ML031150718

From kanterella
Jump to navigation Jump to search

Withdrawn NRC Generic Letter 1985-018: Operator Licensing Examinations
ML031150718
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Skagit, Marble Hill
Issue date: 09/27/1985
From: Thompson H
Office of Nuclear Reactor Regulation
To:
References
GL-85-018, NUDOCS 8509240248
Download: ML031150718 (6)


Text

Withdrawn NRC Generic Letter 1985-18, Operator Licensing Examinations, dated September 27, 1985, has been withdrawn.

ADAMS Accession Number: ML031150718 See Federal Register notice 81 FR 31969, dated May 20, 2016

UNITED STATES e 8NUCLEAR REGULATORY COMMISSION WASHINGTON, 0. C. 20555 September 27, 1985 TO ALL POWER REACTOR LICENSEES AND APPLICANTS FOR AN OPERATING LICENSE Gentlemen:

Subject:

OPERATOR LICENSING EXAMINATIONS (Generic Letter 85-18)

To update the schedules you provided in response to Generic Letter 85-04, please provide the best estimate of your needs for operator licensing examinations for fiscal years FY 1986, FY 1987, FY 1988 and FY 1989 (October 1 to September 30 of each year). You are also requested to provide requalification examination schedules for this same time period. Please identify the dates you have scheduled requalification examinations and anticipated requests for licensing examination site visits and the numbe' of examinations for each visit. This information is needed to plan our resource requirements consistent with your operator licensing needs.

Because of continued budget limitations, we will attempt to limit examinations to two visits per site each year. To meet this goal the regional offices may be required to redistribute the requested facility operator examination visits across the entire fiscal year to even out the examination work load and eliminate high demand periods. Therefore, your submittal of this schedule does not guarantee the number or date of examinations requested. However, a best estimate of your needs for examinations will allow us to propose budget modifications, if necessary. Please keep us informed of significant changes in your estimates as they occur, so we can keep our data base current.

Your schedules, in the enclosed suggested formats, should be returned to Mr. Bruce Boger, Acting Chief, Operator Licensing Branch, AR-5221, Washington, DC 20555, with a courtesy copy to the appropriate Regional Administrator within 30 days of the receipt of this letter and in no event later than November 1, 1985. We appreciate your assistance. If you have any questions concerning this request or your response, please call Mr. Bruce Boger, Acting Chief, Operator Licensing Branch, at (301) 492-4868.

This request was approved by the Office of Management and Budget under clearance number 3150-0131 which expires August 31, 1988. Comments on burden DO240

and duplication may be directed to the Office of Management and Budget, Reports Management, Room 3208, New Executive Office Building, Washington, D.C. 20503.

Sincerely, H

D

'9 L. Thompson Jr sion of Licensi irector

Enclosures:

1. Operating Licensing Examination Schedule 2.. Requalification Examination Schedule
3. List of Generic Letters et9WsAt ' SA
  • I r I .

or I or. . p *' $ 4 I \I J .

v Enclosure I OPERATOR LICENSING EXAMINATION SCHEDULE Facility NRC Region FY 1986 FY 1987 FY 1988 FY 1989

1. Date__ Date Date Date
  1. RO
  1. SRO_-_____
  1. SRO Upgrade
  1. Instructor Certification
  1. SRO Limited to Fuel Handling--
2. Date Date Date Date
  1. RO_-__
  1. SRO
  1. SRO Upgrade
  1. Instructor Certification
  1. SRO Limited to Fuel Handling.,
3. Date Date Date Date
  1. RO___._.__
  1. SRO__
  1. SRO Upgrade -
  1. Instructor Certification
  1. SRO Limited to Fuel Handling .-

Please indicate initial cold license examinations by placing an asterisk (*)

by the date. Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**) (e.g., Unit One is in operation and Unit Two is approaching fuel load. Three RO candidates with no previous license are to be examined on both Units One and Two and five RO candidates with licenses on Unit One are to be examined to extend their licenses to Unit Two. Indicate (2/15/85, RO 3,5**)).

Enclosure 2 REQUALIFICATION EXAMINATION SCHEDULE Facility__ __ NRC Region_

FY 1986 FY 1987 FY 1988 FY 1989

1. Date Date Date Date_
2. Date Date_ Date Date
3. Date Date Date_ Date
4. Date_ Date Date Date

Kv LIST OF RECENTLY ISSUED GENERIC LETTERS GENERIC LETTER NO. SUBJECT DATE 85-03 Clarification of Equivalent Control Capacity 1/28/85 For Standby Liquid Control Systems 85-04 Operator Licensing Examinations 1/29/85 85-05 Inadvertent Boron Dilution Events 1/31/85 85-06 Quality Assurance Guidance for ATWS Equipment that is not Safety-Related 4/16/85 85-07 Implementation of Integrated Schedules 5/02/85 for Plant Modifications 85-08 10 CFR 20.408 Termination Reports - Format 5/23/85 85-09 Technical Specifications for Generic Letter 83-28, Item 4.3 5/23/85 85-10 Technical Specifications for Generic Letter 83-28, Items 4.3 and 4.4 5/23/85 85-11 Completion of Phase II of "Control of 6/28/85 Heavy Loads at Nuclear Power Plants" NUREG-0612 85-12 Implementation of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps" 6/28/85 85-13 Transmittal of NUREG-1154 Regarding the Davis Besse Loss of Main and Auxiliary Feedwater Event 8/5/85 84-14 Commercial Storage at Power Reactor Sites of Low Level Radioactive Waste not Generated by the Utility 8/1/85 85-15 Information Relating to the Deadlines for Compliance with 10 CFR 50.49, "Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants 8/6/85 85-16 High Boron Concentrations 8/23/85 85-17 Availability of Supplements 2 & 3 to NUREG-0933, "A Prioritization of Generic Safety Issues 8/23/85 85-18 Operator Licensing Examinations 9/27/85 85-19 Reporting Requirements on Primary Coolant 9/27/85 Iodine Spikes