MONTHYEARML19319D8981978-02-28028 February 1978 Amend 19 to License DPR-54,adding License Conditions to Completion of Fire Protection Mods Project stage: Other ML19319D9021978-02-28028 February 1978 Safety Evaluation for Fire Protection Sys Supporting Amend 19 to License DPR-54 Project stage: Approval ML19319D8961978-02-28028 February 1978 Forwards Amend 19 to License DPR-54,safety Evaluation & Notice of Issuance & Availability.Requests Addl Info by 780301 Project stage: Approval ML19319D9031978-02-28028 February 1978 Notice of Issuance & Availability of Amend 19 to License DPR-54 Project stage: Other ML19309B0561978-08-28028 August 1978 Submits Proposed Mod Design Details Re Fire Protection in Response to NRC 780228 Request for Addl Info Per Fire Protection Safety Evaluation.Revision of OL Amend 19 Requested to Delete Ref to Fire Area 50 Project stage: Request ML19256A6141978-12-14014 December 1978 Amend 25 to License DPR-54 Revising Completion Date for Mods Intended to Improve Level of Fire Protection at Facility Project stage: Other ML19256A6151978-12-14014 December 1978 Safety Evaluation Supporting Amend 25 to License DPR-54 Project stage: Approval ML19256A6111978-12-14014 December 1978 Forwards Amend 25 to License DPR-54 in Response to 781201 Application.Revises Completion Date for Mods Intended to Improve Fire Protection at Facility.Also Forwards Suppl 1 to Fire Protection Safety Evaluation Supporting Amend Project stage: Approval ML19256A6181978-12-14014 December 1978 Notice of Issuance & Availability of Amend 25 to License DPR-54 Project stage: Other ML20147H1371978-12-14014 December 1978 Approves Supplemental Info Re Section 3 of Fire Protection Ser,Including Installation of Thermal Insulation on Channel A,C & D Conduits,Mod of Lube Oil Pump Control Circuits Associated W/Hpis & Procedures for Diesel Generators Project stage: Other ML19257D6631980-01-17017 January 1980 Advises of Acceptability of Designs Proposed for Implementing Mods Re NRC Fire Protection Safety Evaluation Sections 3.1.30(2) & 3.1.31(2).Makeup Pump Room & Penetration Valve Area Altered to Assure Safe Shutdown Project stage: Approval ML19340B3881980-09-25025 September 1980 Forwards Questions Re Proposed Amend 68 to Tech Specs Project stage: Other ML17328B0571980-11-24024 November 1980 Ltr to All Power Reactor Licensees W/Plants Licensed Prior to 790101.Forwards Revised Section 10CFR50.48 & App R Re Fire Protection Features in Nuclear Power Plants & List of Requirements for Resolution of Open Issues.W/O Encl Project stage: Other ML20126F9621981-03-17017 March 1981 Ceramic Fiber Blanket Wrap for Fire Protection of Cable Trays & Conduits Project stage: Other ML19343C5151981-03-17017 March 1981 Discusses Util Plans for Implementing App R Requirements to 10CFR50 Re Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101,in Response to NRC 810220 Request.Reassessment of Each Fire Area Encl Project stage: Other ML20010E3091981-08-20020 August 1981 Safety Evaluation Supporting Amend 35 to License DPR-54 Project stage: Approval ML20010E3111981-08-20020 August 1981 Notice of Issuance of Amend 35 to License DPR-54 Project stage: Approval ML20010E3051981-08-20020 August 1981 Forwards Amend 35 to License DPR-54,safety Evaluation & Notice of Issuance.Amend Revises Tech Specs to Incorporate Newly Installed Fire Protection Sys Project stage: Approval ML20010E3081981-08-20020 August 1981 Amend 35 to License DPR-54 Revising Tech Specs to Incorporate Newly Installed Fire Protection Sys Project stage: Other ML20038A9151981-11-19019 November 1981 Forwards Sketches of Raceway Layout in