-MECHANICAL.
Manage coatings in an indoor air environment (the EDG intercoolers), consistent with SLR-ISG -2021-02-MECHANICAL.
Credit periodic oil sampling by the Lubricating Oil Analysis AMP instead of performing periodic inspections of internal coatings in the Safety Injection pump lubricating oil reservoirs.
Non-destructively tap test coatings surrounding a blister as an alternative to destructive adhesion testing.
7 Aging Management Programs -
NUREG-1801 AMPs Not Applicable to CPNPP
Containment Tendon - CPNPP does not have pre-stressed tendon containment design Boraflex Monitoring - CPNPP does not use boraflex in spent fuel pool Fuse Holders - Fuse holders were screened out because they are included in the EQ Program or due to their location in a larger active device or assembly, consistent with the screening guidance in NUREG-1801,Section XI.E5.
Aboveground Metallic Tanks - the CSTs, RWSTs, and RMWSTs are concrete tanks with stainless steel liners and managed by Structures Monitoring, Water Chemistry, One-Time Inspection and Internal Surfaces AMPs.
Additional tanks:
Fire Water Storage Tanks managed by Fire Water AMP.
Recycle Hold Up Tanks do not have a 54.4(a)(2) function due to their location in watertight compartments.
8 A M P - Reactor Vessel Internals
CPNPP will be implementing MRP-227 Rev 1A SLR-ISG-2021 -01 -PWRVI gap analysis Not required for 1st LR Technical Bases for SLR-ISG-2021 -01 -PWRVI CPNPP requests staff to provide a status update MRP-227-A A/LAI 1 for Inspection and Evaluation Guidelines for RVI BFB degradation addressed in AMP OE section as applicable MRP-227-A A/LAI 8 plant -specific inspection plan required previously for rev 0A will not be included in a separate Appendix C section
9 TLAA - Steam Generators
TLAA Applicable Unit(s) Category Disposition TLAA?
SG Flow-Induced 10 CFR Vibration and Tube Wear 1 and 2 54.21(c)(1)(i)
Evaluations
SG U-Bend Tube Vibration SG tube Ye s and Fatigue Assessment 2 10 CFR vibration wear 54.21(c)(1)(i) projections
SG Tube Wear Rates and Wear Projections for AVB 2 10 CFR 54.21(c)(1)(ii) and TSP Wear
SG Tubes Metal Corrosion U2 SG 10 CFR Allowance 2tube corrosion 54.21(c)(1)(i) Ye s allowance
10 TLAA - Irradiation of Service Level I Coatings
Identified as a TLAA Coatings qualified for 3x108 Rads and required to resist environmental radiation for the life of the plant Total Integrated Dose (TID) through end of PEO (60 years) remains below 3x108 Rads Dispositioned as 10 CFR 54.21(c)(1)(i), remains valid for the PEO Service Level I Coatings will continue to be managed for aging effects, other than irradiation, by the NUREG-1801 Section XI.S8 Protective Coating Monitoring and Maintenance AMP
11 TLAA - Environmentally Assisted Fatigue NUREG/CR-6260 sample set locations (newer vintage Westinghouse plant) have been evaluated:
Reactor vessel shell and lower head Reactor vessel inlet and outlet nozzles RCS charging system nozzle RCS safety injection (SI) nozzle Residual Heat Removal (RHR) system Class 1 piping - Sentinel location is RCS cold leg accumulator nozzle Pressurizer surge line (including hot leg and pressurizer nozzles) -
Sentinel location is RCS Hot Leg Surge Nozzle Environmental fatigue penalty factors taken from NUREG/CR-6909 Rev. 1 Evaluation methods include refined analyses (i.e. finite element modeling),
consideration of 60-year projected cycles, etc.
