MONTHYEARML1122119682011-08-26026 August 2011 Notice of Meeting with Luminant Generation Company LLC to Discuss Comanche Peak, Units 1 and 2, Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative 8a Project stage: Meeting ML1125702582011-09-13013 September 2011 Licensee Slides from 9/13/11 Meeting with Luminant Generation Company, LLC Regarding Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative... Project stage: Meeting ML1125904822011-10-14014 October 2011 Summary of Meeting with Luminant to Discuss Comanche Peak, Units 1 and 2, Proposed Request to Adopt Risk-Informed Technical Specification Task Force Initiative 8a, Relocate LCOs for RPS and ESFAS Instrumentation to Licensee Control Project stage: Meeting 2011-08-26
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24019A0342024-01-30030 January 2024 Public Meeting Summary - 01-04-2024 - Comanche Peak LRA - Structures Monitoring Program ML23255A0622023-09-18018 September 2023 Summary of August 7, 2023, Presubmittal Meeting with Vistra Operations Company LLC to Discuss the Proposed LAR to Relocate Refueling Operations TS 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual ML23132A1572023-05-18018 May 2023 Summary of the License Renewal Environmental Audit (EPID Number: L-2022-LNE-004) (Docket Numbers 50-445 and 50-446) ML23103A3002023-04-14014 April 2023 Summary of March 28, 2023, Presubmittal Meeting with Vistra Operations Company LLC to Discuss Proposed LAR to Take Exception to RG 1.81, Rev. 1, Shared Emergency and Shutdown Electric Systems for Multi-Unit Nuclear Power Plants, ML23081A5232023-04-12012 April 2023 Public Scoping Meeting for Environmental Review of Comanche Peak Nuclear Power Plant (Cpnpp), Unit Nos. 1 and 2 License Renewal Application ML23101A0432023-04-12012 April 2023 April 6, 2023, Summary of Meeting with Vistra Operations Company LLC to Discuss Proposed Alternative Regarding Inservice Testing of Various Thermal Relief Valves for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML22151A1842022-06-22022 June 2022 License Renewal Application May 26, 2022 Pre-submittal Public Meeting Summary ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22020A1782022-01-31031 January 2022 Summary of Conference Call Regarding the Fall 2021 Steam Generator Tube Inspections ML21259A1492021-10-26026 October 2021 CPNPP, Unit Nos. 1 and 2 - Meeting Summary for Environmental Pre Submittal Meeting for Initial License Renewal Application on September 21, 2021 ML21259A1402021-10-0505 October 2021 Meeting Summary for Safety Pre Submittal Meeting for Initial License Renewal Application on September 21, 2021 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21130A6832021-05-20020 May 2021 Summary of April 7, 2021, Presubmittal Meeting with Vistra Operations Company LLC Regarding the Proposed Exemption Request to Defer the Annual Force-On-Force Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML21124A0072021-05-10010 May 2021 Meeting Summary for Environmental Pre-Submittal Meeting for Initial License Renewal Application ML21110A0602021-05-0707 May 2021 Summary of April 6, 2021, Meeting with Vistra Operations Company LLC to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML21099A2752021-04-15015 April 2021 Summary of Teleconference with Vistra Operations Company LLC to Discuss Proposed LAR to Adopt TSTF-505, Rev. 2, to Provide Risk-Informed Extended Completion Times for Comanche Peak, Units 1 and 2 ML20351A2592021-01-0505 January 2021 Summary of November 12, 2020, Teleconference with Vistra Operations Company LLC Proposed License Amendment Request for One-Time TS Revision to Replace Station Service Water Pump ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20115E3932020-04-30030 April 2020 Summary of April 6 and 7, 2020, COVID-19 Related Presubmittal Teleconferences with Vistra Operations Company LLC to Discuss Licensing Actions Supporting the Comanche Peak Unit No. 2 Spring 2020 Refueling Outage ML20044D3052020-02-26026 February 2020 Summary of Teleconference with Vistra Operations Company, LLC to Discuss a Proposed License Amendment Request for Changes to Certain Emergency Action Levels for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (EPID L-2020-LRM-000 ML19352E3172020-01-0808 January 2020 Summary of Teleconference with Vistra Operations Company