Fire Area 47 of Facility,In Response to Gage-Babcock Associates,Inc Request. Trays M39A1,M39AG1 & M39AD8 Have Been Insulated W/Kaowool Blankets.Table Re Function of Raceway Cables Encl Project stage: Other ML20039D5401981-12-14014 December 1981 Advises of Postponement Until 820122,for Installation of Control Room Emergency Lights Required by 10CFR50.48. Installation of Lights Requiring Outage for Placement Will Begin Sept 1982.Delays Due to Late Deliveries Project stage: Other ML20040C8211982-01-0707 January 1982 Special Rept:Due to TMI-related Mods,Several Fire Barrier Penetrations Have Been non-functional for Periods Greater than 7 Days Project stage: Other ML20040E2041982-01-12012 January 1982 Forwards Safety Evaluation of Westinghouse Basic Safety Rept.Transient Analysis for Startup of Inactive Reactor Coolant Pump,Excess Load & Loss of Normal Feedwater Acceptable Project stage: Approval ML20041A9801982-02-12012 February 1982 Advises That NRC Will Conduct Fire Protection Review on 820208 to Evaluate Util 810317 Request for Exemptions from Section III.G.2 & Iii.J of App R to 10CFR50.Social Security Info Withheld Per Privacy Act Project stage: Other ML20263M6301983-03-0909 March 1983 Tray Lay-out Fire Area 34. No Drawing Date Project stage: Other ML20024D0711983-07-28028 July 1983 Forwards Description of Proposed Equipment & Outline of Procedure to Be Followed to Meet App R Requirement Re Alternate Shutdown Capability,In Response to NRC 830110 Exemption Request Denial Project stage: Other ML13333B9181983-08-0404 August 1983 Advises That Only Rancho Seco & San Onofre 1 in Region V Remain to Be Inspected Per 10CFR50,App R,Section Ii.G Re Fire Protection.Rancho Seco to Be Inspected Between Mar & Sept 1984.San Onofre 1 to Be Inspected in Late FY85 Project stage: Other ML20261C2971983-09-0707 September 1983 One Line Diagram:4160 Volt System. Sheet 2 Project stage: Other ML20261C3011984-01-0707 January 1984 One Line Diagram:480 Volt System. Sheet 1 Project stage: Other ML20261C3061984-01-24024 January 1984 One Line Diagram:480 Volt System. Sheet 8 Project stage: Other ML20261C3191984-02-0505 February 1984 One Line Diagram:120 Volt AC System. Sheet 1 Project stage: Other ML20261C3151985-04-0505 April 1985 One Line Diagram:125 Volt DC System Project stage: Other ML20261C3111985-04-0505 April 1985 One Line Diagram:480 Volt System. Sheet 8A.Rev Date Illegible Project stage: Other ML20127H4351985-05-16016 May 1985 Provides Info on Changes to 850515 Nuclear Svc Electric Bldg Fire Hazards Analysis Rept,Emergency Lighting Compliance to Section Iii.J of App R & Automatic Suppression of Fire Areas 81 & 82,per 850510 Meeting Project stage: Meeting ML20128N5611985-05-20020 May 1985 Summarizes 850206 Meeting W/Util Re Fire Protection.List of Attendees & Meeting Agenda Encl Project stage: Meeting ML20128Q5921985-05-24024 May 1985 Forwards Addl Requests for Exemptions from 10CFR50,App R for Auxiliary Bldg Roof Area (Fire Area 74),nuclear Svc Yard Area (Fire Area 69) & Nuclear Svc Cooling Water Surge Tank Level Switches.Encl Suppls 850228 & 0404 Submittals Project stage: Other ML20128K7491985-07-12012 July 1985 Summary of Operating Reactor Events Meeting 85-11 on 850701. List of Attendees,Events Discussed,Significant Elements of Events & Assignment of Followup Review Responsibility Encl Project stage: Request ML20129C2481985-07-12012 July 1985 Forwards Revised Response to Generic Ltr 81-12 Re Alternative Shutdown Capability for Computer & Control Room, Per 850506,13 & 20 Telcons & 850618 Meeting Project stage: Meeting ML20133H6371985-07-31031 July 1985 RO 