MONTHYEARML0603903012006-02-0909 February 2006 GSI Letter RAI Response to GL 2004-02 (TAC Nos. MC4676 and 4677) Project stage: RAI ML0817601002008-06-27027 June 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors, Approval of Extension Request Project stage: Other ML0835004652008-11-26026 November 2008 Comanche Peak - Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover Letter Project stage: Request ML0916604102009-05-11011 May 2009 E-mail Draft Request for Additional Information, Licensee'S Supplemental Responses Dated February 29 and November 26, 2008, to GL 2004-02 Project stage: Draft RAI ML0916604222009-05-11011 May 2009 Request for Additional Information Supplemental Responses to Generic Letter (GL) 2004-02 Dated 02/29/2008 and 11/26/2008 Project stage: RAI ML0918207102009-07-0202 July 2009 Revised Notice of Meeting with Representatives of Luminant Generation Co., LLC, Comanche Peak to Discuss Draft Request for Information for Generic Letter 2004-02 Response Project stage: Draft RAI ML0919604492009-07-0808 July 2009 Alion Meeting Presentations on RAI 9 - Pool Fill Transport, & RAI 6 - Fiber Erosion Testing Project stage: Request ML0919400842009-07-0909 July 2009 Luminant RAI 22 and 23 SBLOCA, Vortex, Air Ingestion, Void Fraction and Flashing Issues Project stage: Request ML0919402762009-07-0909 July 2009 NRC Opening Remarks Discuss the Draft Us Nuclear Regulatory Commission Request for Additional Information for Generic Letter GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressur Project stage: Draft RAI ML0919402772009-07-0909 July 2009 Luminant Holistic Overview: Presentation Will Cover Information Related to RAIs 1 - 5, 7, 12 - 14,16 - 19, 21, 25 - 36 and Overall Response to GL 2004-02 Project stage: Request ML0919400832009-07-0909 July 2009 Pci RAI 8, Test Protocol, Erosion Issue, RAI 15, Test Protocol, Latent Fiber Issue, Areva RAI 20, Test Flume, Fiberglass Larges Question Project stage: Request ML0919400852009-07-0909 July 2009 Luminant RAI 24 and 37, Secondary Line Breaks, Debris Load and Testing Project stage: Request ML0916707382009-07-15015 July 2009 Request for Additional Information Supplemental Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0920203432009-07-22022 July 2009 Revised Conference Call with Luminant Generation Company, LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 Project stage: Draft RAI ML0919705782009-07-31031 July 2009 Summary of Category 1 Meeting with Luminant Generation Company LLC, Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Meeting ML0926107912009-09-10010 September 2009 Comanche Peak Supplement Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Request CP-200901396, Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basic Accidents at Pressurized-water Reactors.2009-10-12012 October 2009 Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basic Accidents at Pressurized-water Reactors. Project stage: Supplement ML0930800032009-10-13013 October 2009 Comanche Peak - Supplement to Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML1009505642010-04-19019 April 2010 Generic Letter 2004-02 Supplemental Response Project stage: Other ML13045A4102013-02-15015 February 2013 2/28/13 Notice of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 Project stage: Meeting ML13059A2022013-02-28028 February 2013 Email Licensee Slides for 2/28/13 Meeting Via Conference Call Project stage: Meeting ML13059A1812013-02-28028 February 2013 Licensee Slides for 2/28/13 Meeting Via Conference Call with Luminant Generation Company, LLC, Project stage: Meeting ML13067A0292013-03-15015 March 2013 2/28/13 - Summary of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 Project stage: Meeting CP-201300670, Closure Options for Generic Safety Issue 191 (GSI-191), Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance2013-05-16016 May 2013 Closure Options for Generic Safety Issue 191 (GSI-191), Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance Project stage: Other ML13267A1972013-09-30030 September 2013 Request for Additional Information, Closure of Option 2a to Address In-Vessel Mitigative Measures for Potential In-Vessel Blockage; Related to Generic Safety Issue 191 Project stage: RAI CP-201301214, Response to Request for Additional Information Regarding Closure Options for Generic Safety Issue 1912013-10-31031 October 2013 Response to Request for Additional Information Regarding Closure Options for Generic Safety Issue 191 Project stage: Response to RAI 2009-07-31
