| issue date = 12/30/1980
| issue date = 12/30/1980
| title = Interim Deficiency Rept Re Deficiencies in Procurement Fabrication & Insp of Engineered Plates for safety-related Load Concrete Embedment & Support.Addl Ultrasonic Exams Being performed.Re-evaluation/correction Completion 810301
| title = Interim Deficiency Rept Re Deficiencies in Procurement Fabrication & Insp of Engineered Plates for safety-related Load Concrete Embedment & Support.Addl Ultrasonic Exams Being performed.Re-evaluation/correction Completion 810301
| author name = CHIANGI N J
| author name = Chiangi N
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = OREILLY J P
| addressee name = Oreilly J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000400, 05000401, 05000402, 05000403
| docket = 05000400, 05000401, 05000402, 05000403
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULAT (INFORMATION DISTRIBUTIO YSTEM (RIDS)ACCESSION NBR:8101070437 DOC~DATE!80/12/30 NOTARIZED:
{{#Wiki_filter:REGULAT   ( INFORMATION   DISTRIBUTIO       YSTEM (RIDS)
NO DOCKET FACIL:50"400 Shearon Harris Nuclear Power Plant~Unit 1~Carolina 05000400 50-401 Shearon Harris Nuclear Power Planti Unit 2~Carolina.05000401 50-402 Shearon Harris Nuclear Power Plantr Unit 3i Carolina 05000402 50Ž403 Shearon Harris Nuclear Power Plant~Unit 4~Carolina 05000403 AUTH INANE AUTHOR AFFILIATION CHIANGI~N.J
ACCESSION NBR:8101070437             DOC ~ DATE! 80/12/30 NOTARIZED: NO                 DOCKET FACIL:50"400 Shearon Harris Nuclear             Power Plant~ Unit 1~ Carolina           05000400 50-401 Shearon Harris Nuclear           Power Planti Unit 2~ Carolina         .05000401 50-402 Shearon Harris Nuclear           Power Plantr Unit 3i Carolina           05000402 50'403 Shearon Harris Nuclear           Power Plant~ Unit 4~ Carolina           05000403 AUTH INANE             AUTHOR AFFILIATION CHIANGI~N.J ~           Carolina Power     L Light Co ~
~Carolina Power L Light Co~RECIP.NAME RECIPIENT AFFILIATION O'REILLY g J~P~Region 2i Atlanta, Office of the Director S UBJECT: Interim deficiency rept re deficiencies in procurement fabrication 8 insp of engineered plates for safety related load concrete embedment 8, support.Addi ultrasonic exams being performed.Re-evaluation/correction completion 810301, DISTRIBUTION CODE: B019S COPIES RECEIVED:LTR ENCL SIZE: TITLE: Construction Deficiency Repor t (10CFR50.55E)
RECIP.NAME             RECIPIENT AFFILIATION O'REILLYg J ~ P ~         Region 2i Atlanta, Office of       the Director S UBJECT:   Interim deficiency rept re deficiencies             in procurement fabrication 8 insp of engineered plates             for safety related load concrete embedment 8, support.Addi           ultrasonic   exams being performed.Re-evaluation/correction             completion 810301, DISTRIBUTION CODE: B019S           COPIES RECEIVED:LTR         ENCL       SIZE:
NOTES: REC IP IENT ID CODE/NAME ACTION: A/D LICENSNG 04 RUSHBROOKIM
TITLE: Construction Deficiency Repor t (10CFR50.55E)
~Ob INTERNAL: AD/RC I/IE 17 ASLBP/JeHARD DIR g DI V OF LIC EQUIP QUAL BR 1 1 ISE 09 MPA 20 OELD 21 QA BR RUTHERFORDgN
NOTES:
~IE,.COPIES LTTR ENCL RECIPIENT ID CODE/NAME YOUNGBLOODgB 05 HILSONg JERRY 07 AEOD 18<D/DIR HUM FAC15 EDO 8 STAFF 19 HYD/GEO BR 22 LIC QUAL BR 12 NRC PDR 02 REV 13 REG 01 STANDRDS DEV 21 COPIES LTTR ENCL EXTERNAL: ACRS NSIC ib 08 LPDR 03 Ii i)(1981 TOTAL NUMBER OF COPIES REQUIRED: LTTR 40 ENCL tt 4 t ,l Jl 4 I>)r 4 tf FORM 21 File: SH N-2/18 Xtem 12 CITAL Carolina Power 8 Light Company Raleigh, N.C.27602 December 30, 1980?R.James P.O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNXTS 1, 2., 3 AND 4 DOCKET NOS.50-400, 50-401, 50-402 AND 50-403 DEFXCIENCIES IN-THE PRGCUREIMZZ, FABRICATION AND INSPECTION OF ENQIHEERED PLATES FOR CONCRETE mraEDIZVr AIe SUPPORT OF SAFETY RELATED LOADS-INTERIM REPORT OPEN IT&I 400 AND 401/79-14-01, 402 AND 403/79-13-01
REC   IP IENT         COPIES            RECIPIENT            COPIES ID CODE/NAME          LTTR ENCL        ID CODE/NAME         LTTR ENCL ACTION:     A/D LICENSNG 04                         YOUNGBLOODgB 05 RUSHBROOKIM ~ Ob                         HILSONg JERRY 07 INTERNAL:   AD/RC   I/IE       17                   AEOD            18<
ASLBP/JeHARD                             D/DIR  HUM  FAC15 DIR g DI V OF LIC                       EDO 8 STAFF      19 EQUIP QUAL BR 1 1                       HYD/GEO BR       22 ISE                09                    LIC QUAL BR 12 MPA                20                    NRC PDR         02 OELD              21                                REV 13 QA BR                                    REG             01 RUTHERFORDgN ~ IE,.                      STANDRDS DEV 21 EXTERNAL: ACRS                 ib                   LPDR             03 NSIC              08 Ii i) ( 1981 TOTAL NUMBER OF COPIES REQUIRED: LTTR               40   ENCL