85-09:on 850702,Cardox (CO2) Fire Suppression Sys Reported Inoperable for 14 Days.Sys Deenergized Due to Failure of Fire Doors to Withstand Sys Discharge Pressure W/O Opening.Latching Mechanism Changed Project stage: Other ML0311507181985-09-27027 September 1985 Withdrawn NRC Generic Letter 1985-018: Operator Licensing Examinations Project stage: Request ML20137W1741985-09-27027 September 1985 Forwards Addl Clarifying Info to 850712 Response to Generic Ltr 81-12 Re Alternative Shutdown Capability for Computer & Control Room Project stage: Other ML20138M9991985-10-30030 October 1985 Submits Addl Info Re Alternative Shutdown Capabililty for Computer & Control Room.Procedure C.13B to Change Pressurizer Level as Required by Analysis Will Be Revised by 860201 Project stage: Other ML20198C2341985-11-0707 November 1985 Forwards Revised Requests for Exemptions from Requirements of 10CFR50,App R,Including Update of Previous Requests List of Required Mods & Respective Schedule for Installation & Addl Request Re Lack of Suppression in Control Room Project stage: Other ML20141M9551986-01-29029 January 1986 Notice of Environ Assessment & Finding of No Significant Impact Re 850228 & 1107 Requests for Exemption from 10CFR50 App R Extending Time to Reach Cold Shutdown Under Natural Circulation W/No Offsite Power to 72 H Project stage: Approval ML20141M9521986-01-29029 January 1986 Informs That Commission Requested Publication of Encl Fr Notice of Environ Assessment & Finding of No Significant Impact Re 850228 & 1107 Requests for Exemption from Subsection Iii.L of 10CFR50,App R Project stage: Approval ML20206F8801986-05-19019 May 1986 Exemption from Requirements of 10CFR50,App R,Subsection Iii.L Re Capability to Achieve Cold Shutdown in 72 H. Alternative Shutdown Capability Should Be Able to Achieve Cold Shutdown Conditions in 205 H Project stage: Approval ML20206F9071986-05-19019 May 1986 Safety Evaluation Supporting Util Request for Exemption from Requirements of 10CFR50,App R,Subsection Iii.L Re Capability to Achieve Cold Shutdown in 72 H Project stage: Approval ML20206F8651986-05-19019 May 1986 Forwards Exemption from Subsection Iii.L of 10CFR50,App R Re Capability to Achieve Cold Shutdown in 72 H & Safety Evaluation Supporting Util Request for Exemption from Subsection of 10CFR50,App R Project stage: Approval ML20215K5581987-06-17017 June 1987 Forwards Environ Assessment & Finding of No Significant Impact,In Response to Util Requests for Exemptions from 10CFR50,App R Requirements Project stage: Other ML20215K5921987-06-17017 June 1987 Environ Assessment & Finding of No Significant Impact Supporting Requests for Exemptions from 10CFR50,App R Requirements Re Fire Protection Program Project stage: Other 1983-08-04
[Table View] |
Text
_
bbb May 19,1986 Docket No. 50-312 DISTRTRUTTON SMiner L PDR RWeller Mr. Ronald J. Rodriguez PBD-6 Rdg ACRS-10 Assistant General Manager, Nuclear FMiraglia Gray File Sacramento Municipal Utility District 0 ELD EBrach 6201 S Street EJordan H0rnstein P. O. Box 15830 BGrimes Sacramento, California 95813 JPartlow
Dear Mr. Rodriguez:
By letter dated February 28, 1985, as supplementad November 7, 1985, you requested an exemption from Subsection III.L of Appendix R to 10 CFR 50 to the extent that it requires the capability to achieve cold shutdown in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. We have completed our review of your request and have granted the requested exemption as discussed in the enclosed Exemption (Enclosure 1). A copy of the Exemption is being filed with the Office of the Federal Register for publication.