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML23332A2772023-11-0707 November 2023 CPNPP Dseis Slide for 12/7/23 Public Meetings_112223 ML23215A1922023-08-0707 August 2023 – August 7, 2023 Presubmittal Meeting Presentation - Relocation of Technical Specification 3.9.3 Nuclear Instrumentation to a Licensee Controlled Document (EPID: L?2023?LRM-0052) ML23215A1652023-08-0404 August 2023 – August 8, 2023 Presubmittal Meeting Presentation - Technical Specification 3.8.1 AC Sources - Operating Required Action B.4, 14-hour Completion Time (EPID: L?2023?LRM-0053) ML23094A2722023-04-0606 April 2023 – April 6, 2023 Presubmittal Meeting Presentation - Extension Request for Thermal Relief Valves (EPID: L?2023?LRM-0023) ML23081A0252023-03-22022 March 2023 – March 28, 2023 Pre-submittal Meeting Presentation - LAR for Exception to RG 1.81 (EPID L?2023?LRM-0015) ML23045A1552023-02-14014 February 2023 Public Meeting February 23, 2023 - Presentation Slides ML23011A0872023-01-10010 January 2023 License Renewal Scoping Meeting, Comanche Peak Nuclear Power Plant, Units 1 and 2 - Meeting Slides ML22140A1082022-05-31031 May 2022 (CPNPP) First License Renewal (60 Years) Application Pre-Application Submittal Meeting 2, Meeting Slides ML21259A0312021-09-30030 September 2021 Initial License Renewal Pre-Application Submittal Meeting Sept 2021 - Safety ML21259A0292021-09-16016 September 2021 Initial License Renewal - NRC Presubmittal Meeting Slides - Safety ML21259A0332021-09-16016 September 2021 Initial License Renewal Application - NRC Presubmittal Meeting Slides - Environmental ML21259A0352021-09-16016 September 2021 License Renewal Pre-Application Submittal Meeting Sept 2021 Environmental Report ML21095A3052021-04-0707 April 2021 4/7/2021 Presubmittal Meeting Presentation - Comanche Peak, Units 1 and 2 - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 and Subsection C.3(l)(1) (L-2021-LRM-0039) ML21097A0522021-04-0707 April 2021 NRC Talking Points - 4/7/2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for Comanche Peak ML21068A0292021-03-0909 March 2021 Presentation - 3/24/2021 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML21007A2562021-01-12012 January 2021 Luminant-CPNPP License Renewal SAMA January 12 2021 Public Mtg ML20314A3422020-11-12012 November 2020 NRC Teleconference with Comanche Peak Regarding a Proposed Exigent License Amendment Request (LAR) 20-007 TS 3.7.8 Station Service Water System TS 3.8.1 AC Sources - Operating ML20036D4102020-02-12012 February 2020 Pre-Submittal Meeting for: Comanche Peak Nuclear Power Plant Docket Nos. 50-445 and 50-446 February 12, 2020 - License Amendment Request for Changes to Certain Emergency Action Levels ML19337A6622019-12-0303 December 2019 Revised Comanche Peak Pre-Submittal Meeting with NRC for Proposed License Amendment Request (LAR) 15-001 TS 3.8.1, AC Sources -- Operating ML19324D3482019-11-0505 November 2019 December 3, 2019 Pre-Submittal Meeting Presentation - Proposed License Amendment Request (LAR) 15-001 TS 3.8.1, AC Sources - Operating (L-2019-LRM-0072) ML14077A2872014-03-18018 March 2014 Transcript of the 612th ACRS Meeting, March 6, 2014 (Open) Pages 1-317 ML13059A1812013-02-28028 February 2013 Licensee Slides for 2/28/13 Meeting Via Conference Call with Luminant Generation Company, LLC, ML12229A5042012-09-19019 September 2012 8/6/2012 Summary of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML12236A3322012-08-23023 August 2012 Non-proprietary - Presentation for September 13, 2012, Proposed License Amendment Request for Spend Fuel Pool Criticality Analysis ML12188A6972012-07-18018 July 2012 6/26/12 Summary of Meeting with Luminant Generation Company LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8 ML1125702582011-09-13013 September 2011 Licensee Slides from 9/13/11 Meeting with Luminant Generation Company, LLC Regarding Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative... ML1114003142011-05-19019 May 2011 Summary of Public Meeting with Luminant Generation Company on Comanche Peak Nuclear Power Plant, Units 1 and 2, to Discuss 2010 End of Cycle Performance Assessment ML1101908002011-01-18018 January 2011 Summary of Meeting with Luminant Generation Company LLC Regarding a Preliminary Finding with Moderate Safety Significance ML11161A1552009-11-30030 November 2009 Enclosure 4 to TXX-11056, Jp Morgan'S Long-Term Capital Market Returns ML0924401642009-09-14014 September 2009 Meeting Summary, Pre-Application Meeting on with Luminant Generation Company LLC to Dicuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0919402762009-07-0909 July 2009 NRC Opening Remarks Discuss the Draft Us Nuclear Regulatory Commission Request for Additional Information for Generic Letter GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressur ML0919604492009-07-0808 July 2009 Alion Meeting Presentations on RAI 9 - Pool Fill Transport, & RAI 6 - Fiber Erosion Testing ML0918303012009-07-0202 July 2009 Summary of Annual Performance Assessment Meeting for Comanche Peak Steam Electric Stations ML0828204232008-10-0707 October 2008 Meeting Handout - Comanche