LLC to Discuss a Proposed License Amendment Request to Change TS 3.8.1, AC Sources - Operating for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML19311C2122019-11-13013 November 2019 Summary of November 5, 2019, Teleconference with Vistra Operations Company LLC to Discuss a Proposed License Amendment Request to Change TS 3.8.1, Ac Sources - Operating for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML18275A3142018-10-16016 October 2018 Summary of September 17, 2018, Public Teleconference with Vistra Operations Company, LLC, on Proposed Changes to the Emergency Plan for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML17137A1742017-05-22022 May 2017 Summary of Conference Call Regarding the Spring 2017 Steam Generator Tube Inspections ML16194A4962016-07-12012 July 2016 Summary of Annual Performance Assessment Meeting and Public Open House Regarding Comanche Peak Nuclear Power Plant 2015 Performance ML15191A2282015-07-27027 July 2015 7/9/2015 Summary of Pre-submittal Meeting with Luminant Generation Company LLC to Discuss Submittal for License Amendment Request to Revise Technical Specification 3.8.1 for Comanche Peak Nuclear Power Plant, Units 1 and 2 (TACs MF6311 and ML15191A2512015-07-0909 July 2015 July 9, 2015 Public Meeting: Comanch Peak Pre- Application Meeting, Emergency Diesel Generator Voltage and Frequency Technical Specification Changes ML14188C4402014-07-22022 July 2014 6/3/2014 Summary of Meeting with Luminant Generation Company LLC to Discuss Proposed Modifications to Technical Specifications to Install Backup Transformer XST1A for Comanche Peak, Units 1 and 2 ML13067A0292013-03-15015 March 2013 2/28/13 - Summary of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 ML12341A0812012-12-18018 December 2012 Summary of 11/15/12 Meeting with Luminant Generation Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12332A3652012-12-18018 December 2012 Summary of Meeting with Luminant Generation Company LLC, to Discuss License Amendment Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications (TAC Nos. ME8896-ME8897) ML12283A3502012-10-25025 October 2012 Summary of 9/13/12 Meeting with Luminant Generation Company LLC to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12229A5042012-09-19019 September 2012 8/6/2012 Summary of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML12188A6972012-07-18018 July 2012 6/26/12 Summary of Meeting with Luminant Generation Company LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8 ML12072A3432012-03-12012 March 2012 3/6/2012 Summary of Meeting with Luminant Generation Company, LLC Regarding Planned Modifications to Resolve Fire Protection Circuit Interactions ML1125904822011-10-14014 October 2011 Summary of Meeting with Luminant to Discuss Comanche Peak, Units 1 and 2, Proposed Request to Adopt Risk-Informed Technical Specification Task Force Initiative 8a, Relocate LCOs for RPS and ESFAS Instrumentation to Licensee Control ML1114001482011-05-23023 May 2011 Summary of Conference Call on 4/14/2011 with Nrr/Dci/Csgb Regarding the Spring 2011 Steam Generator Tube Inspections ML1114003142011-05-19019 May 2011 Summary of Public Meeting with Luminant Generation Company on Comanche Peak Nuclear Power Plant, Units 1 and 2, to Discuss 2010 End of Cycle Performance Assessment ML1108004622011-03-28028 March 2011 3/17/11 Summary of Closed Meeting with Luminant Generation Company Via Conference Call to Discuss Generic Request for Additional Information Pertaining to Its Cyber Security Submittal ML1101908002011-01-18018 January 2011 Summary of Meeting with Luminant Generation Company LLC Regarding a Preliminary Finding with Moderate Safety Significance ML1034205662010-12-22022 December 2010 Memo Summary of the November 3, 2010, Public Meeting with the United States - Advanced Pressurized Water Reactor Design Centered Working Group to Discuss Inspections, Test, Analyses, and Acceptance Criteria, Conceptual Design Information. ML1016501752010-06-21021 June 2010 6/10/10 Summary of Closed Meeting with Luminant Generation Company, LLC to Discuss Comanche Peak Nuclear Power Plant, Units 1 and 2 Implementation Plan/Information Pertaining to Defensive Strategy for Cyber Security Submittal ML1013906402010-05-19019 May 2010 Summary of Public Meeting with Luminant Generation Company