ML20195D185
ML20195D185 | |
Person / Time | |
---|---|
Site: | Rancho Seco |
Issue date: | 05/27/1999 |
From: | Redeker S SACRAMENTO MUNICIPAL UTILITY DISTRICT |
To: | Weiss S NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
Shared Package | |
ML20195D188 | List: |
References | |
MPC&D-99-089, MPC&D-99-89, NUDOCS 9906090096 | |
Download: ML20195D185 (1) | |
Text
+
-(lSMun SACRAMENTO MUNICIPAL uTIUTY DISTRICT O P. O. Box 15830, Sacramento CA 95852-1830, (916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA MPC&D 99-089 May 27, 1999 i
1 U. S. Nuclear Regulatory Commission Attn: Document Control Desk
)
Washington, D. C. 20555 j
Docket No. 50-312 Rancho Seco Nuclear Station License No. DPR-54 RANCHO SECO ANNUAL REPORT Attention: Seymour Weiss The District submits the Rancho Seco Annual Report in accordance with Rancho Seco Permanently Defueled Technical Specifications (PDTS) D6.9.4 and D6.9.6b, and 10 CFR 50.59(b)(2). The enclosed report contains (1) shutdown statistics, (2) a narrative summary of shutdown experience, (3) Environmental Report information, and (4) a tabulation of facility changes, tests, and experiments required pursuant to 10 CFR 50.59(b).
The enclosed report covers the period May 7,1998, through May 6,1999. The NRC approved the original PDTS, which included the current Rancho Seco Annual Report requirement,in April 1992, and the District implemented the PDTS on May 7,1992. Prior to May 1992, Rancho Seco i
submitted monthly reports in accordance with the Operating Plant Technical Specifications.
Members of your staff requiring additional information or clarification may contact Richard Mannheimer at (916) 732-4916.
Sincerely, ff.
4Ste
. Redeker Manager I
Plant Closure & Decommissioning l
Enclosure cc w/ Encl:
E. W. Mecschoff, NRC, Arlington, Texas R. Dudley, NRC, Rockville 9906090096 990527 id PDR ADOCK 05000312
,i R
PDR,
RANCHO SECO NUCLEAR GENERATING STATION O 14440 Twin Cities Road, Herald, CA 95638-9799;(209) 333-2935