Peak Col Application Public Orientation Meeting ML0720101742007-05-23023 May 2007 Enclosure 2 - 5/23/07 A.M. Meeting Slides - Comanche Peak Steam Electric Station, Units 1 and 2 - Summary of Meeting Held on 5/23/07 with Txu Generation Company LP to Discuss the Plans for Methodology Transition and Power Uprate ML0720101702007-05-23023 May 2007 Enclosure 3 - 5/23/07 P.M. Meeting Slides - Comanche Peak Steam Electric Station, Units 1 and 2 - Summary of Meeting Held on 5/23/07 with Txu Generation Company LP to Discuss the Plans for Methodology Transition and Power Uprate ML0707202502006-12-12012 December 2006 12/12-13/2006 Slides, Txu Power Comanche Peak Site, NRC Onsite Review, Site Geotechnical Investigation Activities. ML0702304012006-10-20020 October 2006 Pre-DBA and Post DBA Pictures ML0530801972005-10-18018 October 2005 Slides 46 Pages - Comanche Peak -Summary of Meeting with Txu Generation Company, LP, to Discuss Application of Accident Analysis Methodologies ML0435101002004-11-10010 November 2004 Meeting Slides - Nrc/Stars Plant Aging Management Center of Business Meeting ML0429905152004-10-19019 October 2004 Presentation by Txu on 10/19/04 - Comanche Peak Steam Electric Station, Unit 1 - Steam Generator Replacement Project ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0404104602004-02-10010 February 2004 2/4/2004 Meeting Summary with Txu for Comanche Peak, Units 1 and 2 to Discuss Plans for Digital Modifications ML0316806212003-07-17017 July 2003 Licensee'S Handouts, Slides and Viewgraphs, 53 Pages, S107210 ML0316806062003-07-17017 July 2003 NRC Handout, Slides and Viewgraphs, 103 Pages, S107211 ML0234504632002-12-10010 December 2002 05000445; Txu Energy, Comanche Peak, Public Exit Meeting - December 10, 2002-Licensee Handouts ML0234504962002-12-10010 December 2002 05000445-TXU Energy-Comanche Peak; Public Exit Meeting Slides (Nrc); December 10, 2002 ML0211400792002-04-22022 April 2002 Attachment 15, E-Mailed on April 22, 2002 (Docket Nos. 50-445 and 50-446). Slides for Zirlo Meeting ML0210801292002-03-0505 March 2002 March 5, 2002 - RIC 2002 Presentation - T3 Lance Terry - Policy Focus Safeguards/Security Issues ML0204200522002-02-0505 February 2002 Regulatory Conference - January 23 2002 2023-08-07
[Table view] |
Text
2p, U.S.NRC UNITED STATES NUCLEAR REGULATORY COMMISSION ProtectingPeople and the Environment Introduction for Public Meeting with Comanche Peak on Generic Safety Issue 191 Michael Scott Office of Nuclear Reactor Regulation July 9, 2009 1
SU.S.NRC UNITED STATES NUCLEAR REGULATORY COMMISSION ProtectingPeople and the Environment Purpose of Meeting P r o e o e t n Discuss in detail licensee's planned path forward on each RAI for which, based on agenda-setting phone call, NRC staff is not yet confident licensee is on success path
- Attempt to reach understanding such that:
- NRC staff is confident licensee's overall approach will succeed in showing adequate ECCS strainer performance
- Licensee can have confidence that its path forward, if carried out consistent with what it has told the staff, will not result in another round of RAIs 2
S U.S.N C UNITED STATES NUCLEAR REGULATORY COMMISSION ProtectingPeople and the Environment Precepts for the discussion Emphasis for the meeting is licensee's methods in each subject area; results may be discussed as appropriate to support conclusions on method adequacy
- Licensee bears the burden of showing that its strainer will function adequately in event of a DBA
- NRC position is that. an adequate head loss test is needed to show satisfactory strainer performance unless licensee justifies that their strainer has significant nonfiltering area
- Perfection is not the standard, but staff has not been able to reach conclusions of adequacy in the face of numerous evident nonconservatisms 3
protectingPeople and the Environment(C ontinued)
No particular degree of conservatism required in any subject area; staff will not claim treatment of an area is "not sufficiently conservative" Staff will not carry concerns such as "may be nonconservative" without specific basis 4
ProteCtingPeople and the Environment Approach t Meeting For each RAI under discussion as determined during agenda-setting telecon:
- Licensee discusses path forward
- Staff asks questions/states any concerns
- Open discussion between the two parties
- Each side concludes with its position
- PM notes positions and agreements (as applicable)
- After all RAIs discussed,both parties caucus privately on any RAIs for which agreement was not reached
- Either party may identify a change in its position(s)
- Staff will provide overall conclusion regarding its confidence in
.licensee's approach to issue resolution
- Public comment opportunity
- Results and agreements/disagreements documented in meeting summary 5