on Comanche Peak Nuclear Power Plant, Units 1 and 2, 2009 Performance ML0924401642009-09-14014 September 2009 Meeting Summary, Pre-Application Meeting on with Luminant Generation Company LLC to Dicuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0919705782009-07-31031 July 2009 Summary of Category 1 Meeting with Luminant Generation Company LLC, Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML0918303012009-07-0202 July 2009 Summary of Annual Performance Assessment Meeting for Comanche Peak Steam Electric Stations ML0729204682007-10-29029 October 2007 09/25/2007, Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Strategic Teaming and Resource Sharing Representatives to Discuss License Renewal Activities ML0720005052007-07-31031 July 2007 Summary of Meeting with Txu Generation Company LP to Discussed Regarding the Plans for Methodology Transition and Power Uprate ML0717200702007-06-20020 June 2007 Summary of Meeting with Txu Power Regarding Comanche Peak Steam Electric Stations End-of-Cycle Assessment for 2006 ML0612204362006-05-18018 May 2006 Attachment 3 to Comanche Peak Conference Call 2024-01-30
[Table view] |
Text
REG(.!(., UNITED STATES
-"0",... NUCLEAR REGULATORY COMMISSION
(') WASHINGTON, D.C. 20555-0001 o
~
~
~ ~
~ ~ October 14, 2011
"'I) ~o
- 1<1' LICENSEE: Luminant Generation Company LLC FACILITY: Comanche Peak Nuclear Power Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF SEPTEMBER 13, 2011, PRE-LICENSING PUBLIC MEETING WITH LUMINANT GENERATION COMPANY LLC TO DISCUSS THE PROPOSED RISK-INFORMED TECHNICAL SPECIFICATION TASK FORCE (TSTF) INITIATIVE 8A FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (TAC NOS. ME6810 AND ME6811)
On September 13,2011, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Luminant Generation Company LLC (the licensee) at NRC Headquarters, Rockville, Maryland. The meeting notice and agenda, dated August 26, 2011, are located in the Agencywide Documents Access and Management System (ADAMS)
Accession No. ML112211968. The purpose of the meeting was to discuss the proposed license amendment request (LAR) related to Risk-Informed Technical Specification Task Force (TSTF)
Initiative 8a, to relocate limiting conditions for operation (LCOs) for the reactor trip system (RTS)
(associated with Technical Specification (TS) Table 3.3.1) and engineered safety features actuation system (ESFAS) instrumentation (associated with TS Table 3.3.2) from the TSs to a licensee-controlled document based on its applicability to Criterion 3 and 4 of paragraph 50.36(c)(2)(ii) of Title 10 of the Code of Federal Regulations (10 CFR). Comanche Peak Nuclear Power Plant (CPNPP), Units 1 and 2, is the lead plant for this initiative.
The licensee's presentation slides and additional materials provided for the meeting are located at ADAMS Accession No. ML112570258. A list of meeting attendees is enclosed.
Meeting Summary The licensee's slide presentation entitled, "Comanche Peak Lead Plant LAR to Relocate Tech Spec 3.3.1 and 3.3.2 LCOs that do not Satisfy Any of the Criteria of 10CFR50.36(c)(2)(ii)," were discussed in detail by the licensee during the meeting and consisted of the following topics:
- Purpose of the Pressurized Water Reactor Owners Group (PWROG) Program
- Summary of the March 2, 2011 NRC/PWROG Meeting
-2 A number of clarifying questions were asked by the NRC staff. The following is a summary of the conclusions based on the responses provided by the licensee:
- 1. The licensee's evaluation will not be limited to the main LCOs 3.3.1 and 3.3.2 for the RPS and ESFAS. The licensee plans to perform a detailed evaluation for each individual function listed in TS Tables 3.3.1-1 and 3.3.2-1 to determine the functions which are the potential candidates for relocation from the TSs to a licensee-controlled document. The licensee intends to relocate these functions to the Technical Requirements Manual (TRM).
- 2. The licensee stated that a basic presumption is that the functions listed in the current TSs already meet the requirements of 10 CFR 50.36(c)(2)(ii). The licensee acknowledged that its detailed evaluation must provide the NRC staff with reasonable assurance for the staff to conclude that the functions proposed for relocation to the TRM continue to meet the criterion specified by 10 CFR 50.36(c)(2)(ii).