==Dear?Ir.O'Reilly:==
tt 4  t
As noted in our November 14, 1980, interim report on the subject deficiency, one remaining plate needed to be cleared before submitting a final report.Since that time the one remaining plate has been cleared.11owever, in clearing this plate subsequent information concerning six additional plates in this area was provided to the Engineer.The Engineer reanalyzed the six other plates wnich have subsequently been questioned.
,l Jl 4
We are presently in the process of performing additional ultrasonic examinations on these six plates.Re-examination of one of the six plates has indicated that there is sufficient weldment present to meet design criteria.We are moving forward on re-examining the remaining five plates.Xt is now anticipated that the re-evaluation/corrective action on the additional plates will be completed by March 1, 1981, at which time the final 10CFR50.55(e) report will be submitted.,Thank you for your consideration in this matter.NJC/mt (1209)Yours very truly, cco M5 ca~'j.gl g,~C Mr.G.iMr.V.Maxwell Stello (2~l Oijginal Signa" Bhi N]I;hiangi N.J.Chiangi-Ifanager Engineering
I>
&Construction Quality Assurance CX5 Q1 ll D lf~I}}
              )r 4
tf
 
FORM 21 File:        SH  N-2/18 CITAL Carolina Power 8 Light Company Xtem 12                      Raleigh, N.C. 27602 December 30, 1980
        ?R. James P.        O'Reilly United States Nuclear Regulatory Commission Region      II 101      Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNXTS 1, 2., 3 AND 4 DOCKET NOS. 50-400, 50-401, 50-402 AND            50-403 DEFXCIENCIES IN- THE PRGCUREIMZZ, FABRICATION AND INSPECTION OF ENQIHEERED PLATES FOR CONCRETE mraEDIZVr AIe SUPPORT OF SAFETY RELATED LOADS  INTERIM REPORT OPEN IT&I 400 AND 401/79-14-01, 402 AND 403/79-13-01
 
==Dear ?Ir.     O'Reilly:==
 
As noted in our November 14, 1980, interim report on the subject deficiency, one remaining plate needed to be cleared before submitting a final report.
Since that time the one remaining plate has been cleared. 11owever, in clearing this plate       subsequent information concerning six additional plates in this area was     provided to the Engineer. The Engineer reanalyzed the six other plates wnich have subsequently been questioned.                 We are presently in the process of performing additional ultrasonic examinations on these six plates. Re-examination of one of the six plates has indicated that there is sufficient weldment present to meet design criteria. We are moving forward on re-examining the remaining five plates. Xt is now anticipated that the re-evaluation/corrective action on the additional plates will be completed by March 1, 1981, at which time the final 10CFR50.55(e) report will be submitted.
        ,Thank you       for your consideration in this matter.
NJC/mt       (1209)                                               Yours very truly, cco       Mr. G. Maxwell iMr. V. Stello Oijginal Signa" Bhi
                              ~l (2 M5                                                            N ] I;hiangi N. J. Chiangi Ifanager ca~'j.gl                                                      Engineering & Construction g,~C Quality Assurance CX5
 
