Text
...
i.i,.g
^f
-l 4 g
'o,j UMTED STATES e-Y*
8-NUCLEAR REGULATORY COMMISSION c
.~ $
RE060N V y
1460 MARIA LANE, SulTE 210 e.
,8 WALNUT CREEK, CALIFORNIA M596 June 28, 1990 Docket No. 50-312 Rancho Seco Nuclear Generating Station Sacramento Municipal Utility District 14440 Twin Cities Road Herald, California 95638-9799 Attentioa:
Mr. D. R. Keuter, Assistant General Manager Nuclear Gentlemen:-
Subject:
Deferral of Commitments (TAC 75497)
This; refers to your-lettersLof November 29, 1989, February 21, 1990, and March 27,.1990, which described those items in your Computerized Commitment Tracking System, Long Range Scope List, and the Effluents and Water Management Project ( Action Plan which will be delayed or indefinitely deferred. We have performed a preliminary revied of those items. The bases of our review was to determine which items could affect those systems ^in the operable, available, or prudent-to-operate _ categories.. 11sts those items for which additional information is required to determine the acceptability of the delays or deferrtis.- In general, our comments relate to the: effects of the deferral of certain commitments on those systems currently designated as operable available, or.
. prudent-to-operate.
In some instances, these effects were not clearly described.: In addition,-the commitments related to NRC Generic Letters need to-be addressed individually in more depth, particularly 'related to-their impact on the operable, available, and prudent-to-operate systems. _We~have reviewed the evaluation of the commitments related.to liquid effluents and Lyour proposed disposition of.them in an. inspection conducted May:8 -'11, w
-1990. 'The results are described in Inspection Report 50-312/90-08, h tr at ~
inspection report we conclude that the deferral of commitments in_ thr liquid;
' effluents area is acceptable.
For those items listed in Attachment 1, we propose to meet with your staff n idiscuss the items or you may provide a written response for our review.
Please coordinate your response with Howard Wong, of my staff.
1
'9007090084 900628 LPDR ADOCK 05000312 l
PDL P:
'i
.2 ror those items not listed in Attachment 1, we conclude that deferral of these items is acceptable. However, we expect that any deferred comitments will be retrievable.and appropriately tracked to assure that in the event of the restart of_the-Rancho Seco facility these items will be available in sufficient detail for evaluation, i
Should you have any questions concerning this letter, we will be pleased--to discuss,them with you.
Sinc ly,
's M
. Martin Regional Administrator
Enclosure:
As Stated cc:
J. Shetler, SMUD J. Delezenski, SMUD-l l
t u
I L,,
- El I. I a
(
3
.7-:..
a bec: Docket File'
' Project Inspector
-Resident Inspector 4
G;-' Cook -
B. Faulkenberry J. Martin M. Smith T..Murley, NRR J. Partlow, NRR J. Larkins, NRR S. Reynolds, NRR M. Slosson, OE00-Pet Kua~.
REGION Yi 8""*"#
. g4 HWong JLarkNs1 RScar SRichards RZimerman
& /y'/90 4//y/90 4 /j 90 t, /4 6 /90 6 /1 4/90 JEST COPY '
{ST COPY '
R ST COPY EST COPY ~
EST. COPY ~
ES) / N0
'. Y S )/ N0 ES / NO
/'YES / N0 S / N0
~
y V
.JMar1)n
} M /90 REQUEST COPY,J YES / NO 0 PDR ;
NO l,..
t r
f
- s,.
mg,. ! ( !
j t-
, ' ( t.
scn
+
[.
^
1 t
j x.