- 3. The licensee stated that since Criterion 3 of 10 CFR 50.36(c)(2)(ii) applies to systems, structures, or components that are part of the primary success path, the functions in the TSs for defense in depth can be relocated to a licensee controlled document. Initially, these functions will be relocated to the TRM without any changes in installed equipment, surveillance frequencies, or any other factor. Any future changes to those functions listed in the TRM will be made in accordance with 10 CFR 50.59. The licensee further indicated that any future change to eliminate one or more of the relocated functions is not likely to satisfy the 10 CFR 50.59 test and would likely require prior NRC approval under 10 CFR 50.90.
- 4. The NRC staff expressed concern about the functions included in the TSs in support of analyzed transients and anticipated operational occurrences. The licensee stated that all functions in TS Tables 3.3.1-1 and 3.3.2-1 will be evaluated against Chapters 6 and 15 of the Final Safety Analysis Report (FSAR) and will be relocated only after confirmation that no credit has been taken for these functions in the safety analysis and they do not satisfy the requirements of Criterion 2.
- 5. The licensee stated that defense in depth and diversity will not be affected since some of the functions associated with TSs 3.3.1 and 3.3.2 are being relocated, not eliminated. The plant design will stay the same. The only change will be that the licensee will be able to make changes to the relocated functions in accordance with 10 CFR 50.59.
-3
- 6. The licensee stated that it intends to provide detailed justifications for each function being relocated, but no information for the instruments being retained in the TSs as a result of the detailed evaluation. The NRC staff suggested that, as a minimum, a table of all of the functions evaluated should be submitted summarizing the results of the evaluation and stating the reasons for retaining or relocating each individual function including which functions were associated with the prevention or mitigation of each event and which do not. The licensee's submittal should state why the items proposed for relocation do not meet any of the 10 CFR 50.36(c)(2)(ii) criteria. The licensee acknowledged the need to provide this information.
- 7. The licensee proposed two probabilistic risk analysis (PRA) approaches to address Criterion 4 of 10 CFR 50.36(c)(2)(ii). The NRC staff noted that either of the PRA approaches would be acceptable.
- 8. The licensee stated that the functions listed on page 32 of the presentation are only examples. The licensee has not completed its evaluation all functions. The complete list will be developed later and provided in the LAR.
- 9. The licensee provided an update to the project schedule dates as follows:
- Review of RTS and ESFAS functions and identification of the functions that do not satisfy Criterion 3 and 4 of 10 CFR 50.36(c)(2)(ii) to be completed by December 31, 2011.
- The CPNPP LAR will be prepared between January 2 and March 31, 2012.
- NRC should expect to begin its review by April 1, 2012, and will be requested to approve the LAR by March 31,2013.
No Public Meeting Feedback Forms were received for this meeting.
-4 Please direct any inquiries to me at (301) 415-3016, or Balwant.Singal@nrc.gov.
Sincerely, b~~b~,~~
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATIENDEES SEPTEMBER 13. 2011. PRE-LICENSING MEETING RISK-INFORMED TSTF INITIATIVE 8A LUMINANT GENERATION COMPANY LLC COMANCHE PEAK NUCLEAR POWER PLANT. UNITS 1 AND 2 DOCKET NOS. 50-445 AND 50-446 NAME TITLE ORGANIZATION Balwant K. Singal Senior Project Manager NRC David Rahn Senior Electronics Engineer NRC Carl Schulten Technical Specifications Engineer NRC Andrew Howe Senior Risk Analyst NRC Joshua Miller Reactor Systems Engineer NRC Rob Slough Licensing Engineer Luminant Tim Hope Manager. Nuclear Licensing Luminant Westinghouse (represented Jerry Andre Westinghouse - PRA Luminant)
Westinghouse (represented Jim Andrachek Westinghouse Licensing Luminant)
Steve Widesman* Principal Engineer WCNOC
- Participated Via Phone Abbreviations:
NRC - U.S. Nuclear Regulatory Commission Luminant - Luminant Generation Company LLC WCNOC - Wolf Creek Nuclear Operating Company Enclosure
ML112590482 *Concurrence via e-mail NRR/LPL4/PM NRR/LPL4/LA NRR/DRAlAPLAlBC NAME BSingal JBurkhardt DHarrison*
DATE 10/5/11 10/5/11 9/16/11 OFFICE NRRIDE/EICB/BC NRR/DIRSIITSB/BC NRR/LPL4/BC NRR/LPL4/PM NAME GWilson DRahn for* RElliot* MMarkley BSingal DATE 9/15/11 9/16/11 10/14/11 10/14/11
====~==============~=============d