Q1 ll D
lf ~ I}}

Latest revision as of 05:05, 22 October 2019

Interim Deficiency Rept Re Deficiencies in Procurement Fabrication & Insp of Engineered Plates for safety-related Load Concrete Embedment & Support.Addl Ultrasonic Exams Being performed.Re-evaluation/correction Completion 810301
ML18017B305
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 12/30/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8101070437
Download: ML18017B305 (4)


Text

REGULAT ( INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:8101070437 DOC ~ DATE! 80/12/30 NOTARIZED: NO DOCKET FACIL:50"400 Shearon Harris Nuclear Power Plant~ Unit 1~ Carolina 05000400 50-401 Shearon Harris Nuclear Power Planti Unit 2~ Carolina .05000401 50-402 Shearon Harris Nuclear Power Plantr Unit 3i Carolina 05000402 50'403 Shearon Harris Nuclear Power Plant~ Unit 4~ Carolina 05000403 AUTH INANE AUTHOR AFFILIATION CHIANGI~N.J ~ Carolina Power L Light Co ~

RECIP.NAME RECIPIENT AFFILIATION O'REILLYg J ~ P ~ Region 2i Atlanta, Office of the Director S UBJECT: Interim deficiency rept re deficiencies in procurement fabrication 8 insp of engineered plates for safety related load concrete embedment 8, support.Addi ultrasonic exams being performed.Re-evaluation/correction completion 810301, DISTRIBUTION CODE: B019S COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Construction Deficiency Repor t (10CFR50.55E)

NOTES:

REC IP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION: A/D LICENSNG 04 YOUNGBLOODgB 05 RUSHBROOKIM ~ Ob HILSONg JERRY 07 INTERNAL: AD/RC I/IE 17 AEOD 18<

ASLBP/JeHARD D/DIR HUM FAC15 DIR g DI V OF LIC EDO 8 STAFF 19 EQUIP QUAL BR 1 1 HYD/GEO BR 22 ISE 09 LIC QUAL BR 12 MPA 20 NRC PDR 02 OELD 21 REV 13 QA BR REG 01 RUTHERFORDgN ~ IE,. STANDRDS DEV 21 EXTERNAL: ACRS ib LPDR 03 NSIC 08 Ii i) ( 1981 TOTAL NUMBER OF COPIES REQUIRED: LTTR 40 ENCL

tt 4 t

,l Jl 4

I>

)r 4

tf

FORM 21 File: SH N-2/18 CITAL Carolina Power 8 Light Company Xtem 12 Raleigh, N.C. 27602 December 30, 1980

?R. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNXTS 1, 2., 3 AND 4 DOCKET NOS. 50-400, 50-401, 50-402 AND 50-403 DEFXCIENCIES IN- THE PRGCUREIMZZ, FABRICATION AND INSPECTION OF ENQIHEERED PLATES FOR CONCRETE mraEDIZVr AIe SUPPORT OF SAFETY RELATED LOADS INTERIM REPORT OPEN IT&I 400 AND 401/79-14-01, 402 AND 403/79-13-01

Dear ?Ir. O'Reilly:

As noted in our November 14, 1980, interim report on the subject deficiency, one remaining plate needed to be cleared before submitting a final report.

Since that time the one remaining plate has been cleared. 11owever, in clearing this plate subsequent information concerning six additional plates in this area was provided to the Engineer. The Engineer reanalyzed the six other plates wnich have subsequently been questioned. We are presently in the process of performing additional ultrasonic examinations on these six plates. Re-examination of one of the six plates has indicated that there is sufficient weldment present to meet design criteria. We are moving forward on re-examining the remaining five plates. Xt is now anticipated that the re-evaluation/corrective action on the additional plates will be completed by March 1, 1981, at which time the final 10CFR50.55(e) report will be submitted.

,Thank you for your consideration in this matter.

NJC/mt (1209) Yours very truly, cco Mr. G. Maxwell iMr. V. Stello Oijginal Signa" Bhi

~l (2 M5 N ] I;hiangi N. J. Chiangi Ifanager ca~'j.gl Engineering & Construction g,~C Quality Assurance CX5