In our January 10, 1983, letter, we denied your requested exemption from the requirements of 10 CFR 50, Appendix R, Section III.G.2, for safe shutdown capability as applied to the control and computer room. Subsequently, by letters dated November 30, 1983, April 5, 1985, July 12, 1985, September 27, 1985, and October 30, 1985, you submitted the design of a proposed alternate shutdown capability for the control and computer room, control and computer corridor and the auxiliary building roof (where essential control room heating, ventilating and air canditioning equipment is located). Based on the information you submitted and allowing for the 72-hour cold shutdown exemption as stated above, the alternate shutdown capability for the computer i
and control room, computer and control room corridor, and the auxiliary building roof area is in accordance with the " iteria of Appendix R, Subsections III.G.3 and III.L, and is, theref e, acceptable. Our Safety Evaluation (SE) is enclosed (Enclosure 2) fr your information.
Sincerely, aca10.uL sIcum 3r JCCi F. Sl%P >
John F. Stolz, Director PWR Project Directorate #6 Division of PWR Licensing-B
Enclosures:
As Stated cc w/ enclosures:
See next pate f
kW j
SMine,cfG(k6 OELDl PBD-6 PB PBD-6 PB PUD-6 d
B PBD-6f+
MSkidM awan RWeller JSt A JWermiel
/F ita Ringram a
5/9/86 5/;V/86 5/f t/86 5//A/86 5/
'l 5//3/86 5//q/86 sfg ;g 8606250010 860519 PDR ADOCK 05000312 I
F CDR
DISTRIBUTION:
June 5,1986 Docket File PBD#6 Rdg May 24--1986-RIngram DOCKET NO.
Rules and Procedures Branch MEMORANDUM FOR:
Division of Rules and Records Office of Administration FROM:
Office of Nuclear Reactor Regulation
SUBJECT:
RANCHO SECO NUCLEAR GENERATING STATION One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies (
5
) of the Notice are enclosed for your use.
Notice of Receipt of Application for Construction Permit (s) and Operating License (s).
Notice of Receipt of Partial Application for Construction Permit (s)and Facility
~
License (s). Time for Submission of Views on Antitrust Matters.
Notice of Consideration of Issuance of Amendment to Facility Operating License.
Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License (s) and Notice of Opportunity for Hearing.
Notice of Availability of NRC Draf t/ Final Environmental Statement.
Notice of Limited Work Authorization.
Notice of Availability of Safety Evaluation Report.
Notice of Issuance of Construction Permit (s).
Notice of Issuance of Facility Operating License (s) or Amendment (s).
Order.
h Exems. tion.
Notice of Granting Exemption.
Environmental Assessment.
Notice of Preparation of Environmental Assessment.
Other:
Office of Nuclear Reactor Regulation PWR Project Directorate !S, PWR-0
Enclosure:
As stated
Contact:
Phone:
PBD#6
,Ingr cf R
su:naus>
nn-6/8 86 I
/
c rnu sie no<eo, uncu o24o OFFICIAL RECORD COPY
Fr. R.
- 1. Rodriguez Rancho Seco Nuclear Generating Sacranento Municipal Utility District Station 1
cc:
Mr. David S. Kaplan, Secretary Sacramento County and General Counsel Board of Supervisors Sacramento Municipal Utility 827 7th Street, Room 424 District Sacramento, California 95814 6201 S Street P. O. Box 15830 Ms. Helen Hubbard Sacramento, California 95813 P. O. Box 63 Sunol, California 94586 Thomas Baxter, Esq.
Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. Robert B. Borsum Dabcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Resident Inspector / Rancho Seco c/o U. S. N. R. C.
14410 Twin Cities Road neraia, California 95638 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 01 rector Energy Facilities Siting Division Energy Resources Conservation &
Development Commission 1516 - 9th Street Sacramento, California 95814 1ernrh 0. Ward, Chief Radiological Health Branch Ltatt Department of Health Services 714 P Street, Office Building #8 Sacramento, California 95814 i
1
,~