All NUREG/CR-6260 locations environmental fatigue usage results meet ASME Code fatigue usage requirements (< 1.0)
12 TLAA - Environmentally Assisted Fatigue (cont.)
EAF screening has been completed consistent with GALL Revision 2, X.M1 to identify additional plant-specific component locations that are more limiting than NUREG/CR-6260 locations EAF screening methodology utilized is as described in Section 4 of the Electric Power Research Institute (EPRI) report 3002018262 Utilizes the Section III fatigue analyses in the current licensing basis Class 1, wetted surface, pressure boundary locations Environmental fatigue penalty factors taken from NUREG/CR-6909 Rev. 1 Considers transient sections for fatigue usage results subject to similar loadings Compares fatigue usage results based on level of technical rigor in-addition to the published fatigue usage result Determines a sentinel location for each material type (i.e. low-alloy, carbon steel, stainless steel, nickel alloy) for all transient sections Additional sentinel locations will be addressed prior to entering the PEO 13 TLAA - Leak Before Break Analysis & Alloy 82/182 Welds Reactor Coolant Loop Analysis LBB considers the PWSCC effects due to alloy 82/182 welds at RPV inlet and outlet nozzles Unit 1 - Mitigated via Mechanical Stress Improvement Process (MSIP), evaluation included within the LBB analysis Unit 2 - Partial implementation of MSIP (Loop 2 Hot Leg, Loop 4 Cold Leg Nozzle), evaluation included within the LBB analysis Pressurizer Surge Line Unit 1 and Unit 2 Alloy 82/182 location at the Pressurizer Nozzle to safe end weld has been mitigated by a structural weld overlay (SWOL)
SWOL has been included within the LBB analysis
14 TLAA - Environmental Qualification
Environmental Qualification is evaluated as a TLAA in LRA Chapter 4 and Appendix A, and evaluated as an AMP in Appendices A and B Mechanical Environmental Qualification Program is currently incorporated in the CLB Mechanical Environmental Qualification Program will be removed from the CLB prior to LRA submittal in accordance with 10 CFR 50.59.
15 Use of SLR Operating Experience - Examples
Opportunistic inspections of the internal cement lining applied to buried fire protection ductile iron piping Guidance incorporated from SLR-ISG-2021 -02 -MECHANICAL in the Internal Coatings/Linings AMP Later revisions of EPRI standards endorsed by GALL-SLR Guidance incorporated in Water Chemistry AMP Guidance incorporated in Flow-Accelerated Corrosion AMP PWR Vessel Internals AMP written to SLR-ISG-2021 -01 -PWRVI requirements, which completely supersedes previous revisions of GALL
16 General Topics and Future Activities Luminant would like NRCs perspective on currently developing topics that the NRC is aware of whose timing could impact Luminants application or the NRCs review of the application, e.g.
Additional ISGs Lessons Learned from current SLR application reviews Process changes Portal (e-room) plan Two portals - one for Westinghouse proprietary documents and one for all other documents Luminant propose file structure; NRC PM and staff provide feedback Luminant conduct an overview (virtual meeting) towards later part of sufficiency review Portal to be made available upon completion of sufficiency review
17 General Topics and Future Activities (cont)
Luminant to offer "information sessions" on the following topics:
Operating Experience Portal / e-room Audit support logistics OE and Portal information sessions towards later part of sufficiency review Audit support logistics prior to "on-site" audit Would like NRC perspective on GEIS activities
18 Questions?
Additional Information General Information Comanche Peak Nuclear Power Plant (CPNPP) Units 1 and 2 Four Loop Westinghouse PWRs that are nearly identical Located in north Texas, southwest of Dallas-Fort Worth Unit 1 40 year license expires February 8, 2030 Unit 2 40 year license expires February 2, 2033 LRA written to NUREG-1801 Rev. 2 and LR-ISGs LRA submittal planned for Oct-Dec 2022 Industry Peer Review to be conducted prior to submittal Major Modifications Unit 1 SG and RVCH replacements, alternate access cut into containment (returned to original specification)
Stretch Power Uprate in 2007 Material Stress Improvement Process (MSIP) for Reactor Vessel Nozzles complete in Unit 1 and partially complete in Unit 2 Structural Weld Overlay (SWOL) for Pressurizer Nozzles
21 General Information (cont )
Licensee information Operator - Vistra Operation Company LLC (Vistra OpCo)
Luminant commonly used to denote CPNPP operator Owner - Comanche Peak Power Company LLC (CP Power Co)
Vistra OpCo owned by Vistra Corp. (through an intermediary)
Project structure (Luminant, ENERCON, and WEC)
Luminant Project Team Luminant staff Subject Matter Experts ENERCON Chapters 1, 2, 3 and appendices Environmental Report (Appendix E)
Overall application assembly Westinghouse Chapter 4 TLAA Consultant review of selected documents 22