PNRC Special Inspection of Comanche Peak Steam Generator Tube Leak NRC Public Meeting December 10, 2002
PIntroductions POpening Remarks -Dwight Chamberlain, NRC POpening Remarks -Lance Terry, TXU POverview of Special Inspection -Charles Marschall PPresentation of Findings -Wayne Sifre Agenda
PClosing remarks -Lance Terry, TXU PClosing remarks -Dwight Chamberlain, NRC PNRC Discussion with Members of the Public PAdjourn Agenda, contd
PIntroductions PMeeting process
Category 1 meeting PMeeting purpose
Present the results of the NRC Special Inspection to TXU
Communicate with the public Opening Remarks - NRC Dwight Chamberlain, Director Division of Reactor Safety NRC, Region IV
POverall
Comanche Peak took appropriate and conservative action in response to the tube leak
The tube leak did not result in any effect on health and safety of the public Opening Remarks - NRC (contd)
Opening Remarks - TXU Energy Lance Terry, Senior Vice President and Principal Nuclear Officer
PWhat is a Special Inspection?
PWhy did the NRC do a Special Inspection?
Overview of Special Inspection Process Charles Marschall, Chief, Engineering and Maintenance Branch, Division of Reactor Safety, NRC, Region IV
PSpecial Inspection Team Charter PThree findings - examples of human error
Secondary analyst error in 1RF09
- Non-cited Violation
- Green (would not result in a significant increase in risk)
Tertiary analyst error in 1RF09
- Non-cited Violation
- Green (would not result in a significant increase in risk)
Presentation of Findings Wayne Sifre, Team Leader, NRC Special Inspection Team
Secondary analyst error in 1RF08
- Error in 1RF08 permitted tube to remain in service until leak developed
- Apparent Violation
- May have an effect on plant risk
- Significance to be determined by a detailed risk analysis Inspection Findings (contd)
Closing Remarks -Lance Terry, TXU
PSummary and perspective PFinishing the inspection and assessment process Closing remarks - Dwight Chamberlain, NRC
NRC Discussion with Members of the Public
Adjourn