ML023450496

From kanterella
Jump to navigation Jump to search
05000445-TXU Energy-Comanche Peak; Public Exit Meeting Slides (Nrc); December 10, 2002
ML023450496
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 12/10/2002
From: Chamberlain D
NRC Region 4
To: Terry C
TXU Energy
References
Download: ML023450496 (13)


Text

PNRC Special Inspection of Comanche Peak Steam Generator Tube Leak NRC Public Meeting December 10, 2002

PIntroductions POpening Remarks -Dwight Chamberlain, NRC POpening Remarks -Lance Terry, TXU POverview of Special Inspection -Charles Marschall PPresentation of Findings -Wayne Sifre Agenda

PClosing remarks -Lance Terry, TXU PClosing remarks -Dwight Chamberlain, NRC PNRC Discussion with Members of the Public PAdjourn Agenda, contd

PIntroductions PMeeting process

 Category 1 meeting PMeeting purpose

 Present the results of the NRC Special Inspection to TXU

 Communicate with the public Opening Remarks - NRC Dwight Chamberlain, Director Division of Reactor Safety NRC, Region IV

POverall

 Comanche Peak took appropriate and conservative action in response to the tube leak

 The tube leak did not result in any effect on health and safety of the public Opening Remarks - NRC (contd)

Opening Remarks - TXU Energy Lance Terry, Senior Vice President and Principal Nuclear Officer

PWhat is a Special Inspection?

PWhy did the NRC do a Special Inspection?

Overview of Special Inspection Process Charles Marschall, Chief, Engineering and Maintenance Branch, Division of Reactor Safety, NRC, Region IV

PSpecial Inspection Team Charter PThree findings - examples of human error

 Secondary analyst error in 1RF09

- Non-cited Violation

- Green (would not result in a significant increase in risk)

 Tertiary analyst error in 1RF09

- Non-cited Violation

- Green (would not result in a significant increase in risk)

Presentation of Findings Wayne Sifre, Team Leader, NRC Special Inspection Team

 Secondary analyst error in 1RF08

- Error in 1RF08 permitted tube to remain in service until leak developed

- Apparent Violation

- May have an effect on plant risk

- Significance to be determined by a detailed risk analysis Inspection Findings (contd)

Closing Remarks -Lance Terry, TXU

PSummary and perspective PFinishing the inspection and assessment process Closing remarks - Dwight Chamberlain, NRC

NRC Discussion with Members of the Public

Adjourn