ATTACHMENT 1 ITEMS FOR WHICH FURTHER INFORMATION IS REQUIRED Computerized Commitment Tracking System (CCTS)-
D_escription Item Number e
860428003 Fuel handling equipment maintenance-could possibly be used for fuel movement during investigation of the spent
)
fuel pool leak or removal of fuel during deconinissioning 860715004 Info. Notice 85 lightning strike could cause loss of' power to site 861105109 Info. Notice 86 loss of offsite power on automatic bus transfer-potential for loss of offsite power 870112301 Info. Notice 86-100 - loss of offsite power to vital-buses-potential for loss of offsite power 870424136 Info. Notice 86 springs in Westinghouse MCCs-potential effects on systems 871027101 LER 87 C02 system-are interim methods described in deferral discussion in place and formalized in procedures-c
- 880229005 NUREG 0737 - control room /TSC habitability-impact on-control room cooling
.880718002 Info. Notice 88 protective relay and circuit breaker coordination-potential effects on systems 880907001 LER 88 missed firewatches-effects on adequacy of-fire protection provisions 1
880927002 Info. Notice 88-75-- disabling EDG output breakers-effect on back-up Bruce Enq
.t 881025002:
Info. Notice 88 Shaft keys in Limitorque MOV-actuators-potential effects on systems 881214012 Management Mtg 11/14/88 - various items-potential effect 4
on systems 890109002-Management Mtg-11/14/88 - nuisance alarms in control' l
room-effects on current operations.
890310007 Info. Notice 89 molded case circuit breakers-i' potential effects on systems 890515013 SALP response - EP program' maintenance manual - root >
cause of several enforcement issues
?
890621001 LER-87 fire protection program deficiencies-fire-protection still required in current plant condition Generic Letters:-
861106370' GL 85 nozzle cracking 880323002 and GL 89-10 and Info. Notices 85-03 and 89 MOVs 890725006 880602015 and.GL 88 RCS pressure boundary closure assembly 880602017 practices 881212002 GL 88-20 + Supp 1 - severe accidents (IPE) 890201000 and GL 88 loss of decay heat removal
+
890201005
-890217002 GL 88 instrument air 890330003 and GL 88 heatup and cooldown rates 890330005
.(
,f 2
+i fjf.'
890525002' GL 88 erosion / corrosion induced pipe wall thinning 891006001 GL 89 systems interactions 891012002 and GL 89 Safety issue A-47 891012003'
~
r
-LongRangeScopeList(LRSL)-
i Item Number Description T'y EDS125NV-365 Penel breakers do not conform to UFSAR 3'
4 EDS
-472 TSC power supply marginal MGT/EN -813 Fuse control program problems y
MGT/TR -1036 ' Training of maintenance personnel.
j EDS
-1225 Small oil-filled transformers have corroded tap changers and some use tie wrap to assure sufficient contact m
NRW
-1253 Insufficient or excessive flow through some essential components HVS/HVO -1372 Both Auxiliary Building exhaust fan damper control circuits. fed from same power source EGS
-1847 Manual trip-of 4KV bus supply breaker with EDG running q-could cause EDG breaker to close without synchronization EDS.
-1967 Manual operation of 4160V circuit breakers may not be physically:possible due to worker hazards during operation IAS
-2335 Instrument air local accumulators do not have a method to 7
remove water buildup Q"
MGT/MA -2347 Components serve by instrument air not routinely torn
.down and rebuilt EDS480 -2414 Indicating levers on Westinghouse MCCs do not show tripped when breaker has tripped
. CSP.
-2550 Phone system inadequate for some postulated emergency T,
-conditions
?
-2693-Consequences of loss of DC power reviewed in a piecemeal 1
manner l'
MGT/0P -2844 Plant staff comments on operation procedures MGT/EN -3018 Heat tracing L
EGS '
-3154 Diesel generator operatien concurrent with' loss of-offsite power HVS
-3528 HVAC motors discontinued and. spare parts becoming T
i unavailable
' 3909 DC power problem resolution does not agree with design-DCS criteria o
-4011 Manual fire suppression in containme t 1
p' EDS
--4039 Emergency lighting units ANS
-4121 Annunicator fire recovery project i
L, MGT/EN -4196 EQ maintenance and program deficiencies l"
and 4197 l
RDM
-4212 Continuing 3oroblems with radiation monitoring system I
\\
i l
q 4
3 ' !,
j j
i k
+. - - - -
.-.----..